RFI - Attachment 5 - Unitywater CAR Response
Head Office:
Ground Floor, 33 King Street
Caboolture QLD 4510
Mailing Address:
PO Box 953, Caboolture QLD 4510
1300 0 UNITY (1300 086 489)
www.unitywater.com
ABN: 89 791 717 472
Our file ref: 812304343
Devcon Capital 9 Pty. Ltd.
C/- Covey Associates
PO Box 16
Maroochydore QLD 4558
3 February 2021
Dear Mr Gaffney,
Concurrence Agency Referral Response – proposed building work to be undertaken near
service provider infrastructure
Property Address: 11 Leo Alley Rd. Noosaville
Real Property Description: Lot 252 on SP104257
Proposed Building Work: Industrial or Commercial Building
Relevant Infrastructure: 150mm Vitreous Clay Sewage Gravity Main
Thank you for referring the proposed building work to be undertaken on the property as mentioned
above to Unitywater for a concurrence agency assessment. The assessment of the drawings and
documents submitted have been conducted by Unitywater’s Development Officer, Tony Stokman.
This concurrence agency referral response is issued under the provisions of the Planning Act 2016
and as such shall be a component of the building development approval that is to be obtained and
issued for the proposed building work.
The proposed building work is to be undertaken in accordance with the conditions as listed below.
CONDITIONS
1. The owner accepts sole responsibility for and releases Unitywater, its employees, authorised
agents and contractors in respect of all illness, injury, death and loss or damage of property which
may be sustained by Unitywater’s infrastructure; as a result of the building work being undertaken
near that infrastructure.
2. The owner indemnifies and shall keep indemnified Unitywater against all actions, claims, suits,
demands, losses, damages, costs and expenses of any kind, arising out of or incidental to the
building work being undertaken near Unitywater’s infrastructure and any works carried out by
Unitywater except to the extent caused by the negligence of Unitywater, its employees, authorised
agents and contractors.
3. The owner accepts responsibility, including costs, for any associated rectification works to
Unitywater’s infrastructure that are required as a result of the proposed building works directly or
indirectly impacting on the Unitywater asset.
4. Where a footing system includes piles/piers to support the building work, they must not be impact
driven
Page 1 of 3
Revision No: 7 Revised Date: 04/09/2020 Next Review Date: 04/09/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 2 pages
Page 2
5. The building work is to be located and the footings/foundations to be constructed as detailed
within the approved drawings listed below, which are to be integral to the building development
approval issued by the building certifier for the work.
Approved Drawings
Drawing Number
Drawing Title Prepared by Date
(Revision/Issue)
3137-DA01
Site Plan Ground Level Blackburne Jackson 13.01.2021
Issue 08
C100 Issue D Bulk Earthworks Plan Covey Associates 27.01.2021
Sewer Bridging Detail
C110 Issue C Covey Associates 27.01.2021
(Annotated in Red)
NB – Approved Drawings are enclosed
6. Any variation to the approved drawings will require a further referral to Unitywater for
consideration prior to commencing the building work. Such amended proposals will be considered
on their individual merits and may or may not be considered favourably.
7. To ensure the design clearance is attained; the line of the infrastructure, including the sewer
sewerage property connection point, must be accurately located on the property prior to
commencing the building work. In the event the actual clearance is less than design clearance, a
further referral to Unitywater is required and the resultant response shall be acted upon
accordingly.
8. A CCTV Survey of the sewer main as shown on the enclosed GIS Map is to be performed by an
independent contractor and submitted within twenty (20) business days from the footing system
for the building work having been completed.
NOTE: To submit the relevant CCTV video file/s and report documentation to Unitywater, send
an email request to [email protected] to arrange an Objective Connect link
to be provided to you for upload of the CCTV footage and CCTV written report
• The results (Video and Technical Report) must include the asset I.D numbers as shown on
the GIS Map and is to be submitted to Unitywater for assessment within ten (10) business
days of the CCTV Survey having been completed.
• The survey must be conducted utilising a tracked vehicle with a rotating camera head and
the lens is to be free of water and obstructive material.
• The Technical Report may be in hard copy and/or electronic format and must identify the
location and characteristics of reportable features (i.e. sewer main defects) and other
essential details necessary to define the extent of the survey (i.e. the length of the main,
chainages of defects, sewer property connections, etc). An example of an acceptable
Technical Report is enclosed for your reference.
*IMPORTANT – A ‘Notice of Finalisation’ for this Concurrence Agency Referral Response will
be issued once the CCTV Survey has been received, reviewed and it is determined there has
been no impact to the sewer main resulting from the construction of the footing system.
Page 2 of 3
Revision No: 7 Revised Date: 04/09/2020 Next Review Date: 04/09/2022
Page 3
REASONS FOR CONDITIONS
The conditions as listed must attach to the building development approval so as to ensure there is
no damage caused to the building works and the infrastructure, there is sufficient ventilation for
individuals in close proximity to the infrastructure and adequate access for inspecting, maintaining
or replacing the infrastructure is provided.
ADVICE TO THE BUILDING CERTIFIER (ASSESSMENT MANAGER)
Before finalising the building development approval (i.e. issuing the Form 11, 17 or 21 as applicable);
please ensure compliance with Condition 8 as listed above has been achieved – ‘Notice of
Finalisation’ has been issued.
Should you require any further information regarding this response, please contact Unitywater at
[email protected] or alternatively telephone 1300 086489.
Yours sincerely
Mark Kettley
Team Leader Development Works
Development Services
ENC Approved Drawings
GIS Map
Example of Technical Report
Page 3 of 3