8. Volume 5 - Stormwater Management Plan

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                               DATE

                                                                             CONTACT

                                                               REFERENCE
                                                                                               14 JULY 2016



                                                               B16239CR002
                                                                             ANDREW PEZZUTTI




Stormwater Management Plan
Noosa Energy Centre – 140-142 Eumundi Noosa Road, Noosaville
For Denmac Nominees Pty Ltd
Log in to download the original file

8. Volume 5 - Stormwater Management Plan.pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 82 pages

Page 2

                                 LAMBERT & REHBEIN
                                    ENGINEERS • MANAGERS • SCIENTISTS


TABLE OF CONTENTS

1.0     INTRODUCTION                                                            1

2.0     SITE DESCRIPTION                                                        2

3.0     STORMWATER QUANTITY                                                     3

3.1     METHODOLOGY                                                              3

3.2     STORM EVENTS                                                             3

3.3     PRE DEVELOPMENT SCENARIO                                                 4

3.4     POST DEVELOPMENT SCENARIO                                                5

3.5     DETENTION REQUIREMENTS                                                   8

4.0     STORMWATER QUALITY                                                     10

4.1     STORMWATER QUALITY OBJECTIVES                                          10

4.2     POTENTIAL WATER QUALITY IMPACTS                                        10

4.3     STORMWATER QUALITY ASSESSMENT                                          11

4.4     SELECTION OF STORMWATER TREATMENT TRAIN                                15

4.5     STORMWATER QUALITY MODELLING RESULTS                                   16

5.0     MAINTENANCE                                                            17

5.1     STORMWATER360 ENVIROPODS AND MECHANICAL FILTRATION SYSTEM              17

6.0     CONCLUSIONS AND RECOMMENDATIONS                                        18




 Ref: B16239CR002                   - i -                  Stormwater Management Plan
                                                        Noosa Energy Centre - Noosaville

Page 3

                                LAMBERT & REHBEIN
                                  ENGINEERS • MANAGERS • SCIENTISTS




APPENDIX A

PLAN SHOWING DETAILS OF LOT 2 ON RP173876

APPENDIX B

MASTER PLAN DA01

SITE LOCATION PLAN DA02

ELEVATIONS 01 DA03

ELEVATIONS 02 DA04

APPENDIX C

PRELIMINARY EARTHWORKS LAYOUT PLAN B16239-CSK01

PRELIMINARY SERVICES LAYOUT PLAN B16239-CSK02

DETAILS SHEET B16239-CSK03

APPENDIX D

XPSTORM HYDROGRAPHS

APPENDIX E

RATIONAL METHOD CALCULATIONS

APPENDIX F

MUSIC MODELLING RESULTS

APPENDIX G

STORMFILTER & ENVIROPOD OPERATION & MAINTENANCE MANUAL

APPENDIX H

EROSION AND SEDIMENT CONTROL CODE


Ref: B16239CR002                   - ii -                   Stormwater Management Plan
                                                         Noosa Energy Centre - Noosaville

Page 4

LAMBERT & REHBEIN

ENGINEERS , MANAGERS . SCIENTISTS

 

 

 

Document Control Page
Revision | Date Description Author | Signature | Verifier | Signature | Approver | Signature
A 08/07/2016 DRAFT KH AP AP

 

B | 14/07'2016) DASUBMISSION | KH A[/ fA | ap | | AP |e

 

 

 

 

 

 

 

 

 

 

 

 

 

Ref: B16239CR002 - iii - Stormwater Management Plan
Noosa Energy Centre - Noosaville

 

 

Page 5

                                          LAMBERT & REHBEIN
                                              ENGINEERS • MANAGERS • SCIENTISTS



1.0     INTRODUCTION

Lambert & Rehbein (SEQ) Pty Ltd has been commissioned by Denmac Nominees Pty Ltd to
develop a conceptual Stormwater Management Plan for the proposed Noosa Energy Centre at
140-142 Eumundi Noosa Road, Noosaville. The site is located within the Noosa Council Local
Government Area.

The proposed service station with associated shop and food outlet is illustrated on the preliminary
architectural plans DA01 to DA04 reference 16.0122.17, prepared by Thomson Adsett, enclosed
in Appendix B.

The aim of this conceptual stormwater management plan is to identify any stormwater detention
requirements and an appropriate level of stormwater quality improvement.

This report has been compiled to address the stormwater quality and quantity requirements of
Noosa Council, the Queensland Urban Drainage Manual (QUDM), the Environmental Protection
Act 1994 and the associated Environmental Protection (Water) Policy, 2009.

The Noosa Plan Erosion and Sediment Control Code has been prepared and is included in
Appendix H.




 Ref: B16239CR002                            - 1 -                          Stormwater Management Plan
                                                                         Noosa Energy Centre - Noosaville

Page 6

                                        LAMBERT & REHBEIN
                                           ENGINEERS • MANAGERS • SCIENTISTS



2.0     SITE DESCRIPTION

The subject site is situated at 140-142 Eumundi Noosa Road, Noosaville on land described as
Lot 2 on RP173876. The site is bound by Eumundi Noosa Road to the south east, Project Avenue
to the north west and commercial properties to the remaining boundaries. The site is
approximately 2,428 m2 in area.




                    SUBJECT SITE




                                                                       Source: Google Maps 2016

The site is currently occupied by a commercial premise with associated carpark at the Eumundi
Noosa Road frontage. The rear of the site is used as a carpark area and there is an access
driveway to the site from Project Avenue.

An existing site survey indicates that the site ranges in elevation from approximately RL10.8m
AHD at the Eumundi Noosa Road frontage to RL4.67m AHD in the northern rear corner of the
site at the Project Avenue frontage. Refer to Plan Showing Details of Lot 2 on RP173876
Reference 16-4187AA prepared by Max Watterson & Associates Contour enclosed in Appendix
A of this report.


 Ref: B16239CR002                          - 2 -                         Stormwater Management Plan
                                                                      Noosa Energy Centre - Noosaville

Page 7

                                         LAMBERT & REHBEIN
                                             ENGINEERS • MANAGERS • SCIENTISTS



3.0     STORMWATER QUANTITY

3.1     METHODOLOGY
In order to determine the stormwater flows for the site an XPStorm model of the catchments was
developed. The development layout utilised in the modelling is as shown on the preliminary
architectural plans prepared by Thomson Adsett enclosed in Appendix B. A breakdown of the
existing and proposed catchments is presented in Table 1 below.
                            Table 1 Development Catchment Area
                    PRE DEVELOPMENT                       POST DEVELOPMENT
                                               CATCHMENT A                  CATCHMENT B
IMPERVIOUS               990 m2                     2086 m2                       140 m2
PERVIOUS                1438 m2                     102 m2                        100 m2
    TOTAL               2428 m2                     2188 m2                       240 m2


The impervious area of the site will increase due to the increased roof and pavement areas
compared with the existing pre development surfaces. As such there is likely to be an increase in
stormwater runoff from the developed site. Noosa Council requires that existing levels of
stormwater discharge are maintained from the proposed development site. The stormwater
detention, if required will be designed to attenuate peak flows for all design storms up to and
including a Q100 storm.

3.2     STORM EVENTS
Q1, Q2, Q5, Q10, Q20, Q50 and Q100 were modelled for the following durations:

•       STORM 1 - 10 minutes;                       •         STORM 5 – 60 minutes;
•       STORM 2 - 15 minutes;                       •         STORM 6 – 90 minutes; and
•       STORM 3 - 30 minutes                        •         STORM 7 – 120 minutes.
•       STORM 4 – 45 minutes;
The above storms can be related to the output hydrographs presented in Appendices D & E.




 Ref: B16239CR002                           - 3 -                          Stormwater Management Plan
                                                                        Noosa Energy Centre - Noosaville

Page 8

                                            LAMBERT & REHBEIN
                                              ENGINEERS • MANAGERS • SCIENTISTS


3.3     PRE DEVELOPMENT SCENARIO
Table 2 below outlines the calculations, methodology and inputs used to undertake the pre
development hydrologic modelling in XPStorm.
                           Table 2 Pre Development XPStorm Inputs
                    Item                       Value        Units      Source / Comment

IFD Chart                                      Noosa         N/A     Bureau of Meteorology

IFD Coefficients                               Noosa         N/A     Bureau of Meteorology

Zone                                              3          N/A    AR&R, Volume 1, Book 2

Impervious Initial Loss / Continuing Loss *    2.5 / 0       mm     AR&R, Volume 1, Book 5

Pervious Initial Loss / Continuing Loss *      20 / 2.5      mm     AR&R, Volume 1, Book 5

Impervious Catchment Mannings                   0.015        N/A       Roof and Pavement

Pervious Catchment Mannings                     0.035        N/A             Grass

Impervious Catchment Area                      0.0990         ha    Contour and Detail Survey

Pervious Catchment Area                        0.1438         ha    Contour and Detail Survey

Vectored Slope Impervious                        0.5          %           Survey Plans

Vectored Slope Pervious                           7           %           Survey Plans

* The Initial and Continuing Loss models are within the specified Australian Rainfall and Runoff
(AR&R) ranges and have been calibrated to the results obtained from rational method
calculations.

To check the order of accuracy of the XPStorm model, rational method calculations were
completed for each storm event. The peak event was assumed to be equal to the time of
concentration for the catchment.

Table 3 overleaf shows the results of the hydrological modelling and the rational method
calculations. For further details, the XPStorm outputs are enclosed in Appendix D and the
rational method calculations are enclosed in Appendix E.




 Ref: B16239CR002                                         - 4 -                    Stormwater Management Plan
                                                                                Noosa Energy Centre - Noosaville

Page 9

                                             LAMBERT & REHBEIN
                                              ENGINEERS • MANAGERS • SCIENTISTS


                           Table 3 Pre Development Peak Flow Rates
  ARI (Years)       Rational Method (m3/s)   XPStorm (m3/s)      Difference (m3/s)    Difference (%)

      Q1                    0.051                0.047               - 0.004                - 8%

      Q2                    0.069                0.079               + 0.010               + 15%

      Q5                    0.095                0.112               + 0.017               + 18%

      Q10                   0.111                0.128               + 0.017               + 16%

      Q20                   0.132                0.150               + 0.018               + 14%

      Q50                   0.167                0.162               - 0.005                - 3%

      Q100                  0.191                0.180               - 0.011                - 6%


The order of magnitude of the XPStorm Model results correlate reasonably well for all intensity
events when compared with the rational method calculations. As such, the XPStorm Model is
considered to be satisfactory for this investigation.

3.4     POST DEVELOPMENT SCENARIO
Table 4 overleaf outlines the calculations, methodology and inputs used to undertake the post
development hydrologic modelling in XPStorm.




