Original source · versioned page text
2019-01-14 General Committee Agenda - Attachment 1 to Item 2 - Noosa River Partnership Proposal
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
The Nature Conservancy
Reef design and TNC Final construction designs and briefs and 24 months
engineering engineering recommendations. Includes
site management plan for construction.
Procurement management TNC Procurement tenders, legal contracts Ongoing
and bid management associated with
procurement of reef materials and reef
construction.
Reef construction Contractors Construction of reef base from materials 24 months
such as recycled shells, limestone or
indigenous rock. May also include
addition of oyster spat from hatchery if
necessary.
5.0. Community engagement and volunteering
Community volunteering Partner May comprise of one or more of the Ongoing
project(s) (TBD) (supported following: shell recycling, oyster (established
by TNC) gardening, OysterWatch, fish monitoring, by 12
oyster reef construction and monitoring. months)
Final project(s) to be determined during
initial stakeholder meetings during
planning stage.
Community information TNC Includes public presentations and regular Ongoing,
sessions information sessions regular
Volunteer management Partners and Includes risk assessments, public liability 12 months
TNC and management protocols for
volunteers
4. Monitoring, evaluation and reporting
Monitoring, evaluation and TNC Provides the framework and rational for 9 months
reporting plan monitoring, evaluation and reporting
Six monthly report cards TNC Provides a 2 page progress summary in 6 monthly
report card format from year 2
Annual Project Report TNC Provides a details report on the status of Annual
all project objectives and deliverables
Annual Technical TNC Provides a detailed report on the Annual
Monitoring Report monitoring and analysis of project
measures of success
Annual project review TNC In person annual review meeting for Annual
project funders and Project Advisory
Group members and including external
independent reviewers
Noosa River Partnership Page | 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.