2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan

of 98

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                     3
 Methodology




2        Methodology
         Work on the CHAP commenced in April 2017, and has progressed over that time in stages, with
         input from community consultation and Council staff at critical points as technical studies were
         progressed.

         The methodology for each phase has closely followed the guidance provided within the MS & G
         which sets out minimum standards to be achieved by each Council. A separate technical report has
         been produced and approved by Council and LGAQ at the end of each phase.

2.1      Consultation
2.1.1    Risk Workshops, 2017
         Consultation both internally and externally has informed the development of the CHAP at various
         stages.

         An initial risk workshop was held in September 2017, and was attended by council officers from a
         wide variety of council departments as well as a number of key stakeholders which included:

         • Noosa Residents & Ratepayers Association

         • Noosa District Landcare

         • Noosa Chamber of Commerce

         • Unitywater

         • Tourism Noosa.

         Attendees were asked to rate the risk to a number of community and council assets, based on the
         hazard mapping and risk criteria. This workshop helped to develop assessment criteria and also gain
         a feeling for Council and community members tolerance for coastal hazards, as well as mitigation
         options.

2.1.2    Community Pop Ups and Questionnaires, 2017
         It was also determined following the September 2017 workshop that some broader community
         consultation was required to ensure that community asset values had been captured and their
         tolerance for different risks was understood. A questionnaire regarding these issues was developed
         and community responses and their tolerance for impacts/loss of service were incorporated into risk
         scoring (see consequence criteria in (Table 2-5). These were captured by staff at a number of ‘pop
         ups’ at coastal locations e.g. Sunshine Beach, Noosaville. The community were also able to view
         hazard maps.

2.1.3    Adaptation Workshop, 2018
         A Community Adaptation Options Workshop was held in December 2018 to inform the preparation
         of the risk management and adaptation planning process to better plan and manage coastal risks
         by:
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.