 Ref: B16239CR002                                        - 5 -                          Stormwater Management Plan
                                                                                     Noosa Energy Centre - Noosaville

Page 10

                                           LAMBERT & REHBEIN
                                             ENGINEERS • MANAGERS • SCIENTISTS


                           Table 4 Post Development XPStorm Inputs
                    Item                    Value      Units          Source / Comment

 IFD Chart                                  Noosa       N/A         Bureau of Meteorology

 IFD Coefficients                           Noosa       N/A         Bureau of Meteorology

 Zone                                         3         N/A        AR&R, Volume 1, Book 2

 Impervious Initial Loss / Continuing        1/0        mm         AR&R, Volume 1, Book 5
 Loss *

 Pervious Initial Loss / Continuing Loss    10 / 1      mm         AR&R, Volume 1, Book 5
 *

 Impervious Catchment Mannings              0.013       N/A          Roof and Pavement

 Pervious Catchment Mannings                 0.03       N/A           Landscaping/Grass

 Total Impervious Catchment Area           0.2227       ha             Site Layout Plan

 Total Pervious Catchment Area             0.0201       ha             Site Layout Plan

 Impervious Vectored Slope                   1.0        %              Site Layout Plan

 Pervious Vectored Slope                     1.0        %              Site Layout Plan

* The Initial and Continuing Loss models are within the specified AR&R ranges and have been
calibrated to the results obtained from rational method calculations.

The post development XPStorm model was calibrated using the rational method. Table 5 overleaf
shows the results of the hydrological modelling and the rational method calculations. For further
details, the XPStorm outputs are enclosed in Appendix D and the rational method calculations
are enclosed in Appendix E.




 Ref: B16239CR002                                       - 6 -                      Stormwater Management Plan
                                                                                Noosa Energy Centre - Noosaville

Page 11

                                             LAMBERT & REHBEIN
                                               ENGINEERS • MANAGERS • SCIENTISTS


                           Table 5 Post Development Peak Flow Rates
  ARI (Years)       Rational Method (m3/s)   XPStorm (m3/s)      Difference (m3/s)     Difference (%)

      Q1                    0.061                0.080               + 0.019                + 31%

      Q2                    0.083                0.103               + 0.020                + 24%

      Q5                    0.114                0.129               + 0.015                + 13%

      Q10                   0.132                0.143               + 0.011                + 8%

      Q20                   0.158                0.164               + 0.006                + 4%

      Q50                   0.196                0.178               - 0.018                 - 9%

     Q100                   0.216                0.199               - 0.017                 - 8%


The order of magnitude of the XPStorm Model results correlate reasonably well for all intensity
events when compared with the rational method calculations.

Table 6 below compares the XPStorm model results of the pre development peak flows and the
post development unmitigated peak flows.
                         Table 6 XPStorm Peak Flow Rates Comparison
                    XPStorm Post Development        XPStorm Pre            Increase         Increase
  ARI (Years)
                        Unmitigated (m3/s)       Development (m3/s)          (m3/s)            (%)

      Q1                      0.080                      0.047             + 0.033           + 70%

      Q2                      0.103                      0.079             + 0.024           + 30%

      Q5                      0.129                      0.112             + 0.017           + 15%

      Q10                     0.143                      0.128             + 0.015           + 12%

      Q20                     0.164                      0.150             + 0.014            + 9%

      Q50                     0.178                      0.162             + 0.016           + 10%

     Q100                     0.199                      0.180             + 0.019           + 11%




 Ref: B16239CR002                                        - 7 -                           Stormwater Management Plan
                                                                                      Noosa Energy Centre - Noosaville

Page 12

                                              LAMBERT & REHBEIN
                                                  ENGINEERS • MANAGERS • SCIENTISTS


3.5     DETENTION REQUIREMENTS
From the hydrological modelling it is evident that the development would cause an increase in the
peak stormwater flows. Therefore stormwater detention will be required to avoid adverse impacts
on downstream properties.

The stormwater detention system will attenuate all peak flows up to, and including, a Q100 storm.
Refer XPStorm outputs included in Appendix D for further details.

3.5.1   ABOVE GROUND DETENTION TANKS

The on-site detention will be provided by a detention tank located under the service station shop.
It is proposed to direct all flows from Catchment A, up to a Q100 event, to the proposed detention
tank.

Due to site levels, Catchment B bypasses the detention tank, however the tank has been
modelled to ensure the total flows leaving the site are less than pre-developed conditions.

The proposed lawful point of discharge for the stormwater is the existing gully pits located in
Project Avenue. The details for the proposed stormwater management and detention tank are
shown on the civil engineering plans enclosed in Appendix C.

The proposed details for the detention tank is shown in Table 7 below.
                           Table 7 Above Ground Detention Tanks Details


                     Q100 Max Depth (m)                                  1.65

                     Q100 Storage Volume (m3)                            34

                     Orifice 1 Diameter(mm)/Invert Level (m) *       130Ø / 0.0

                     Orifice 2 Diameter(mm)/Invert Level (m) *       150Ø / 0.65

                     Orifice 3 Diameter(mm)/Invert Level (m) *       200Ø / 0.8

                     High Level Weir Length (m) / Invert Level (m)    1.6 / 1.2

                    *Invert level from base of tank.

With the addition of the above detention parameters to the developed site, the attenuated peak
flows are less than the pre developed conditions. The attenuated peak outflows and percentage
increase/decrease to that of the pre development flows, for each storm event, are shown below in
Table 8.




 Ref: B16239CR002                                           - 8 -                     Stormwater Management Plan
                                                                                   Noosa Energy Centre - Noosaville

Page 13

                                        LAMBERT & REHBEIN
                                           ENGINEERS • MANAGERS • SCIENTISTS


                        Table 8 XPStorm Peak Flow Rates Comparison
                      XPStorm Pre       XPStorm Post Development   Increase         Increase
 ARI (Years)
                   Development (m3/s)        Mitigated (m3/s)        (m3/s)            (%)

     Q1                  0.047                   0.047               0.000              0%

     Q2                  0.079                   0.065             -0.014             -18%

     Q5                  0.112                   0.085             -0.027             -24%

     Q10                 0.128                   0.109             - 0.019            - 15%

     Q20                 0.150                   0.136             - 0.014             - 9%

     Q50                 0.162                   0.153             - 0.009             - 6%

    Q100                 0.180                   0.179             - 0.001             - 1%




Ref: B16239CR002                                     - 9 -                       Stormwater Management Plan
                                                                              Noosa Energy Centre - Noosaville


[OCR of page images]
LAMBERT & REHBEIN

ENGINEERS . MANAGERS. SCIENTISTS

Table 8 XPStorm Peak Flow Rates Comparison

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ARI (Years) CS) Ott AS ail Fe! Development _ Increase Titer)

Development (m/s) Tiere Ne (iE) (iE) (%)

Q1 0.047 0.047 0.000 0%

Q2 0.079 0.065 -0.014 -18%

Q5 0.112 0.085 -0.027 -24%

Q10 0.128 0.109 - 0.019 - 15%
Q20 0.150 0.136 - 0.014 - 9%
Q50 0.162 0.153 - 0.009 - 6%
Q100 0.180 0.179 - 0.001 -1%

Ref: B16239CRO02 -9- Stormwater Management Plan

Noosa Energy Centre - Noosaville

Page 14

                                                  LAMBERT & REHBEIN
                                                    ENGINEERS • MANAGERS • SCIENTISTS


4.0     STORMWATER QUALITY

4.1     STORMWATER QUALITY OBJECTIVES
In accordance with the SEQ Regional Plan Implementation Guideline No.7 for Water Sensitive
Urban Design the required operational phase Water Quality Objectives (WQOs) are provided in
Table 9 below.
                       Table 9 Operational Phase Water Quality Objectives:
                                      Pollutant                      Pollutant Load
                                                                      Reductions
                        Total Suspended Solids (TSS)                     80%
                           Total Phosphorous (TP)                        60%
                              Total Nitrogen (TN)                        45%
                             Gross Pollutants (GP)                       90%



4.2     POTENTIAL WATER QUALITY IMPACTS
4.2.1   CONSTRUCTION PHASE

Potential exists during the construction phase of development for sediment (from exposed soil
areas and stockpiles) to become mobilised by stormwater. This results in suspended solids
entering waterways. Table 10 below details the typical stormwater pollutants which may be
generated during the construction phase of a development.
                          Table 10 Typical Construction Phase Pollutants

                      Pollutant                                            Sources
                                                        Paper, construction packaging, food packaging,
                         Litter
                                                                  cement bags and off-cuts.
                                                       Unprotected exposed soils and stockpiles during
                      Sediment
                                                                  earthworks and building.
                                                        Fuel and oil spills and leaks from construction
                    Hydrocarbons
                                                                           equipment.
                                                       Cement slurry, asphalt prime, solvents, cleaning
                    Toxic Materials
                                                                 agents and wash waters.
              pH altering substances                           Cement slurry and wash waters.



 Ref: B16239CR002                                           - 10 -                         Stormwater Management Plan
                                                                                        Noosa Energy Centre - Noosaville

Page 15

                                          LAMBERT & REHBEIN
                                             ENGINEERS • MANAGERS • SCIENTISTS




Stormwater quality during the construction phase of the development should be addressed in an
Erosion and Sediment Control Plan. The plan should address construction phase erosion and
sediment control issues in accordance with the Institute of Engineers Australia (Qld) Erosion and
Sediment Control Guidelines. The Erosion and Sediment Control Plan should also be in
accordance with Noosa Council guidelines.

4.2.2   OPERATIONAL PHASE

During the operational phase of the development, the following impacts have been identified in
relation to stormwater runoff and water quality of the receiving waterways:

•       Potential exists for gross pollutants, which include human derived litter, coarse sediment
        and vegetation, to affect the drainage capacity of stormwater systems. Gross pollutants
        may physically affect the downstream waterway habitats and organisms such as
        entangling birds and aquatic animals. Gross pollutants are also typically unsightly and
        reduce the visual amenity of the site;
•       Sediment can become mobilised by stormwater as suspended solids from the erosion of
        exposed soil areas, un-mulched garden beds, sediment deposited on car park and
        hardstand areas by vehicles and by atmospheric deposition of sediment. Suspended
        solids can be used as a transport medium resulting in nutrients and heavy metals making
        their way into waterways. Suspended solids can block stormwater systems leading to
        local flooding and can also affect receiving waterways physically through smothering
        aquatic flora and fauna; and
•       Nutrients can enter waterways in stormwater runoff through many sources including
        detergents used in car washing, fertilizers from landscaping and lawn areas, nitrous
        oxide deposition from vehicle exhausts, and organic waste. High nutrient levels can lead
        to eutrophication of the receiving waterways resulting in algal blooms (toxic in some
        cases) and excessive macrophyte growth.
Implementation of the appropriate Stormwater Quality Improvement Devices (SQIDs) would
ensure that stormwater discharge from the site would adhere to Noosa Council’s requirements
and objectives.

