Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

RFI - Attachment 5 - Unitywater CAR Response

of 3

Page text shows just the words. Original shows the document exactly as it was published.

           5. The building work is to be located and the footings/foundations to be constructed as detailed
              within the approved drawings listed below, which are to be integral to the building development
              approval issued by the building certifier for the work.

                                                       Approved Drawings

             Drawing Number
                                            Drawing Title                    Prepared by                     Date
             (Revision/Issue)
                 3137-DA01
                                       Site Plan Ground Level            Blackburne Jackson              13.01.2021
                  Issue 08

                 C100 Issue D           Bulk Earthworks Plan               Covey Associates              27.01.2021

                                 Sewer Bridging Detail
                 C110 Issue C                                              Covey Associates              27.01.2021
                                  (Annotated in Red)
           NB – Approved Drawings are enclosed

           6. Any variation to the approved drawings will require a further referral to Unitywater for
              consideration prior to commencing the building work. Such amended proposals will be considered
              on their individual merits and may or may not be considered favourably.

           7. To ensure the design clearance is attained; the line of the infrastructure, including the sewer
              sewerage property connection point, must be accurately located on the property prior to
              commencing the building work. In the event the actual clearance is less than design clearance, a
              further referral to Unitywater is required and the resultant response shall be acted upon
              accordingly.

           8. A CCTV Survey of the sewer main as shown on the enclosed GIS Map is to be performed by an
              independent contractor and submitted within twenty (20) business days from the footing system
              for the building work having been completed.

                 NOTE: To submit the relevant CCTV video file/s and report documentation to Unitywater, send
                 an email request to [email protected] to arrange an Objective Connect link
                 to be provided to you for upload of the CCTV footage and CCTV written report

                 •   The results (Video and Technical Report) must include the asset I.D numbers as shown on
                     the GIS Map and is to be submitted to Unitywater for assessment within ten (10) business
                     days of the CCTV Survey having been completed.

                 •   The survey must be conducted utilising a tracked vehicle with a rotating camera head and
                     the lens is to be free of water and obstructive material.

                 •   The Technical Report may be in hard copy and/or electronic format and must identify the
                     location and characteristics of reportable features (i.e. sewer main defects) and other
                     essential details necessary to define the extent of the survey (i.e. the length of the main,
                     chainages of defects, sewer property connections, etc). An example of an acceptable
                     Technical Report is enclosed for your reference.

           *IMPORTANT – A ‘Notice of Finalisation’ for this Concurrence Agency Referral Response will
           be issued once the CCTV Survey has been received, reviewed and it is determined there has
           been no impact to the sewer main resulting from the construction of the footing system.
                                                                                                               Page 2 of 3




Revision No: 7                                Revised Date: 04/09/2020                        Next Review Date: 04/09/2022
Log in to download the original file

RFI - Attachment 5 - Unitywater CAR Response.pdf · 436 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.