The Nature Conservancy
5.0. RESTORATION APPROACH
The Nature Conservancy follows the international Society for Ecological Restoration’s
principles and key concepts for ecological restoration4. In brief, this includes:
1. The use of a reference ecosystem or model ecosystem which is uses to set
ecological targets for the project, taking environmental change into account
2. Identifying the target ecosystem’s key attributes prior to developing goals and
objectives
3. Focusing on creating the ecological ‘enabling conditions’ that lets nature restore
itself
4. Seeking ‘highest and best effort’ progression towards full recovery
5. Drawing on all available relevant knowledge sources to inform decisions
6. Early, genuine and active engagement with all stakeholders
In addition to the above principles, The Nature Conservancy also applies current best
practice approaches for shellfish reef restoration as outlined in: A Practitioners Guide to
Shellfish Restoration Design and Monitoring5. Importantly, our process includes principles
of adaptive management, whereby lessons learnt from prior research studies, pilot projects
and other restoration projects in Australia and the US are incorporated into the design and
monitoring of current and future restoration.
6.1. Project Construction Phases
The restoration or construction element of the project is split into three phases that
allow for a review of progress, targets and lessons learnt and incorporation of these
into subsequent construction periods (i.e. adaptive management principles). These
phases align with the concepts of a feasibility or pilot phase (Phase I), replicable reef
unit development (Phase II) and full restoration (Phase III).
Phase I (2016-2018)
Phase I of the project was largely undertaken by University of Sunshine Coast with
support and co-funding from Noosa Council, Noosa Parks Association, The Thomas
Foundation and Noosa Biosphere Reserve Foundation. The key objectives and
lessons learnt from Phase I include:
• An understanding of oyster recruitment potential, growth and survival at 16
different locations in the lower estuary. This information will be used in Phase
II to assist with identification of priority sites and methods for restoration
• An understanding of state government permitting and regulatory
requirements required to undertake reef restoration
• To a lesser degree, an understanding of material use, reef stability and
design of reefs
• To a lesser degree, an understanding of community assemblages likely to be
associated with restored shellfish ecosystems
4
McDonald T, Gann GD, Jonson J, and Dixon KW (2016) International standards for the practice of ecological
restoration – including principles and key concepts. Society for Ecological Restoration, Washington, D.C.
5
Brumbaugh, R. D., Beck, M. W., Coen, L. D., Craig, L., & Hicks, P. (2006). A practitioners guide to the design & monitoring of shellfish
restoration projects: an ecosystem services approach. P. Hicks. 2006. A Practitioners' Guide to the Design and Monitoring of Shellfish
Restoration Projects: An Ecosystem Services Approach. The Nature Conservancy, Arlington, VA.
Noosa River Partnership Page | 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.