4.3     STORMWATER QUALITY ASSESSMENT
The potential impact and effectiveness of the proposed SQIDs was assessed using MUSIC
Version 6.1.0. MUSIC is a software tool that simulates stormwater runoff quality from different
sources and the effectiveness of SQIDs.




 Ref: B16239CR002                                       - 11 -                      Stormwater Management Plan
                                                                                 Noosa Energy Centre - Noosaville

Page 16

                                          LAMBERT & REHBEIN
                                             ENGINEERS • MANAGERS • SCIENTISTS


The MUSIC modelling program is able to simulate the quantity and quality of stormwater runoff
from catchment sizes which range from a single house lot up to 100 km2. The program is able to
report on the pollution uptake efficiencies of a wide range of treatment measures.

The model can be used to generate both pollutant concentrations and long term pollutant loads
and is recognised as the most appropriate modelling software for the planning of stormwater
treatment measures for commercial catchments.

4.3.1   GENERAL MUSIC MODELLING APPROACH

MUSIC modelling was conducted generally in accordance with the Healthy Waterways Water by
Design “MUSIC Modelling Guidelines, Version 1.0, 2010”. The MUSIC guidelines suggest that
the timestep of each model should match the time of concentration of the smallest source node
and the smallest detention time of any treatment devices. As WSUD principles are to be applied,
a six (6) minute timestep should be adopted to match the range of treatments incorporated and
the low time of concentrations expected from the catchment.

Table 11 below, details the MUSIC parameters utilised in running the model.
                         Table 11 MUSIC Model Hydrological Parameters

                     Parameter                                      Description
                                                    Cooroy Composite -SCRC North (Stn. Number:
               Meteorological Data
                                                         40059) from 1973 to 1983 inclusive
                    Source Node                          Commercial – Road, Roof, Ground
              Modelling Time Step                                    6 minute
                    Drainage Link                                   No Routing
             Pollutant Concentration                     Commercial – Roof, Ground, Roads
           Rainfall-Runoff Properties                               Commercial


The MUSIC model defaults of k and C* assist in the definition of treatment performance and are
based on research and judgement by academics and industry leaders assisting the eWater
Cooperative Research Centre (CRC). The k constant is used in a first order kinetic model to
simulate the removal of pollutants within the treatment system. C* values represent the
background concentrations of pollutants for end of line treatment measures. All modelling for this
study has used the default values for k and C*.




 Ref: B16239CR002                                       - 12 -                       Stormwater Management Plan
                                                                                  Noosa Energy Centre - Noosaville

Page 17

                                         LAMBERT & REHBEIN
                                            ENGINEERS • MANAGERS • SCIENTISTS


4.3.2   DEVELOPED SITE CATCHMENTS

The intent of the stormwater quality assessment is to provide an appropriate level of stormwater
quality improvement for the proposed developed site.

A review of the proposed development displayed in the architectural plans in Appendix B was
undertaken to determine an appropriate stormwater quality modelling approach. Refer also to
catchments shown on the civil engineering plans in Appendix C.

MUSIC models the rainfall-runoff and pollutant generation processes within a source node with
unique pollutant export parameters for each different land use type. As required by the Water by
Design, MUSIC Modelling Guidelines Version 1.0 (2010), the proposed development was
modelled using a “split catchment approach”, where each surface of the development is
separated based on its land use. A breakdown of the proposed developed catchment areas is
presented in Table 12.

                    Table 12 Proposed Development Sub-Catchment Areas
                         Roof            Road          Ground             Ground
 Catchment                                                                                      TOTAL
                          (m2)           (m2)       (Pervious m2)     Impervious m2
 Catchment A              586            1351              95               141                  2,173
 Catchment B               -              140             100                13                   253

   TOTALS                586 m2        1,491 m2         195 m2              154                2,426 m2


The identified sub catchments were modelled with commercial node parameters as per the
Healthy Waterways Water by Design “MUSIC Modelling Guidelines Version 1.0, 2010”. These
parameters presented in Table 13 and Table 14 overleaf.




 Ref: B16239CR002                                      - 13 -                        Stormwater Management Plan
                                                                                  Noosa Energy Centre - Noosaville

Page 18

                                                   LAMBERT & REHBEIN
                                                      ENGINEERS • MANAGERS • SCIENTISTS


                          Table 13 MUSIC Rainfall-Runoff Parameters

                         Pollutant                                   Commercial Land Use

                  Rainfall Threshold (mm)                                           1
                Soil Storage Capacity (mm)                                          18
                     Initial Storage (%)                                            10
                    Field Capacity (mm)                                             80
             Infiltration Capacity Coefficient a                                    243
              Infiltration Capacity Exponent b                                      0.6
                     Initial Depth (mm)                                             50
                 Daily Recharge Rate (%)                                            0
                 Daily Baseflow Rate (%)                                            31
              Daily Deep Seepage Rate (%)                                           0
                       Source: Water by Design “MUSIC Modelling Guidelines”, Version 1.0, 2010



              Table 14 Pollutant Export Parameters Adopted in the MUSIC model
                        Pollutant                                             Commercial Land Use
                                                                            Mean          Standard Deviation
                                          Base Flow                          N/A                      N/A
                            Roof
                                          Storm Flow                        1.30                      0.38
  Total Suspended
                                          Base Flow                         0.78                      0.39
        Solids             Road
                                          Storm Flow                        2.43                      0.38
                                          Base Flow                         0.78                      0.39
                          Ground
                                          Storm Flow                        2.16                      0.38
                                          Base Flow                          N/A                      N/A
                            Roof
                                          Storm Flow                        -0.89                     0.34
                                          Base Flow                          -0.6                      0.5
 Total Phosphorous         Road
                                          Storm Flow                        -0.30                     0.34
                                          Base Flow                          -0.6                      0.5
                          Ground
                                          Storm Flow                        -0.39                     0.34
                                          Base Flow                          N/A                      N/A
                            Roof
                                          Storm Flow                        0.37                      0.34
                                          Base Flow                         0.32                       0.3
    Total Nitrogen         Road
                                          Storm Flow                        0.37                      0.34
                                          Base Flow                         0.32                       0.3
                          Ground
                                          Storm Flow                        0.37                      0.34
Note: Parameters are shown as Log10 of Concentration in mg/L
Source: Water by Design “MUSIC Modelling Guidelines”, Version 1.0 2010



 Ref: B16239CR002                                                  - 14 -                           Stormwater Management Plan
                                                                                                 Noosa Energy Centre - Noosaville

Page 19

                                             LAMBERT & REHBEIN
                                                 ENGINEERS • MANAGERS • SCIENTISTS


4.4     SELECTION OF STORMWATER TREATMENT TRAIN
As detailed in Section 3, site runoff from Catchment A will be directed to the proposed detention
tank for attenuation. Catchment B will bypass the detention structure.

It is proposed to treat site runoff via a series of filter baskets within gully pits and filter cartridges
incorporated in the detention tank, as such, it is proposed to treat runoff from Catchment A and
Catchment B will bypass treatment.

Stormwater360, a manufacturer and supplier of mechanical filtration systems, were engaged to
size and model appropriate systems for the proposed development. The filter cartridges proposed
use the PSorb filter media, an alternative to the ZPG stormfilter. Stormwater 360 confirms that the
PSorb option requires less cartidges however this system is subject to Noosa Council approval.

The proposed treatment train requires runoff from the Catchment A road areas and paved and
landscaped areas to be pre-treated with Enviropods fitted to gully pits prior to discharging to the
detention tank for treatment via the filter cartridges. The roof areas of Catchment A will be
conveyed directly to the detention tank for treatment. Refer to MUSIC Model in Appendix F.

It should be noted, that an approved equivalent mechanical filtration system may be utilised
based on price or availability at the time of construction.

Refer to Table 15 below for the stormwater quality treatment details and the civil engineering
plans attached in Appendix C, for the conceptual treatment device locations.

The use of the filter cartridge’s is subject to Noosa Council approval.



                     Table 15 Stormwater Quality Treatment Device Details
         Treatment Device Adopted                                         Details
Catchment A
Stormwater360 EnviroPod (EP) Filter             • 2 x EnviroPod Series 200 filter fitted to stormwater
                                                  inlet pits;
Stormwater360 StormFilter                       • 4-cartridge (690mm PSorb) StormFilter system - a
                                                  passive, siphon-actuated, radial flow, self-cleaning
                                                  media filtration cartridges.




 Ref: B16239CR002                                           - 15 -                         Stormwater Management Plan
                                                                                        Noosa Energy Centre - Noosaville

Page 20

                                               LAMBERT & REHBEIN
                                                    ENGINEERS • MANAGERS • SCIENTISTS


4.5      STORMWATER QUALITY MODELLING RESULTS
The predicted MUSIC pollutant concentrations are provided in Table 16.
                                    Table 16 MUSIC Model Results
                                   Initial Pollutant    Residual Pollutant Water Quality     Reduction
                                    Concentration        Concentration      Objectives       Achieved
Total Suspended Solids (TSS)           965 kg/yr            165 kg/yr          80%             82.9%
  Total Phosphorous (TP)               1.84 kg/yr          0.645 kg/yr         60%             64.9%
      Total Nitrogen (TN)               11 kg/yr            6.05 kg/yr         45%              45%
   Gross Pollutants (GP)               75.6 kg/yr           5.08 kg/yr         90%             93.3%
(Refer to Appendix C for MUSIC Model Output Details).

As shown in Table 16, MUSIC predicts that the proposed treatment train will meet the SEQ
Regional Plan Implementation Guideline No.7 for Water Sensitive Urban Design water quality
objectives for key pollutants including TSS, TP, TN and GP. Copies of the model outputs are also
attached in Appendix F.




  Ref: B16239CR002                                            - 16 -                     Stormwater Management Plan
                                                                                      Noosa Energy Centre - Noosaville

Page 21

                                          LAMBERT & REHBEIN
                                              ENGINEERS • MANAGERS • SCIENTISTS


5.0     MAINTENANCE

Listed below are the water quality maintenance protocols proposed by Lambert & Rehbein for the
Stormwater360 gross pollutant filters (EnviroPods) and mechanical filtration cartidges
(Stormfilters). Existing local authority maintenance protocols should be adhered to, in conjunction
with the suggestions in this report.

