Delegated Report - Code - Planning OPW26 0024 (As Published)
LP0.01 A Landscape plan – key plan; legend & notes, prepared 13/02/2026
by Jeremy Ferrier Landscape Architect
LP1.01 A Landscape plan – grading & finishes, prepared by 13/02/2026
Jeremy Ferrier Landscape Architect
LP1.02 A Landscape plan – grading & finishes, prepared by 13/02/2026
Jeremy Ferrier Landscape Architect
LP3.01 A Landscape plan – Planting plan, prepared by Jeremy 13/02/2026
Ferrier Landscape Architect
LP3.02 A Landscape plan – Planting plan, prepared by Jeremy 13/02/2026
Ferrier Landscape Architect
LP4.01 A Landscape plan – Landscape details, prepared by 13/02/2026
Jeremy Ferrier Landscape Architect
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 20 May 2028 unless an application to extend the currency period is
approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
3. All necessary approvals from external service providers (e.g., Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
4. Copies of the approved plans, duly signed by the consultant Registered Professional
Engineer of Queensland (RPEQ) must be provided to Council’s Engineering Officer
Construction at the “pre start” meeting.
5. A condition report of the drainage system must be completed for agreement at the prestart
meeting. The condition report is to include a CCTV inspection of the existing pipe and must
include at least 50m upstream and downstream of all works.
6. A condition report including photographs of the frontage of the site must be completed and
submitted to council at the prestart meeting / prior to any works commencing.
7. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
8. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Landscape works;
c. Erosion and sediment control works;
d. Other relevant parties
9. A Construction Management Plan must be submitted prior to the pre-start meeting and must
address the following:
a. Traffic management during all phases of construction;
b. Adequate parking arrangements for works and deliveries;
Page 6 of 12
Document Set ID: 24726708
Version: 7, Version Date: 21/05/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Delegated Report - Code - Planning OPW26 0024 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.