7. (a) Light/mark all vessels, structure, plant and equipment associated For the duration of
with the works, in accordance with Section 3 of AS4282-1997 works and for operation
Control of the obtrusive effects of outdoor lighting. to be maintained at all
times
Lighting provided must not obscure, disguise or otherwise interfere
with the safe navigation of other vessels, including the effectiveness
of navigational lighting.
8. The construction, operation and maintenance of the pontoon. And For the duration of
any ship berthed, moored or attached to the structure, must not: works, and at all times
(a) encroach into, pass over or under a navigation corridor or
(b) be located in a high risk maritime zone; or
impede the safe navigation of other ships or boats; or restrict safe
access to or from neighbouring structures
9. Remove and dispose of any debris or similar obstruction For the duration of
encountered whilst undertaking the work at an appropriately licensed works
facility.
10. All piles and/or structure to be demolished, both above and below Prior to the completion
the waterline must be completely extracted/removed. of the works
State Assessment and Referral Agency Page 4 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED 2311-37569 SRA - Response with conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 278 KB (small file)
- File type
No other editions are linked here.