5.1     STORMWATER360 ENVIROPODS AND MECHANICAL FILTRATION
        SYSTEM
The primary purpose of the stormwater treatment train is to filter out and prevent pollutants from
entering our waterways. Like any effective filtration system, periodically these pollutants must be
removed to restore the system to its full efficiency and effectiveness. Maintenance requirements
and frequency are dependent on the pollutant load characteristics of each site. Maintenance must
be performed in accordance with Stormwater360’s Operation & Maintenance Guidelines attached
in Appendix G to ensure the ongoing effectiveness of the proposed treatment devices.
Should an alternative equivalent mechanical treatment system be proposed during construction
the procedures for the ongoing maintenance of the alternative system should be provided.




 Ref: B16239CR002                                       - 17 -                       Stormwater Management Plan
                                                                                  Noosa Energy Centre - Noosaville

Page 22

                                           LAMBERT & REHBEIN
                                              ENGINEERS • MANAGERS • SCIENTISTS


6.0     CONCLUSIONS AND RECOMMENDATIONS

Lambert & Rehbein (SEQ) Pty Ltd has been commissioned by Denmac Nominees Pty Ltd to
develop a conceptual Stormwater Management Plan for a proposed Energy Centre at 140–142
Eumundi Noosa Road, Noosaville. The site is located within the Noosa Council Local
Government Area.

Based on the XPStorm modelling results for the project, the proposed detention tank detailed in
this report will satisfy Noosa Council requirements for stormwater detention by attenuating peak
flows for all design storms up to and including a Q100 storm. The required stormwater attenuation
will be provided via a detention tank located under the service station shop totalling 34m3.

Stormwater quality treatment has been provided for the site. Stormwater gully filter baskets and
filter cartridges located within the detention tank will meet the required water quality objectives.

A conceptual civil engineering plans are enclosed in Appendix C of this report to illustrate
anticipated stormwater management for the proposed development. It should be noted that these
plans are preliminary only and will be subject to confirmation during detailed design.

Lambert & Rehbein considers that the proposed stormwater detention and quality treatment
measures detailed in this report will satisfy Noosa Council stormwater management requirements
for the proposed development. Further, Lambert & Rehbein has not identified any stormwater
drainage constraints that, in our opinion, should preclude approval of the development by Noosa
Council.




 Ref: B16239CR002                                        - 18 -                       Stormwater Management Plan
                                                                                   Noosa Energy Centre - Noosaville

Page 23

                LAMBERT & REHBEIN
                  ENGINEERS • MANAGERS • SCIENTISTS




                 APPENDIX A
PLAN SHOWING DETAILS OF LOT 2 ON RP173876

Page 24

 

 

 

 

 

              

 

 

 

 

 

 

 

 

 

 

2
Vi
gy mo MH LEGEND,
LL3.94 STORMWATER GRATE TREES SERVICES
. A- ASH EJ - ELECTRIC JUNCTION BOX
STORMWATER MANHOLE 8-BLooDWooD FOB - HOUSE CONNECTION BRANCH
a BA- BANKSIA
88. BOTTLEBRUSH
A 2 (© _ SEWER MANHOLE Bx BOX
D - CADAGHI UL-LIDUEVEL
ci-cimeus LP-LiGHT POLE
GU-CAMPHORLAUREL —_MH-MAN HOLE
El] ELECTRICITY JUNCTION BOX oo Mit MAN HOLE
6-cum SV_STOP VALVE
TELSTRA PIT SC: GOLDEN CANE Swe STORMWATER PIT
A HP- HOOP PINE ye. TeustRapr
MM] WATER METER 1B IRONBARK WH -WATER METER
1 JAGARANDA
© [opyprant WA MAROGANY
MO- MANGO
wy 3 bd STOP VALVE wo nae omen
‘AHO - AUSTRALIAN HEIGHT DATUM
S RP173876 @ POWER POLE a eaPeRaARK
PI PINE
LIGHT POLE PN PANDANAS
PO -POINCIANA
LQ, © BENCH MARK '$ - STRINGYBARK RL- REDUCED LEVEL
BS Note
> "TREES UNDER 0.3m TRUNK.
OM - UMBRELLA DIAMETER NOT LOCATED.
W-WaTTLe
X-BxOTIe
DR 8

     

Block Building

CP

SP106089

 

Block Building

    
 

 

LINETYPE LEGEND

— BANK BOTTOM

Libbbbbbbbbbb BANK TOP

loti titi patter

— — — —-— crow
GUTTER

------- GRAVEL

> mr — 9 — mr BITUMEN

KERB. Block Building

 

MAX WATTERSON
ASSOCIATES

12 Maple Street

PO Box 639

Cooroy Qld 4563

Ph. (07) 54426121

Fax. (07) 54425125

Email. [email protected]

 

Client: DENMAC
NOMINEES

 

Project:

PLAN SHOWING
DETAILS OF LOT 2
ON RP173876.

 

LOCAL GOVT: NOOSA S.C.

LOCALITY: NOOSAVILLE

 

 

 

 

 

CONCRETE

ELECTRICAL DENOTES GRAVEL

 

 

rn
&

bia

—— Ww ——_ water
DAMIPOOL
ey 1
DRAINAGE
taeeLIne RP173876
GARDEN
TELSTRA
———_ BUILDING
Se PAVING
BQRRURGG00008 RETAINING WALL
WALL
—1—1—1 11 GUARDRAIL
FENCE Scale 1:300 - Lengths are in Metres
—_—_—_—_— BDY
UAIOR CONTOUR | | | | | | | | | |

MINOR CONTOUR 3 0 3 6 9 12 15 18 21 24 27 30

DENOTES CONCRETE

DENOTES BUILDING

DENOTES BITUMEN

DENOTES PAVING

  

DENOTES DAMPOOL

 

 

 

 

 

 

 

 

 

 

 

 

 

Scale: 1:300 Plan 1 of 1
Datum: AHD Date: 3-06-16
oom us
Cont.Int: 0.6m 4 6-4 1 87AA
NOTE:

This plan has been prepared for building
design purposes only.

Underground services not located except
where evident on surface.

 

 

Page 25

       LAMBERT & REHBEIN
         ENGINEERS • MANAGERS • SCIENTISTS




        APPENDIX B
  MASTER PLAN DA01
SITE LOCATION PLAN DA02
  ELEVATIONS 01 DA03
  ELEVATIONS 02 DA04

Page 26

                                                                                                                       Telephone +61 7 3840 9999
                                                                                                                       [email protected]
                                                                                                                       128 Robertson Street
                                                                                                                       Fortitude Valley
                                                                                                                       Qld 4006 Australia
                                                                                                                       thomsonadsett.com

                                                                                                                      © Copyright
                                                                                                                       These drawings and designs and the copyright
                                                                                                                       therof are the property of Thomson Adsett Pty
                                                                                                                       Ltd and must not be used, retained or copied
                                                                                                                       without written permission of Thomson Adsett
                                                                                                                       Pty Ltd. ABN 76 105 314 654 Trading as
                                                                                                                       ThomsonAdsett. Dimensions take precedence
                                                                                                                       over scaling. Do not measure off drawings as
                                                                                                                       print sizes may vary




                                                                                                                      NOOSA ENERGY
                                                                                                                      CENTRE
                                                          DEVELOPMENT SCHEDULE
                                                                                    GFA      CAR RATIO   CARS REQ'D   140-142 EUMUNDI - NOOSA RAOD,
                                                                                                                      NOOSAVILLE, QLD 4566
                                                          SERVICE STATION & SHOP    200m²    1 / 20      10
                                                          FOOD OUTLET               90m²     1 / 10      9
                                                          TOTAL GFA                 290m²    TOTAL       19
                                                          TOTAL SITE AREA          2423m²
                                                                                                                      for

                                                                                                                      DENMAC NOMINEES PTY LTD
                                                          CARS                          18
                                                          DISABLED SPACES                1
                                                          TOTAL CARS                    19

                   FOOD 90m2




                                                  EXIT
                               FUEL CANOPY OVER
                                                                        LANDSCAPING
                                                                                                    TREE REMOVED
     COLES EXPRESS




                                                           LANDSCAPING TO          202m²
         200m2




                                                           DEVELOPMENT SITE
                                                           % OF DEVELOPMENT        8%




                                                  ENTRY
                                                           SITE COVERAGE                            TREE RETAINED


REFUSE




                                                                                                                          7   12/07/2016   UPDATE                               MH
                                                                                                                          6   08/07/2016   UPDATE                               MH
                                                                                                                          5   28/06/2016   UPDATE                               MH
                                                                                                                          4   16/06/2016   UPDATE                               MH




                                                                                                                                                                                       P:\RET\16.0122.17 - NOOSA ENERGY CENTRE\2_Design\9_Revit\16.0122.17 Noosa Energy Centre.rvt
                                                                                                                          3   15/06/2016   PRELIMINARY ISSUE                    MH
                                                                                                                          2   14/06/2016   UPDATE                               MH
                                                                                                                          1   13/06/2016   PRELIMINARY ISSUE                    MH
                                                                                                                       rev date            details                             init.


                                                                                                                      drawn                           date
                                                                                                                      MH                              JUNE 2016
                                                                                                                      checked                         date
                                                                                                                      TH                              JUNE 2016
                                                                                                                      verified                        date
                                                                                                                      SB                              JUNE 2016


                                                                                                                      scale
                                                                                                                      0          5    10      15               25 m




                                                                                                                      MASTER PLAN


                                                                                                                      scale                                  project no.




