Log in to see the plans as drawn Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary 14
Methodology
The QCoast2100 Guidelines require Councils to develop criteria for ranking, or prioritising adaptation
options. For the Noosa CHAP, a Multi-criteria Analysis (MCA) process was applied to potential
adaptation mitigation options for locations where risks were assessed as High to Very High in the
Phase 5 risk assessment. Identified options were chosen from a long list of available coastal hazard
mitigation options, similar to the Coastal Hazard Adaptation Options: A Compendium for Queensland
Coastal Councils (Griffith University, 2012), as recommended in the MS & G Guidelines.
The MCA criteria and their weightings are shown in Table 2-8.
Table 2-8 MCA Assessment Criteria
Criteria Criteria Description Weighting
Order of magnitude monetary costs to build/implement an
Cost adaptation option (further detailed studies to confirm costs would 20%
be required), either by Council or private land owners
Whether an adaptation option will have adverse impacts on
Environmental
environmental values e.g. Matters of State Environmental 20%
Impact
Significance
Whether an adaptation option will have adverse impacts on other
Social Impact social values or is likely to have community support e.g. access, 15%
amenity, property values
Reversible/ Whether an option is able to be ‘reversed’ or adapted to cater for
10%
adaptable future needs
Whether an option is technically feasible (i.e. is effective in
mitigating the risk and is implementable)
Whether an option is able to be readily approved (i.e. is
Effectiveness 35%
consistent with current planning policy or legislative requirements)
Whether an option provides a long-term solution to the coastal
hazard risk, or is suitable for use as an interim option
A “traffic light” system was used to group the options for further consideration as follows:
• “GO”: an option is considered suitable with no other adverse impacts, and requires no further
development (i.e. studies, design etc). These could also be defined as “No Regrets” options.
• “SLOW”: an option may be suitable, but should be subject to further detailed assessment at
specific locations i.e. Cost Benefit Analysis.
• “STOP”: an option is not considered suitable at a location and may not be considered for further
detailed analysis.
The weighting applied was determined by Council officers; no sensitivity analysis was undertaken.
2.2.6 Phase 7: Socioeconomic Appraisal
A Cost-Benefit Analysis (CBA) was performed by Aither on two regions within the Noosa region; the
open coast and Noosaville. The aim of this socio-economic analysis was to assist council in
understanding the merit of different coastal hazard mitigation options, particularly those that have
significant ongoing implications in terms of economic or community impact (usually those options
identified as requiring further assessment in the previous Phase (i.e. “slow” options).
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.