SUPERSEDED 2311-37569 SRA - Response with conditions · MCU23/0129
2311-37569 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the documents referenced below are found at Attachment 5)
No. Conditions Condition timing
Development Permit for operational work
Schedule 10, Part 17, Division 3, Table 1, Item 1 – Tidal works or work within a coastal management
district —The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Environment and Science to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
1. The development must be carried out generally in accordance with For the duration of
the following plans: works and to be
‘Site plan & water allocation plan’, prepared by The Jetty maintained
Specialist, dated 17/07/2023, drawing number TJS-04801-01,
version E
‘Proposed jetty’, prepared by The Jetty Specialist, dated
17/07/2023, drawing number TJS-04801-02, version E
‘Elevation’, prepared by The Jetty Specialist, dated
17/07/2023, drawing number TJS-04801-03, version D
2. The works to which this approval relates are to be for a private At all times
purpose only.
3. Any operator and contractor involved in the works to which this During construction
approval relates must:
(a) be provided a copy of referral agency conditions
(b) install all measures, plant and equipment necessary to
ensure compliance with the conditions of this approval
(c) maintain such measures, plant and equipment in a proper
and efficient condition
(d) operate such measures, plant and equipment in a proper
and efficient manner
4. For the proposed works only use material which are free from During construction
contaminants as defined under section 11 of the Environmental
Protection Act 1994.
5. Should the works become damaged as a result of erosion, flooding At all times
or storm tide inundation, the registered landowner(s) of the subject
land shall be responsible for the removal of all debris at their own
expense.
Schedule 10, Part 17, Division 3, Table 2, Item 1 – Tidal works or work within a coastal management
district —The chief executive administering the Planning Act 2016 nominates the Director-General of
the Department of Transport and Main Roads to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
6. The development must be carried out generally in accordance with At all times
the following plans:
‘Site plan & water allocation plan’, prepared by The Jetty
Specialist, dated 17/07/2023, drawing number TJS-04801-
01, version E
State Assessment and Referral Agency Page 3 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED 2311-37569 SRA - Response with conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 278 KB (small file)
- File type
No other editions are linked here.