                                                                                                                                                                                       12/07/2016 2:27:55 PM
                                                                                                                      As indicated                           16.0122.17
                                                                                                                      sheet no.                              revision

                                                                                                                      DA01                                   7
                                                                                                                                           original sheet size - A1 (594mm x 841mm)

Page 27

                                                                                                                                                                                                DEVELOPMENT SCHEDULE
                                                                                                                                                                                                                                                    GFA      CAR RATIO   CARS REQ'D
                                                                                                                                                                                                SERVICE STATION & SHOP                              200m²    1 / 20      10
                                                                                                                                                                                                FOOD OUTLET                                         90m²     1 / 10      9             Telephone +61 7 3840 9999
                                                                                                                                                                                                TOTAL GFA                                           290m²    TOTAL       19            [email protected]
                                                                                                                                                                                                TOTAL SITE AREA                                    2423m²                              128 Robertson Street
                                                                                                                                                                                                                                                                                       Fortitude Valley
                                                                                                                                                                                                                                                                                       Qld 4006 Australia
                                                                                                                                                                                                CARS                                                    18                             thomsonadsett.com

                                                                                                                                                                                                DISABLED SPACES                                          1                            © Copyright
                                                                                                                                                                                                                                                                                       These drawings and designs and the copyright
                                                                                                                                                                                                TOTAL CARS                                              19                             therof are the property of Thomson Adsett Pty
                                                                                                                                                                                                                                                                                       Ltd and must not be used, retained or copied
                                                                                                                                                                                                                                                                                       without written permission of Thomson Adsett
                                                                                                                                                                                                                                                                                       Pty Ltd. ABN 76 105 314 654 Trading as
                                                                                                                                                                                                                                                                                       ThomsonAdsett. Dimensions take precedence
                                                                                                                                                                                                                                                                                       over scaling. Do not measure off drawings as
                                                                                                                                                                                                                                                                                       print sizes may vary
                                                                                                                                                                                                                          LANDSCAPING
                                                                                                                                                                                                                                                                    TREE REMOVED
                                                                                                                                                                                                 LANDSCAPING TO                                    202m²
                                                                                                                                                                                                 DEVELOPMENT SITE
                                                                                                                                                                                                                                                                                      NOOSA ENERGY
                                                                                                                                                                                                 % OF DEVELOPMENT                                  8%
                                                                                                                                                                                                                                                                                      CENTRE
                                                                                                                                                                                                 SITE COVERAGE                                                      TREE RETAINED
                                                                                                                                                                                                                                                                                      140-142 EUMUNDI - NOOSA RAOD,
                                                                                                                                                                                                                                                                                      NOOSAVILLE, QLD 4566




                                                                                                                                                                                                                                                                                      for

                                                                                                                                                                                                                                                                                      DENMAC NOMINEES PTY LTD


                                                   6000                    10280          2690             5400        9000                               8000                       12510               5400               1030

                                         730              840               BATTEN SCREEN




                                                                                                                                                                                                         660
                           RL4.67                         RL6.16            STAIRS TO LOWER LEVEL                    SITE BOUNDARY                                                                                 RL9.96




                                                                                            1260
                                                          2
                                                                                                                               DA04                                                                                 2
                                                                                                      11                                                                                                                    1040




                                                                                                                                                         7870
                                                                                                                                  1                                      EXISTING BUILDING TO
                                                                                                                                                                         BE REMOVED




                                                                                                                                                                 12000
                                                                            FOOD OUTLET
                                                                               90m2
                 6350




                        BIKE RACKS UNDER




                                                                                                                                                                                                        740
                        4No. STAFF
                                                               SERVICES




                        CAR PARKS                                                                                         12470




                                                                                                                                                                                                                            8800
                                                                              RL10.50                                                                                                                                                       EXIT
                                 ROOF OVER




                                                                                            RL10.40



                                                                                                      RL10.35                                                                                        AIR &
                                                                                                                                                                                                    WATER
                                               DA03 4                                                                                                                                   ELECTRIC
                                                                                                                  ACCESSIBLE
                                                                                                                                                                                        CHARGE
                                                                                                                  CAR PARK                                                              BIKE FIX
                          RL6.00
                                                                                                                                                                                        STATION




                                                                                                                                                                                                                            8660
                                                                                                                                                                                                               2



                                                                                                                                      FUEL CANOPY OVER
        RL8.56                                                                                                           2 DA03                                                        1 DA03
                                                                                                                                                                                                                   3000
EXISTING                                                                    SERVICE
                                                                          STATION AND
TRANSFORMER                 720                                           SHOP 200m2
                                                                                                                                                                                                                                                                                          7   12/07/2016   UPDATE                               MH
                                                          2                                                       PHOTOVOLTAIC                                                                                                                                                            6   08/07/2016   UPDATE                               MH




                                                                                                                                                                                                                            10500 RL10.70
                                                                                                                                                                                                                    6                                                                     5   28/06/2016   UPDATE                               MH
                                                                                                                  PANELS                                                                             PYLON                                                                                4   16/06/2016   UPDATE                               MH
                                                                           RL10.50                                                                                                                    SIGN         DA03




                                                                                                                                                                                                                                                                                                                                                       P:\RET\16.0122.17 - NOOSA ENERGY CENTRE\2_Design\9_Revit\16.0122.17 Noosa Energy Centre.rvt
              RAIN WATER TANKS                                                                                                                                                                                                                                                            3   15/06/2016   PRELIMINARY ISSUE                    MH
                                                                                                                                                                                                                                                                                          2   14/06/2016   UPDATE                               MH
                                                                                                                                                                                                                                                                                          1   13/06/2016   PRELIMINARY ISSUE                    MH
                                                                                                                                                                                                                                            ENTRY                                      rev date            details                             init.
                                                                                                                                                                                                      RL10.50
                               SITE BOUNDARY




                                                                                                                                                                                                                                                                                      drawn                           date
                                                                                                                                                                                                                                                                                      MH                              JUNE 2016
                                                                                                                                                                                                                                                                                      checked                         date
                                                                                                                                                                                                                                                                                      TH                              JUNE 2016




                                                                                                                                                                                                                            5600
                                                                              REFUSE                                       2                                                                                                                                                          verified                        date
                                                                                                                                                                                                                                                                                      SB                              JUNE 2016
                                                                                                                          DA04


                                               RL6.73         RL7.37                                                                                                                                                                                                                  scale
                                                                                                                     SITE BOUNDARY                                                                   10560 RL11.10
                                                                                                                                                                                                                                                                                      0          1.0   2      3                5m




                                                                                                                                                                                                                                                                                      SITE LOCATION PLAN


                                                                                                                                                                                                                                                                                      scale                                  project no.




                                                                                                                                                                                                                                                                                                                                                       12/07/2016 2:28:05 PM
                                                                                                                                                                                                                                                                                      As indicated                           16.0122.17
                                                                                                                                                                                                                                                                                      sheet no.                              revision

                                                                                                                                                                                                                                                                                      DA02                                   7
                                                                                                                                                                                                                                                                                                           original sheet size - A1 (594mm x 841mm)

Page 28

                                                                                                                                                                                                                                                     2010          510
                                                                                                                                                                                                                                                              SETBACK



                                                                                                                                                                                                                                                                                                    Telephone +61 7 3840 9999

                                                1 2 5               3           1       4                2         12                                     11       8                                                                                                                                [email protected]
                                                                                                                                                                                                                                                                                                    128 Robertson Street
                                                                                                                                                                                                                                                                                                    Fortitude Valley
                                                                                                                                                                                                                                                                                                    Qld 4006 Australia
                           SITE BOUNDARY




                                                                                                                                                                                       SITE BOUNDARY
                                                                                                                                                                                                           FUEL CANOPY                                                                              thomsonadsett.com




                                                                                                                                            850
                                                                                                                                                                                                                    15205
                                                                                                                                                                                                                                                                                                   © Copyright
                                                                                                                                                                                                        SERVICE STATION                                                                             These drawings and designs and the copyright
                                                                                                                                                                                                                  ROOF                                                                              therof are the property of Thomson Adsett Pty
                                                                                                                                                                                                                                                                                                    Ltd and must not be used, retained or copied




                                                                                                                                                                                                                                                                         SITE BOUNDARY
                                                                                                                                                                                                                    14850                                                                           without written permission of Thomson Adsett




                                                                                                                                                   5550
                                                                                                                                                                                                                                                                                                    Pty Ltd. ABN 76 105 314 654 Trading as




                                                                                                                                            4710
              SHOPFRONT




                                                                                                                                                                                                                                                                                                    ThomsonAdsett. Dimensions take precedence




                                                                                                                                                                                                                              7000
                                                                                                                                                                                                                                                                                                    over scaling. Do not measure off drawings as
 2800




                                                                                                                                                                                                                                                                                                    print sizes may vary


                                                                                                                                                                                                                 GROUND
                                                                                                                                                                                                                    10500                                                                          NOOSA ENERGY
                                                                                                                                                                                                                                                                                                   CENTRE
                                            1     SOUTH EAST - ELEVATION AA
                                           DA02
                                                  1 : 100
                                                                                                                                                                                                                                                                                                   140-142 EUMUNDI - NOOSA RAOD,
                                                                                                                                                                                                                                                                                                   NOOSAVILLE, QLD 4566
                                                                                                                                                                                                                                                                                         GROUND
                                                                                                                                                                                                                                                                                           10500
                                                                                                                                                    BATTEN SCREENING
                                                                                                                                                                                                                                      6     7m HIGH PYLON SIGN
                                                                                                                                                                                                                                                                                                   for
                                                                    3           1     4                  2        12                8                     11       10                                                                DA02
                                                                                                                                                                                                                                            1 : 50
                                                                                                                                                                                                                                                                                                   DENMAC NOMINEES PTY LTD
                   SITE BOUNDARY




                                                                                                                                                                                 SITE BOUNDARY
                                                  REFUSE STORE
                                                                                                                                                                                                                                     FINISH MATERIAL LEGEND
                                                                                                                                                                                                       SERVICE STATION
                                                                                                                                                                                                                 ROOF
                                                                                                                                                                                                                   14850
                                                                                                                                                                                                                                      1
                                                                                                                                                                                                                                                     WHITE ALPOLIC
         SHOPFRONT
2800




                                                                                                                                                                                                                                      2
                                                                                                                                                                                                                 GROUND                              RED ALPOLIC
                                                                                                                                                                                                          SITE     10500
                                                                                                                                                                                                          9750
                                                                                                                                                                                                                                      3              CONCRETE PANEL WITH EXPRESSED
                                            2     SOUTH EAST - ELEVATION BB                                                                                                                                                                          JOINTS PAINTED DVWHITE
                                           DA02
                                                  1 : 100

                                                                                                                                                                                                                                      4               MATT ANODISED
                                                                                                                                                                                                                                                      SHOPFRONT BLACK


                                                                                                                                                                                                                                      5
                                                                                                                                                                                                                                                      SHELL YELLOW


                                                                                                                                                                                                                                      6               BLOCKWORK
                                                  VERTICAL BATTEN
                                                                            6       3       GREEN WALL
                                                                                                             10    12           8       7                      2        21                                                                            RETAINING WALL
                                                                                                                                                                                                                                                                                                       5
                                                                                                                                                                                                                                                                                                       4
                                                                                                                                                                                                                                                                                                           12/07/2016
                                                                                                                                                                                                                                                                                                           08/07/2016
                                                                                                                                                                                                                                                                                                                        UPDATE
                                                                                                                                                                                                                                                                                                                        UPDATE
                                                                                                                                                                                                                                                                                                                                                             MH
                                                                                                                                                                                                                                                                                                                                                             MH




