Project fener ait Proposed Revised Category Details
Budget BR3 Budget
Xen
Shelter to Entrance forecasts.
Libraries & Galleries Total = 100,000, 23,628, 128628
Parks & Playgrounds
to 2019/20 based on planned timing of construction in 2019/20.
Parks & Playgrounds Total = 1,220,317 - 910,000, 310,377
Pathways & Boardwalks
Noosa Heads, Main Beach Boardwalk 349,057 |- 80,000 269,057 Cost Saving __ Final construction cost of project under budget due to
Construction efficient delivery and limited variations. Saving to be
realised.
Noosa Heads, Park Road Boardwalk 4,687,820 |- 490,382 4,197,438 Cost Saving Final construction cost of project under budget due to
Construction efficient delivery and limited variations. Saving to be
realised.
Shared Pathwa to 2019/20 based on planned timing of construction in 2019/20.
Pathways & Boardwalks Total = 5,436,877 - 750,382, 4,686,495
Public Amenities
to 2019/20 based on planned timing of construction in 2019/20.
Public Amenities Total == 150,000 - 80,000, 70,0000
Sealed Roads Network
and Road Reconstruction to 2019/20 based on planned timing of construction in 2019/20.
Fee ee lone arn Sorese wens io elena esse pega
ha Works
Coody Se oe orn sorese Mono len esse poor
Goodchap St Works
Roundabousana Reet Steet og ann Sarese ens to signi esesleegem
Roundabouts and Reef Street Works
Increases scope changes required to deliver the project.
Works relation to traffic island and tactile marker works.
Sealed Roads Network Total = 465,863 - 127,151, 3387120
Stormwater Drainage
eee eee oe Beach nn naee SET Inert Serene
Works Beach.
Improvement Works Works scope changes required to deliver the project.
Gympie Terrace Stormwater 50,000 30,000 80,000 Timing - Bring Planning and design costs brought forward from 2019/20
Forward to in preparation for tender.
2018/19
Stormwater Drainage Total = 117,000, 53,574 170,574
Streetscapes and Road Corridors
PamymeutsgaRonwal Wo enon ereargn it
Parkyn Hut Sign Renewal Works renewal for Parkyn Hut.
a | |
Total
Monagement
Management
Safety Improvements Increases scope changes required to deliver the project.
Tewantin, Hilton Terrace & Ernest 765,210 700,000 1,465,210 Timing - Bring Additional costs brought forward associated with
Street Intersection Forward to relocation of services.
2018/19
Design Program program.
i ll co
Management Total
fej it-yan a ec}
AssetManagement
io a lle
Handling Unit replacement ears.
Program to 2019/20 of tender and works commencement.
Mobility Rollout & Hardware to 2019/20 of T1 systems implementation program.
Asset Management Total = 355,000 - 205,000, 150,000
Fleet-PlantReplacement
and plant requirements
Fleet -Plant Replacement Total 2,040,241 - 200,000, 1,840,240 00
Page 40 of 63See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.