Original source · versioned page text
2019-04-15 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 41 of 63
Project Current Proposed Revised Category Details
Budget BR3 Budget
ACHES
Planning Scheme
Stormwater Backflow Climate Change 40,000 40,000 Emergent Emergent works to undertake stormwater vulnerability
Change Adaptation Strategy and align to future
stormwater capital works.
Planning Scheme Total = 40,000, 40,000
GrandTotal = 16,265,093 - 1,423,946 14,841,947
Page 41 of 63See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.