Skip to the record
The gold standard in government transparency.

Original source · versioned page text

MCU18.0166 - Response to Information Request

Attached to the e-mail MCU18/0166 - Response to Information Request.

of 75

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

F IGURE 5-3 S ITE LAYOUT PLAN




IRIS Visual Planning + Design   Page 13


[OCR of page images]
SITE LOCATION

+

iB
z
$
2
3

     
  

pe "yA ct LOT IO
as = RP|N664

   

 

   

(19.06ha)

 
   

ISTING DWELLING (TYP) <=

 

 

 

 

 

 

SITE CO-ORDINATES

MONOPOLE LOCATION

DATUM: MGA [GDA94) [ Zone: 56
LATITUDE
LONGITUDE
EASTING
NORTHING

 

 

 

-2631594°
152.83023°

483 056
7089 316

 

 

 

 

AEGEND

A= — Ar — EXISTING AERIAL ELECTRICAL ROUTE
— NE — WUE — PROPOSED NBN ELECTRICAL ROUTE
—--——--— PROPERTY BOUNDARY

FIGURE 5-3 SITE LAYOUT PLAN

IRIS Visual Planning + Design

 
     
   
   

 

~ LOT 2
Lot 71—-” SP192012
eri SP148684 | ‘ .
LOT 89

 
 
 

887963”

-MCHI219

mI OAS ppge7963
OVERALL SITE PLAN

SCALE 45000

    
     
 
  
 
 
  
 

EXISTING ENERGEX AERIAL POWER LINES TO BE
‘ : ‘UPGRADED (NOTE 2)

- “ EXISTING METER BOX TO BE UPGRADED FOR NBN METERING
EXISTING DWELLING

PROPOSED NBN SUBMAIN

EXISTING VEHICLES PROPOSED TO BE MOVED BY LANDOWNER
=— PROPOSED ACCESS TRACK

= PROPOSED NBN CONSTRUCTION AREA

PROPOSED NBN SITE

‘EXISTING CONTAINER PROPOSED TO BE

RELOCATED DURING CONSTRUCTION BY NBN

EXISTING ENERGEX-
POWER POLES.

‘NOTES:
Le
EXISTING

ed

1. THE NBN ELECTRICAL ROUTE SHOWN ON THE
DRAWINGS |S INDICATIVE ONLY. ELECTRICAL

zy CONTRACTOR TO DETERMINE EXACT ROUTE.
. ELECTRICAL CONTRACTOR TO LOCATE AND

= IDENTIFY EXISTING UG SERVICES PRIOR TO

‘COMMENCEMENT OF WORK.

OWNER CONSENT REQUIRED FOR UGRRADE. IF

i

CONSENT |S NOT OBTAINED, ENERGEX WILL
DETAIL INSTALL NEW AERIAL POWER LINES ON ROAD
PETAL RESERVE AT NBN'S COST. ENERGEX MAY
SCALE 1:2500

REQUIRE NBN TQ TO VEGETATION CLEARING.

Page 13
Log in to download the original file

MCU18.0166 - Response to Information Request.pdf · 15.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.