Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan

of 98

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                    2
Introduction




        The QCoast2100 Minimum Standards & Guidelines (MS&G) provide guidance to local government
        wishing to prepare a CHAP. The guidelines set minimum requirements that are to be included in a
        CHAP as well as providing information on leading practices to facilitate continuous improvement.
        The minimum standards set a benchmark for undertaking such studies in Queensland so that coastal
        hazard adaptation decision-making is approached in a consistent and systematic manner. The
        MS&G are structured to address the key phases of a CHAP which are illustrated in Figure 1-1.




                                        Figure 1-1   QCoast2100 Phases


        BMT have been engaged to complete Phases 2-7 of the QCoast2100 phases with their partners Ethos
        Urban (planners) and Aither (economists). Noosa Council are responsible for the completion of
        Phases 1 and 8, as well as leading inputs for Phase 4. This report provides a summary of the
        outcomes of Phases 2-7, for which BMT have responsibility.
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.