Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                         13
 Methodology




                                           Table 2-6     Risk Categories

        LIKELIHOOD         CONSEQUENCE
                           Insignificant   Minor          Moderate          Major                Catastrophic
        Almost Certain     Low             Medium         High              Very High            Very High
        Likely             Low             Medium         High              High                 Very High
        Possible           Low             Medium         Medium            High                 Very High
        Unlikely           Low             Low            Medium            High                 Very High
        Rare               Low             Low            Low               Medium               High



                                       Table 2-7       Risk Tolerance Scale

        Risk Level                  Action Required                                Tolerance
        High/Very High              Immediate Action required to eliminate         Intolerable
                                    or plan to reduce the risk, or accept the
                                    risk.
        Medium                      Reduce the risk over time, or further          Tolerable
                                    investigate the risk.
        Low                         Accept the risk; manageable through            Acceptable
                                    existing processes or coastal hazard
                                    management actions.

2.2.5    Phase 6: Options Assessment
         There are numerous adaptation options that may be considered for mitigating risks from coastal
         hazards in the Noosa area. The adaptation option hierarchy adopted for the CHAP generally aligns
         with that adopted for the Noosa Environment Strategy (2019), which is shown in Figure 2-1.


                                                            Measures are implemented to ensure a 'no
                                                                 worsening' of risks as a result of
                       AVOID                                development, infrastructure works or other
                                                                           decisions.

                                                             Improve coastal hazard preparedness and
                   PREPARE                                   information sharing to enhance community
                                                                    safety, health and wellbeing.


                 ACCOMMODATE                                Mitigate risks to an acceptable level through
                                                                     careful design and location.



           PLANNED TRANSITION                                    Reposition built structures away from
                                                                    hazard areas where feasible.

          Figure 2-1    Hierarchy of preferred coastal management responses for areas vulnerable to
                               coastal hazards (Noosa Environment Strategy 2019)
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.