                                                                                                                                                                                                                                                                                                                                                                    P:\RET\16.0122.17 - NOOSA ENERGY CENTRE\2_Design\9_Revit\16.0122.17 Noosa Energy Centre.rvt
                                                                                                                                                                                                                                                                                                       3   28/06/2016   UPDATE                               MH
                                                  SCREENING                                                                                                                                                                                                                                            2   16/06/2016   UPDATE                               MH
                                                                                                                                                                                                                                                                                                       1   15/06/2016   PRELIMINARY ISSUE                    MH
                                                                                                                                                                                                                                      7               HORIZONTAL METAL                              rev date            details                             init.
                                                                                                                                                                                                             FUEL CANOPY                              WALL CLADDING
                                                                                                                                                                                                                      15205                                                                        drawn                           date
                                                                                                                                                                                                                                                                                                   MH                              JUNE 2016
                                                                                                                                                                                                         SERVICE STATION
                                                                                                                                                                                                                   ROOF               8               DECORATIVE WALL SHEETING IN TENANT
           SITE BOUNDARY




                                                                                                                                                                             SITE BOUNDARY
                                                                                                                                                                                                                                                                                                   checked                         date
                                                                                                                                                                                                                      14850                           SPECIFIC COLOUR                              TH                              JUNE 2016
                                                                                                                                                                                                                                                                                                   verified                        date
                                                                                                                                                                                                                                                                                                   SB                              JUNE 2016
                                                                                                                                                                                                                                     9                CONCRETE PANEL WITH EXPRESSED
                                                                                                                                                                                                                                                      JOINTS PAINTED DVWHITE                       scale
                                                                                                                                                                                                                   GROUND
                                                                                                                                                                                                                      10500                                                                        0          1.0   2      3                5m

                                                                                                                                                                                                                                     10               CANTILEVER AWNINGS
       3500




                                                                                                                                                                                                                                                      COLOURBOND FASCIAS - BLACK AND WHITE
                                                                        STAIR       BIKE RACKS                    WATER TANKS
                                                                                                                                                                                                          LOWER GROUND                                                                             ELEVATIONS 01
                                                                                                                                                                                                                       7000
                                                                                                                                                                                                                                     11                GENERIC RETAIL GRAPHIC PANELS TO CREATE
                                                                                                                                                                                                                                                       ACTIVATION

                                                                                                                                                                                                                                                                                                   scale                                  project no.
                                                  NORTH WEST - ELEVATION                                                                                                                                                             12




                                                                                                                                                                                                                                                                                                                                                                    12/07/2016 2:31:56 PM
                                            4
                                           DA02
                                                                                                                                                                                                                                                       PHOTOVOLTAIC PANEL                          As indicated                           16.0122.17
                                                  1 : 100
                                                                                                                                                                                                                                                                                                   sheet no.                              revision

                                                                                                                                                                                                                                                                                                   DA03                                   5
                                                                                                                                                                                                                                                                                                                        original sheet size - A1 (594mm x 841mm)

Page 29

                                                                                                     1 2 5                                                                          8 4 12   3               10
                                     7m HIGH PYLON SIGN                     NON-ILLUMINATED FASCIA                                                                                                                                                            Telephone +61 7 3840 9999
                                     REFER TO DA01                                                                                                                                                                                                            [email protected]
                                                                                                                                                                                                                                              FUEL CANOPY     128 Robertson Street




                                                                                                             850
                                                                                                                                                                                                                                                     15205
                                                                                                                                                                                                                                                              Fortitude Valley
                                                                                                                                                                                                                                                              Qld 4006 Australia
                                                                                                                                                                                                                                           SERVICE STATION    thomsonadsett.com
SITE BOUNDARY




                                                                                                                                                                                                                                                     ROOF




                                                                                                                                                                                                                          SITE BOUNDARY
                                                                                                                      5550
                                                                                                                                                                                                                                                     14850   © Copyright




                                                                                                             4710




                                                                                                                                                                     4350
                                                                                                                                                                                                                                                              These drawings and designs and the copyright
                                                                                                                                                                                                                                                              therof are the property of Thomson Adsett Pty
                                                                                                                                                                                             STAIR                                                            Ltd and must not be used, retained or copied
                                                                                                                                                                                                                                                              without written permission of Thomson Adsett
                                                                                                                                                                                                                                                              Pty Ltd. ABN 76 105 314 654 Trading as
                                                                                                                                                                                                             GREEN WALL                           GROUND      ThomsonAdsett. Dimensions take precedence
                                                                                                                                                                                                                                                              over scaling. Do not measure off drawings as
                                                                                                                                                                                                                                                     10500    print sizes may vary




                                                                                                                                        NATURAL GR
                                                                                                                                                  OUND LEVEL                                                                                                 NOOSA ENERGY
                                                                                                                                                                                                                                            LOWER GROUND
                                                                                                                                                                                                                                                      7000
                                                                                                                                                                                                                                                             CENTRE

                     1     NORTH EAST - ELEVATION                                                                                                                                                                                                            140-142 EUMUNDI - NOOSA RAOD,
                    DA02                                                                                                                                                                                                                                     NOOSAVILLE, QLD 4566
                           1 : 100




                   10                                     3         12                                                                          1 2 5                                                                                                        for
                                                                                                                    NON-ILLUMINATED FASCIA                                                   7m HIGH PYLON SIGN                                              DENMAC NOMINEES PTY LTD
                                                                                                                                                                                             REFER TO DA01
                                                                                                                                                                                                                                              FUEL CANOPY




                                                                                                                                       850
                                                                                                                                                                                                                                                     15205
                                                                                                                                                                                                                                           SERVICE STATION
                                                                                                                                                                                                                                                     ROOF
  SITE BOUNDARY




                                                                                                                                                                                                                           SITE BOUNDARY
                                                                                                                                5550
                                                                                                                                                                                                                                                     14850




                                                                                                                                       4710
                                                                                        4350




                                                                                                                                                                                                                                                  GROUND
                                                                                                                                                                                                                                                     10500



                                                                         UND LEVEL
                   RAIN WATER TANK                            NATURAL GRO
                                                                                                                                                                                                                                            LOWER GROUND
                                                                                                                                                                                                                                                      7000




                     2     SOUTH WEST - ELEVATION
                    DA02
                           1 : 100




                                                                                                                                                                                                                                                                 4   12/07/2016   UPDATE                               MH




                                                                                                                                                                                                                                                                                                                              P:\RET\16.0122.17 - NOOSA ENERGY CENTRE\2_Design\9_Revit\16.0122.17 Noosa Energy Centre.rvt
                                                                                                                                                                                                                                                                 3   28/06/2016   UPDATE                               MH
                                                                                                                                                                                                                                                                 2   16/06/2016   UPDATE                               MH
                                                                                                                                                                                                                                                                 1   15/06/2016   PRELIMINARY ISSUE                    MH
                                                                                                                                                                                                                                                              rev date            details                             init.


                                                                                                                                                                                                                                                             drawn                           date
                                                                                                                                                                                                                                                             MH                              JUNE 2016
                                                                                                                                                                                                                                                             checked                         date
                                                                                                                                                                                                                                                             TH                              JUNE 2016
                                                                                                                                                                                                                                                             verified                        date
                                                                                                                                                                                                                                                             SB                              JUNE 2016


                                                                                                                                                                                                                                                             scale
                                                                                                                                                                                                                                                             0          1.0   2      3                5m




                                                                                                                                                                                                                                                             ELEVATIONS 02


                                                                                                                                                                                                                                                             scale                                  project no.




                                                                                                                                                                                                                                                                                                                              12/07/2016 2:34:42 PM
                  SOUTH EAST - PERSECTIVE                                                                                                                      NORTH WEST - PERSECTIVE                                                                        1 : 100                               16.0122.17
                                                                                                                                                                                                                                                             sheet no.                              revision

                                                                                                                                                                                                                                                             DA04                                   4
                                                                                                                                                                                                                                                                                  original sheet size - A1 (594mm x 841mm)

Page 30

                    LAMBERT & REHBEIN
                      ENGINEERS • MANAGERS • SCIENTISTS




                    APPENDIX C
PRELIMINARY EARTHWORKS LAYOUT PLAN B16239-CSK01
 PRELIMINARY SERVICES LAYOUT PLAN B16239-CSK02
           DETAILS SHEET B16239-CSK03

Page 31

                          4
                                   5




                           S
                                         6
                                                                            3
                                                                         RP173876
                                                          7




                                                                    8
                                                                                       Block Building




                                                                                                                                                                                                        E
                                                                                                   9




                                                                                                                                                                                                    E
       Transformer

                                                                                                                                                                    -




                                                                                                                                                                                                E
                                                                                                                                                              ---




                                                                                                                                                                                            E
       WM
         EJ

                                                                                                                             Ra




                                                                             sp
                                                                                                                                mp




                                                                           Ste




                                                                                                                                                                                        E
                                        2
              4




                                                                                                                                                De
                                                                                                                                                     ck




                                                                                                                                                                                    E
                                       2428m²
  CP                                                                                                                                                                                    10
              5




                                                                                                                                                                                E
SP106089




                                                                                                                                                                            E
              6




                                                                                                                                                                        E
                                                                                                                 S
                  7                                                               Block Building




                                                                                                                                                              E
                                                                                                                                            WM




                                                                                                                                                          E
                                                               ps
                      8




                                                              Ste




                                                                                                        S




                                                                                                                                                 E
                                                                                                                                            E
                                                                                                                                        E
                                                9




                                                                                                                                    E
                                         Block Building




                                                                                                                             E
                                                                    10
                               1




                                                                                                                         E
                          RP173876




                                                                                                                     E
                                                                                                        11
                                                                                                                                 11




                                                                                                                 E
                                                                                                             E




                                                                                                        LAMBERT & REHBEIN
                                                                                                             ENGINEERS MANAGERS SCIENTISTS

Page 32

                      S
                                                               3
                                                           RP173876




                                                                           Block Building




                                                                                                                                                                                         E
                                                                                                                                                                                     E
       Transformer

                                                                                                                                                     -




                                                                                                                                                                                 E
                                                                                                                                               ---




                                                                                                                                                                             E
       WM
         EJ

                                                                                                                Ra




                                                                 ps
                                                                                                                    mp




                                                             Ste




                                                                                                                                                                         E
                                 2                                                                                               De
                                                                                                                                      ck




                                                                                                                                                                     E
                                2428m²
  CP




                                                                                                                                                                 E
SP106089




                                                                                                                                                             E
                                                                                                                                                         E
                                                                                                    S
                                                                      Block Building




                                                                                                                                               E
                                                                                                                             WM




                                                                                                                                           E
                                                      ps
                                                   Ste




