Unit Development 30-32 Doonella Street, Tewantin T 1. INTRODUCTION Our client, Serina Pty Ltd wishes to redevelop the site at 30-32 Doonella Street, Tewantin into a multi dwelling unit complex. At a pre-lodgement meeting with Council a number of engineering issues were raised by Council staff. The purpose of this report is to address these issues and to provide guidance on the redesign of the concept plans to be lodged with Council in support of a Material Change of Use Application. The site covers two lots with a total area of 2359 m2 and is described as lot 32 on RP 893427 and lot 903 on T1631. 2. PROPOSED DEVELOPMENT It is proposed to construct a multi-level unit building with basement car park and access off Doonella Street. Council have indicated that the basement level must be free draining (i.e. a pump out system will not be allowed). Council records indicate there is a drainage pipe from the car park behind the site running through lot 32 on RP 893427 and this needs to be investigated. It is anticipated that stormwater detention and water quality treatment will be required as part of the development works and preliminary sizing of these features has been undertaken by our sub- consultant Aquaintel. 3. SERVICES INFRASTRUCTURE The subject site is currently connected to existing water and sewer infrastructure located in Doonella Street. These existing services are considered suitable for the proposed development. As the site is located on the high side of Doonella Street stormwater from the site currently drains to the existing kerb and channel and conveyed to existing drainage pits in the street. A site investigation has revealed that: The interlot drainage pipe shown on Council GIS system passing through the development site does not exist. The drainage pit in the car park behind the site drains towards Sidoni Street, not Doonella Street. There is a drainage pit in Doonella Street on the low side of the development site (not shown on Council’s GIS) which has an invert level of approximately 1000mm below the road pavement. Based on the contours on Council’s GIS J/N 13672 June 2015 Rev C Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix 4 - Engineering Report (00012423).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.