Original source · versioned page text
Delegated Report - Code - Planning OPW26 0024 (As Published)
*(Refer to Advisory Note)
37. Vegetation removal or pruning must be undertaken in a manner that avoids damaging
surrounding vegetation and habitat.
38. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice.
*(Refer to Advisory Note)
Landscaping works
39. Turfed areas must be free of pest, diseases and weeds and level with adjoining surfaces.
Damage to Services and Assets
40. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
FOLLOWING CONSTRUCTION
Easements
41. An easement for drainage purposes must be registered in favour of Council against the title
of Lot 3 SP322201 nominally which convey stormwater from the upstream catchment. The
easement must be a sufficient width to contain all underground stormwater infrastructure and
allow for maintenance. The easement must be granted prior to the commencement of use.
Certification
42. Upon completion of the work a certificate must be issued by an RPEQ certifying that the
works have been constructed in accordance with the Operational Works permit.
43. Prior to commencement of use the following (prepared by respective qualified persons* and
certifying compliance with approvals) must be submitted to Council:
a. Landscaping certification confirming all works have been constructed in accordance
with conditions of approval.
b. NATSPEC certification (Specifying Trees: a guide to assessment of tree quality
addressing each specimen).
44. Prior to commencement of use the following must be submitted to Council (to be
prepared/undertaken by a suitably qualified person*):
a. Undertake a tree risk assessment of all trees within falling or striking distance of the
development to the north-east of the lot within Lot 3SP322201 and provide
recommendations;
b. carry out hazard removal and pruning, in accordance with the recommendations of the
tree risk assessment and the relevant standards outlined in AS4970 Protection of trees
on development sites and AS4373, Pruning of amenity trees.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
23BRW0003 5 Operational Waste Management Plan, prepared by 24/04/2026
Colliers
Page 10 of 12
Document Set ID: 24726708
Version: 7, Version Date: 21/05/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Delegated Report - Code - Planning OPW26 0024 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.