                                                                                            S




                                                                                                                                  E
                                                                                                                             E
                                                                                                                         E
                                                                                                                     E
                                  Block Building
                                                                                                                                                                                             DETENTION
                                                                                                                                                                                                34m3




                                                                                                                E
                          1                                                                                                                                                                   STORAGE




                                                                                                            E
                     RP173876




                                                                                                        E
                                                                                                    E
                                                                                                E




                                                                                            LAMBERT & REHBEIN
                                                                                                ENGINEERS MANAGERS SCIENTISTS

Page 33

LAMBERT & REHBEIN
 ENGINEERS MANAGERS SCIENTISTS


[OCR of page images]
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

    

 

 

 

 

    

 

    

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROPOSED =
ee eee PAVEMENT a
—TI RL 10.500
RL oe ee = =
ae ee _
KK — ——
ONION. OOOO OOOO, 7
OURO RQORQREOG GOR, QR CORO RORGCQQQOROROGQQQOROOQQROOROOROOGQQROR GROOM L PE
ae WS SERRE SSS SSS SSS SSIS SS SSSA SSSAES
CLEARANCE FOR FILTER = SES eee
CARTRIDGE MAINTENANCE s NES == —--7
ce oT
PROJECT mm a=
AVENUE _—
DETENTION & TREATMENT
TANK - REFER Dwg.
Ly SAA B16239-CSK02 FOR
—_ JATUM RB 5
741 DATUM RLS DETAILS
I
|
ples
SECTION -
— PROPOSED +100 a
ep PAVEMENT &
EXISTING STORMWATER —T] RL 10.500 ee eo ee
GULLY PIT Vv ee =a
(IL 2.10) SS . SSS
ROR ROR KO OU Y ORR ORR RRO RUC ORORLRRURCRRLRLPl "
LY IWMI WWI nrnruui MiiiMiiwWrriimii SES
WSL eat TSN Le ~e--—- rT
‘ oe
RE ee ee
—
1:100
REFUSE COLLECTION PROPOSED SERVICE STATION FOOD OUTLET
a AREA PAVEMENT SHOP
& aa RL 10.500
I x v
SSS TNA
NIRORIRIRIRIRIROIRIRIRIRRRRRQ -
S KR CLEARANCE FOR FILTER ————_——>~ & 5
ax CARTRIDGE MAINTENANCE N >
Z 3B
XS a
PTT TTT arr rr PJ-—-—- ee RH ee ee tL ee ~a- Tr oN
~N
4S
L
LJ —
DETENTION & TREATMENT
TANK - REFER Dwg.
LA Ly - B16239-CSK02 FOR
DATUM RL. 3 DETAILS
4:10
PROPOSED
= PAVEMENT =
PRELIMINA RY ADJACENT BUILDING a o ADJACENT BUILDING
0 SHOWN INDICATIVELY a2 a SHOWN INDICATIVELY
CONCEPT ONLY y, ONLY
DRAWING ONLY 7
= ERE KA KAKAKAKAKAKA KA KAKAKEKAKAKAKAKAKKAKKAKAKAKAKAKKAEKEEKKEKKKAKKAKKEKKEKEKXKKKKKKKKKKKKKKKKKKKKKKXKKKXXKAXQY | Z- - - -
oo , {----------------- +2 ee S
CONSTRUCTION AYE aaa
EXISTING SERVICES
NOTWITHSTANDING THAT EXISTING SERVICES MAY OR MAY NOT SECTION
BE SHOWN ON THESE DRAWINGS, NO RESPONSIBILITY IS TAKEN 0 1 2 3m
BY THE ENGINEER OR THE PRINCIPAL FOR THIS INFORMATION 1:10
WHICH HAS BEEN SUPPLIED BY OTHERS. THE DETAILS ARE
PROVIDED FOR INFORMATION ONLY. THE CONTRACTOR SHALL SCALE 1: 100
ASCERTAIN THE POSITION OF ALL UNDERGROUND SERVICES PRIOR :
TO EXCAVATION AND SHALL BE RESPONSIBLE FOR THE COST OF
REPAIRS TO DAMAGES CAUSED AS A RESULT OF THE WORKS.
Associated Consultants: R.P.D. Project: DROPOSED NOOSA ENERGY CENTRE Client:
MAX WATTERSON +ASSOCIATES Lots 2. on RP173876 2 LAMBERT & REHBEIN DENMARK NOMINEES PTY LTD
CONSULTING SURVEYORS & PLANNERS Local Govt: Noosa S.C. 140-142 EUMUNDI NOOSA ROAD,
12 MAPLE STREET PH (07) 54426121 Locality: Noosaville ~\ ENGINEERS * MANAGERS « SCIENTISTS NOOSAVILLE Draftsperson: Checked: Sheet | Drawing No.
PO BOX 639 Emai: [email protected] R.T. K.H. Size
COOROY QLD LEVEL DATUM CBD HOUSE TELEPHONE (07) 3250 9000 Title :
A.H.D. Derived B 14.07.16 S.G. FOR DA APPAROVAL LEVEL 3, 120 WICKHAM STREET FACSIMILE (07) 3250 9001 DETAILS Designer: aero Na: eee _-
Origin: PM107833 FORTITUDE VALLEY QLD 4006 EMAIL  [email protected] R.T. 0
RL: 2.730 A {08-07-16 | R.T. | ORIGINAL ISSUE P.O, BOX 112 FORTITUDE VALLEY QLD 4006 *
THIS DESIGN AND DRAWING IS COPYRIGHT. NO PART OF THIS DRAWING MAY BE REPRODUCED, STORED IN A RETRIEVAL A-C.N. 010 451 902 “Ss AS SHOWN Date: JUN 2016 B
SYSTEM OR TRANSMITTED IN ANY FORM WITHOUT THE WRITTEN PERMISSION OF LAMBERT AND REHBEIN PTY LTD | No. Date By Amendment Checked

 

 

 

 

 

 

 

 

Page 34

      LAMBERT & REHBEIN
       ENGINEERS • MANAGERS • SCIENTISTS




      APPENDIX D
XPSTORM HYDROGRAPHS


[OCR of page images]
LAMBERT & REHBEIN

ENGINEERS . MANAGERS. SCIENTISTS

APPENDIX D
XPSTORM HYDROGRAPHS

 

Page 35

XPSTORM Q1 Hydrographs
Pre-Developed




Post Developed – Unmitigated




Post Developed – Mitigated

Page 36

XPSTORM Q2 Hydrographs
Pre-Developed




Post Developed – Unmitigated




Post Developed – Mitigated

Page 37

XPSTORM Q5 Hydrographs
Pre-Developed




Post Developed – Unmitigated




Post Developed – Mitigated

Page 38

XPSTORM Q10 Hydrographs
Pre-Developed




Post Developed – Unmitigated




Post Developed – Mitigated

Page 39

XPSTORM Q20 Hydrographs
Pre-Developed




Post Developed – Unmitigated




Post Developed – Mitigated

Page 40

XPSTORM Q50 Hydrographs
Pre-Developed




Post Developed – Unmitigated




Post Developed – Mitigated

Page 41

XPSTORM Q100 Hydrographs
Pre-Developed




Post Developed – Unmitigated




Post Developed – Mitigated

Page 42

          LAMBERT & REHBEIN
            ENGINEERS • MANAGERS • SCIENTISTS




           APPENDIX E
RATIONAL METHOD CALCULATIONS


[OCR of page images]
LAMBERT & REHBEIN

ENGINEERS . MANAGERS. SCIENTISTS

APPENDIX E
RATIONAL METHOD CALCULATIONS

 

Page 43

    L&R Job No.: B16239
   Project Name: 140-142 Eumundi-Noosa Road, Noosaville
                  Date: 22/06/2016

                                                   Flow Calcs
                                        1
                        Storm   fi          I10                           tc          I      Atotal             Q
          ID                                       Fy      C10     C
                        Event
                                %      mm/hr                              min       mm/hr     ha        m3/s        L/s
Pre Development
                          1     41.0        72.3    0.80    0.78   0.62         6    121.0     0.2428   0.051          51
                          2     41.0        72.3    0.85    0.78   0.66         6    154.0     0.2428   0.069          69
                          5     41.0        72.3    0.95    0.78   0.74         6    189.0     0.2428   0.095          95
                         10     41.0        72.3    1.00    0.78   0.78         6    210.0     0.2428   0.111         111
                         20     41.0        72.3    1.05    0.78   0.82         6    238.0     0.2428   0.132         132
                         50     41.0        72.3    1.15    0.78   0.90         6    275.0     0.2428   0.167         167
                         100    41.0        72.3    1.20    0.78   0.94         6    302.0     0.2428   0.191         191

Post Development
                          1     92.0        66.7    0.80    0.88   0.70         5    129.0     0.2428   0.061          61
                          2     92.0        66.7    0.85    0.88   0.75         5    164.0     0.2428   0.083          83
                          5     92.0        66.7    0.95    0.88   0.84         5    202.0     0.2428   0.114         114
                         10     92.0        66.7    1.00    0.88   0.88         5    223.0     0.2428   0.132         132
                         20     92.0        66.7    1.05    0.88   0.92         5    253.0     0.2428   0.158         158
                         50     92.0        66.7    1.15    0.88   1.00         5    291.0     0.2428   0.196         196
                         100    92.0        66.7    1.20    0.88   1.00         5    321.0     0.2428   0.216         216




                                                    Page 1 of 1


[OCR of page images]
 

L&R Job No.: B16239

 

Project Name: 140-142 Eumundi-Noosa Road, Noosaville

 

Date: 22/06/2016

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Flow Calcs
1
ID nom f; ho Fy Cro c tc I Avotai
% | mm/hr min | mm/hr ha m?/s Lis
Pre Development
1 41.0 72.3 0.80] 0.78] 0.62 6] 121.0 0.2428] 0.051 51
2 41.0 72.3 0.85] 0.78] 0.66 6} 154.0 0.2428] 0.069 69
5 41.0 72.3 0.95] 0.78] 0.74 6] 189.0 0.2428] 0.095 95
10 41.0 72.3 1.00} 0.78} 0.78 6] 210.0 0.2428] 0.111 111
20 41.0 72.3 1.05] 0.78] 0.82 6] 238.0 0.2428] 0.132 132
50 41.0 72.3 1.15] 0.78] 0.90 6] 275.0 0.2428] 0.167 167
100 41.0 72.3 1.20] 0.78] 0.94 6} 302.0 0.2428] 0.191 191
Post Development
1 92.0 66.7 0.80] 0.88] _0.70 5] 129.0 0.2428] 0.061 61
2 92.0 66.7 0.85} 0.88] 0.75 5} 164.0 0.2428] 0.083 83
5 92.0 66.7 0.95} 0.88] 0.84 5] 202.0 0.2428] 0.114 114
10 92.0 66.7 1.00] 0.88] 0.88 5] 223.0 0.2428] 0.132 132
20 92.0 66.7 1.05] 0.88] 0.92 5} 253.0 0.2428] 0.158 158)
50 92.0 66.7 1.15] 0.88] 1.00 5] 291.0 0.2428] 0.196 196
100 92.0 66.7 1.20] 0.88] 1.00 5] 321.0 0.2428] 0.216 216

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 1 of 1

 

Page 44

       LAMBERT & REHBEIN
         ENGINEERS • MANAGERS • SCIENTISTS




        APPENDIX F
MUSIC MODELLING RESULTS


[OCR of page images]
LAMBERT & REHBEIN

ENGINEERS . MANAGERS. SCIENTISTS

APPENDIX F
MUSIC MODELLING RESULTS

 

Page 45

Road 1 - 1351m* (100% imp.)

