RFI - Attachment 5 - Unitywater CAR Response

of 3

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                          Head Office:
                                                                                          Ground Floor, 33 King Street
                                                                                                 Caboolture QLD 4510
                                                                                                     Mailing Address:
                                                                                     PO Box 953, Caboolture QLD 4510
                                                                                         1300 0 UNITY (1300 086 489)
                                                                                                www.unitywater.com
                                                                                                      ABN: 89 791 717 472


          Our file ref: 812304343



          Devcon Capital 9 Pty. Ltd.
          C/- Covey Associates
          PO Box 16
          Maroochydore QLD 4558


          3 February 2021


          Dear Mr Gaffney,


          Concurrence Agency Referral Response – proposed building work to be undertaken near
          service provider infrastructure

          Property Address: 11 Leo Alley Rd. Noosaville
          Real Property Description: Lot 252 on SP104257
          Proposed Building Work: Industrial or Commercial Building
          Relevant Infrastructure: 150mm Vitreous Clay Sewage Gravity Main

          Thank you for referring the proposed building work to be undertaken on the property as mentioned
          above to Unitywater for a concurrence agency assessment. The assessment of the drawings and
          documents submitted have been conducted by Unitywater’s Development Officer, Tony Stokman.
          This concurrence agency referral response is issued under the provisions of the Planning Act 2016
          and as such shall be a component of the building development approval that is to be obtained and
          issued for the proposed building work.
          The proposed building work is to be undertaken in accordance with the conditions as listed below.
          CONDITIONS
          1. The owner accepts sole responsibility for and releases Unitywater, its employees, authorised
             agents and contractors in respect of all illness, injury, death and loss or damage of property which
             may be sustained by Unitywater’s infrastructure; as a result of the building work being undertaken
             near that infrastructure.

          2. The owner indemnifies and shall keep indemnified Unitywater against all actions, claims, suits,
             demands, losses, damages, costs and expenses of any kind, arising out of or incidental to the
             building work being undertaken near Unitywater’s infrastructure and any works carried out by
             Unitywater except to the extent caused by the negligence of Unitywater, its employees, authorised
             agents and contractors.

          3. The owner accepts responsibility, including costs, for any associated rectification works to
             Unitywater’s infrastructure that are required as a result of the proposed building works directly or
             indirectly impacting on the Unitywater asset.

          4. Where a footing system includes piles/piers to support the building work, they must not be impact
             driven

                                                                                                               Page 1 of 3




Revision No: 7                              Revised Date: 04/09/2020                         Next Review Date: 04/09/2022
Log in to download the original file

RFI - Attachment 5 - Unitywater CAR Response.pdf · 436 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

           5. The building work is to be located and the footings/foundations to be constructed as detailed
              within the approved drawings listed below, which are to be integral to the building development
              approval issued by the building certifier for the work.

                                                       Approved Drawings

             Drawing Number
                                            Drawing Title                    Prepared by                     Date
             (Revision/Issue)
                 3137-DA01
                                       Site Plan Ground Level            Blackburne Jackson              13.01.2021
                  Issue 08

                 C100 Issue D           Bulk Earthworks Plan               Covey Associates              27.01.2021

                                 Sewer Bridging Detail
                 C110 Issue C                                              Covey Associates              27.01.2021
                                  (Annotated in Red)
           NB – Approved Drawings are enclosed

           6. Any variation to the approved drawings will require a further referral to Unitywater for
              consideration prior to commencing the building work. Such amended proposals will be considered
              on their individual merits and may or may not be considered favourably.

           7. To ensure the design clearance is attained; the line of the infrastructure, including the sewer
              sewerage property connection point, must be accurately located on the property prior to
              commencing the building work. In the event the actual clearance is less than design clearance, a
              further referral to Unitywater is required and the resultant response shall be acted upon
              accordingly.

           8. A CCTV Survey of the sewer main as shown on the enclosed GIS Map is to be performed by an
              independent contractor and submitted within twenty (20) business days from the footing system
              for the building work having been completed.

                 NOTE: To submit the relevant CCTV video file/s and report documentation to Unitywater, send
                 an email request to [email protected] to arrange an Objective Connect link
                 to be provided to you for upload of the CCTV footage and CCTV written report

                 •   The results (Video and Technical Report) must include the asset I.D numbers as shown on
                     the GIS Map and is to be submitted to Unitywater for assessment within ten (10) business
                     days of the CCTV Survey having been completed.

                 •   The survey must be conducted utilising a tracked vehicle with a rotating camera head and
                     the lens is to be free of water and obstructive material.

                 •   The Technical Report may be in hard copy and/or electronic format and must identify the
                     location and characteristics of reportable features (i.e. sewer main defects) and other
                     essential details necessary to define the extent of the survey (i.e. the length of the main,
                     chainages of defects, sewer property connections, etc). An example of an acceptable
                     Technical Report is enclosed for your reference.

           *IMPORTANT – A ‘Notice of Finalisation’ for this Concurrence Agency Referral Response will
           be issued once the CCTV Survey has been received, reviewed and it is determined there has
           been no impact to the sewer main resulting from the construction of the footing system.
                                                                                                               Page 2 of 3




Revision No: 7                                Revised Date: 04/09/2020                        Next Review Date: 04/09/2022

Page 3

           REASONS FOR CONDITIONS

           The conditions as listed must attach to the building development approval so as to ensure there is
           no damage caused to the building works and the infrastructure, there is sufficient ventilation for
           individuals in close proximity to the infrastructure and adequate access for inspecting, maintaining
           or replacing the infrastructure is provided.

           ADVICE TO THE BUILDING CERTIFIER (ASSESSMENT MANAGER)

           Before finalising the building development approval (i.e. issuing the Form 11, 17 or 21 as applicable);
           please ensure compliance with Condition 8 as listed above has been achieved – ‘Notice of
           Finalisation’ has been issued.

           Should you require any further information regarding this response, please contact Unitywater at
           [email protected] or alternatively telephone 1300 086489.


           Yours sincerely




           Mark Kettley
           Team Leader Development Works
           Development Services

           ENC        Approved Drawings
                      GIS Map
                      Example of Technical Report




                                                                                                              Page 3 of 3




Revision No: 7                                 Revised Date: 04/09/2020                      Next Review Date: 04/09/2022

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.