2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan

of 98

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Shire Council Coastal Hazard Adaptation Plan: Project Summary                                      16
Methodology




                               Figure 2-3    Conceptual Model for Noosaville CBA

2.2.6.1 Eastern Beaches
        A total of seven different mitigation options were explored:

        • Option 1 (Base case): no adaptation actions undertaken

        • Option 2: Dune revegetation and management

        • Option 3: Dune revegetation, augmentation and management

        • Option 4: Construction of seawalls in high risk locations

        • Option 5: Acquisition of properties affected by coastal erosion in 2070, and conversion of affected
          properties to public open spaces

        • Option 6: Option 5 with a 15-year leaseback of properties prior to conversion to public open
           spaces

        • Option 7: Changes to planning regulations to prevent development seaward of the 2070 coastal
          erosion line.

        The socio-economic analysis investigated the effects of coastal erosion between 2020 and 2100.

2.2.6.2 Noosaville
        • The CBA for Noosaville investigated mitigation options for rising sea levels between 2020 and
          2100. Two options were explored: Option 1: Protect - Levees and stormwater infrastructure
           modifications (i.e. installing tide gates to prevent egress into the stormwater network)

        • Option 2: Accommodate - Road raising.
Log in to download the original file

2021-01-18 GC - Item 3 - Attachment 2 - Phase 7 Project Summary Coastal Hazards Adaptation Plan(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