Delegated Report - Code - Planning OPW26 0024 (As Published)

of 12
               3.     CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.     ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                         Plan No.      Rev.   Plan/Document Name                                      Date

                         CN.0.01       C      Cover Sheet, prepared by MPN Consulting                 30/01/26

                         BE.1.01       L      Bulk Earthworks Plan, prepared by MPN Consulting        13/04/26

                         BE.1.01       L      Bulk Earthworks Plan, prepared by MPN Consulting        13/04/26

                         BE.2.01       D      Bulk Earthworks Sections and Details, prepared by 13/04/26
                                              MPN Consulting

                         CP.1.01       K      Civil Works Plan, prepared by MPN Consulting            13/04/26
                                              Annotated by Council

                         CP.2.01       B      Civil Works Details, prepared by MPN Consulting         30/01/26

                         CP.2.02       B      Civil Works Details Sheet 2, prepared by MPN 30/01/26
                                              Consulting

                         PV.1.01       C      Pavement Types Plan, prepared by MPN Consulting         13/04/26

                         LM.1.01       B      Signs and Linemarking Plan, prepared by MPN 13/04/26
                                              Consulting

                         SW.2.01       C      Stormwater Treatment Details – Sheet 1, prepared by 13/04/26
                                              MPN Consulting

                         SW.2.02       B      Stormwater Treatment Details – Sheet 2, prepared by 13/04/26
                                              MPN Consulting

                         SW.3.01       C      Stormwater Longitudinal Sections     –    Sheet   1, 13/04/26
                                              prepared by MPN Consulting

                         SW.3.02       C      Stormwater Longitudinal Sections     –    Sheet   2, 13/04/26
                                              prepared by MPN Consulting

                         SW.4.01       A      Stormwater Drainage Catchment Plan, prepared by 13/04/26
                                              MPN Consulting

                         SW.5.01       B      Stormwater Drainage Calculations – Minor Sheet 1, 13/04/26
                                              prepared by MPN Consulting

                         SW.5.02       B      Stormwater Drainage Calculations – Minor Sheet 2, 13/04/26
                                              prepared by MPN Consulting



                                                                                                      Page 5 of 12

Document Set ID: 24726708
Version: 7, Version Date: 21/05/2026

Log in to download the original (Delegated Report - Code - Planning OPW26 0024 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.