   

Paved 1 - 141m? (100% Imp.)

Fuel Canopy - 258m* (100% imp.)

 

Roof - 328m* (100% Imp.)

Road 2 - 140m? (100% imp.)

Paved 2 - 13m* (100% Imp.),

Landscape 2 - 100m* (100% Perv.)

 
 
  

 

 

 

 

Landscape 1 - 95m* (100% Perv.)

 

 

 

 

 

2.x EnviroPod 200 (SFEP USE 20118) SF Chamber 4x 690mm PSorb (MCC Brisbane)
Treatment Train Effectiveness - Receiving Node B
Sources ResidualLoad % Reduction

Flow (ML/ yr) 3.44 3.44 0

Total Suspended Solids (kg/ yr) 965 165 82.9

Total Phosphorus (kg/ yr) 1.84 0.645 64.9

Total Nitrogen (kg/yr) il 6.05 45

Gross Pollutants (kg/ yr) 75.6 5.08 93.3

 

 

 

 

 

 

 

 

 

&| |

 

 

 

 

 

 

 

Page 46

                      LAMBERT & REHBEIN
                         ENGINEERS • MANAGERS • SCIENTISTS




                       APPENDIX G
STORMFILTER & ENVIROPOD OPERATION & MAINTENANCE MANUAL

Page 47

                             Operations and maintenance
                                  StormFilter EnviroPod Treatment Train
                                            ®




Our waterways. Our future.

Page 48

  Device details
  Location of Device
  GPS Coord                   N:              E:                D P Number:
  Relevant Council

  Company
  Contact                                               Email                                            Ph
  Engineer
  Contact                                               Email                                            Ph


  SFEP Treatment
  1

  2


  Frequency of Inspection/Maintenance                            Maintenance Estimated Annual Cost
                Inspections                       Major          StormFilter
                (time/year)                       Maintenance
                                                                 EnviroPod
  StormFilter
                                                                 TOTAL




  EnviroPod




Contents                                                          The Stormwater Management StormFilter                    17
                                                                      1.1      Description                                 18
                                                                      1.2      Operation                                   18
Treatment Train Specifications                            2
                                                                      1.2.1 Purpose                                        18
Introduction                                               4
                                                                      1.2.2 Sizing                                         18
   Why cleaning and maintenance are so vitally important 4
                                                                  StormFilter overview                                     18
Health and safety                                         5
                                                                      1.2.3 Basic function                                 19
   2.1	Personnel health and safety                       6
                                                                      1.2.4 Priming system function                        19
   2.2   Traffic control                                  7
                                                                      1.2.5 Maintenance overview                           19
   2.3   Confined spaces                                  7
                                                                  StormFilter maintenance and
   3.1	Maintenance and monitoring of EnviroPod filters 8
                                                                  performance expectations                                 20
Operations                                                 8
                                                                      2.1      Types of maintenance                        21
   3.2   Stormwater pit cover removal                     9
                                                                      2.2      Maintenance activities                      22
   3.2.1 Hinged pit grates                                9
                                                                      2.2.1 Maintenance activity timing                    22
   3.2.2 Non-hinged pit grates                           10
                                                                      2.2.2 Maintenance activity frequency                 22
   3.3   Cleaning methods                                11
                                                                      2.3      Maintenance crew requirements               22
   3.3.1 Cleaning using an inductor truck                11
                                                                      2.4      Maintenance methods                         23
   3.3.2 Hand maintenance                                11
                                                                      2.4.1	Minor maintenance/inspection (twice a year)   23
   3.4   Unit inspection                                 14
                                                                      2.4.2	Major maintenance inspection (once a year)    24
   3.5	Filter bag inspection and rejuvenation           14
                                                                      2.4.3	Major maintenance: sediment removal and
   3.5.1 Clogged filters                                 14                 cartridge replacement (and emergency)         24
   3.5.2 Damaged filters                                 15          2.4.4	Related maintenance activities
   3.6   Disposal of material                            15                 (performed on an as-needed basis)             26
   4.1   Spill procedures                                16          2.5	Typical equipment required for
   4.2   Blockages                                       16               maintenance activities                          26
Emergency procedures                                     16          2.6      Material Disposal                           27
                                                                  Next steps                                               30


[OCR of page images]
Device details

Location of Device

 

GPS Coord N:

D P Number:

 

Relevant Council

 

 

 

 

Company
Contact Email Ph
Engineer
Contact Email Ph

 

SFEP Treatment

 

 

Frequency of Inspection/Maintenance

Inspections
(time/year)

Major
Maintenance

 

 

 

StormFilter
EnviroPod

Contents

Treatment Train Specifications 2

Introduction 4
Why cleaning and maintenance are so vitally important 4

Health and safety 5
24 Personnel health and safety 6
2.2 Traffic control 7
2.3. Confined spaces 7
34 Maintenance and monitoring of EnviroPod filters 8

Operations 8
3.2 Stormwater pit cover removal 9
3.2.1 Hinged pit grates 9
3.2.2 Non-hinged pit grates 10
3.3. Cleaning methods a
3.3.1. Cleaning using an inductor truck a
3.3.2 Hand maintenance an]
3.4 Unit inspection 14
3.5 — Filter bag inspection and rejuvenation 14
3.5.1 Clogged filters 14
3.5.2 Damaged filters 15
3.6 Disposal of material 15
4A Spill procedures 16
4.2 Blockages 16

Emergency procedures 16

Maintenance Estimated Annual Cost

StormFilter

 

EnviroPod

 

TOTAL

 

The Stormwater Management StormFilter

14
1.2
1.24
1.2.2

Description
Operation
Purpose
Sizing

StormFilter overview

1.2.3
1.2.4
1.2.5

Basic function
Priming system function
Maintenance overview

StormFilter maintenance and
performance expectations

24
2.2
2.24
2.2.2
2.3
24
244
2.4.2
2.4.3

2.4.4

2.5

2.6

Types of maintenance
Maintenance activities
Maintenance activity timing
Maintenance activity frequency
Maintenance crew requirements
Maintenance methods

Minor maintenance/inspection (twice a year)
Major maintenance inspection (once a year)
Major maintenance: sediment removal and

cartridge replacement (and emergency)
Related maintenance activities
(performed on an as-needed basis)

Typical equipment required for
maintenance activities

Material Disposal

Next steps

Page 49

Maintaining the EnviroPod                                     ®



Stormwater Gully Pit Insert



Maintenance is as integral to every stormwater management
system as it is to any other item of machinery or equipment.

The primary purpose of the EnviroPod® Stormwater Gully Pit
insert is to filter out and remove pollutants from entering
our waterways. To ensure that the EnviroPod® continues
to function effectively, it is important that the pollutants
it captures are periodically removed, and the filtration
components properly cleaned.

Maintenance requirements and frequency are dependent
on the pollutant load characteristics of each site, as well
as the occurrence of events such as chemical spills or
excessive sediment loading due to site erosion or extreme
storms. Similarly, the system should be inspected after all
major storm events.




                                                                  Stormwater360 Operations and maintenance   1

Page 50

Treatment Train
Specifications

                                                                  Regardless of the system type, the media filtration system
Performance Specification                                         shall consist of the following components;

The stormwater filtration treatment train shall consist           •   Inlet energy dissipation
of         x 200 micron gully pit basket/s and        x           •   Cartridge section
460/690mm passive, siphon-actuated, radial flow, self             •   Outlet section to bypass storm flows and convey
cleaning media filtration cartridge system/s operating at a           treated stormwater
specific flow rate of not more than 1.5L/s/m2.
                                                                  •   Access Lids in roof slab for access to Cartridges
                                                                  •   Siphon actuated cartridges filled with proprietary
The gully pit basket system shall consist of the
                                                                      ZPG™ filter media
following components;
                                                                  •   Specific flow rate of each individual cartridge limited
•   Removable 200 micron Nylon monofilament Precision
                                                                      not to exceed 1.5L/s/m2
    woven Filtration Bag
                                                                  •   Air Lock Cap complete with one way Air Valve Flap
•   Fixed Galvanised Mesh Cage (no greater than 80mm x
                                                                  •   Outer Hood complete with Scrubbing Regulators
    80mm) around the Filtration Bag
                                                                  •   Automated high-energy turbulence on the screen face
•   Recycled modified ABS plastic to seal the unit into the pit
                                                                      (only) at the end of storm flows to flush pollutants from
•   By-pass mechanism above the Filter with no moving parts
                                                                      the cartridge
•   System rigidly fixed to the walls of the pit.
                                                                  •   Centre Drainage Tube complete with Buoyancy Float
The media filtration system shall be located within the           •   Individual Cartridge Flow Restrictor Disc
following structure.
                                                                  •   ¼ Turn Bayonet Fittings
•   Manhole                                                       •   Under drain manifold to convey treated stormwater to
•   DownPipe                                                          the receiving environment.
•   Linear
•   Vault
•   Large Box
•   Detention.




2   Stormwater360 Operations and maintenance

Page 51

Components of any
proposes treatment
train or technology

The components of any proposed the treatment train                Maintenance Overview
or technology, including a gully pit basket upstream
of a radial flow cartridge filtration system, must                The primary purpose of the Stormwater Treatment Train is to
be evaluated for a range of pollutants and these                  filter out and prevent pollutants from entering our waterways.
                                                                  Like any effective filtration system, periodically these
performance expectations must comply with current
                                                                  pollutants must be removed to restore the system to its full
best practice guidelines, i.e. Water by Design "MUSIC             efficiency and effectiveness.
Modeling Guidelines version 1.0 2010" for South
East Queensland.
                                                                          aintenance requirements and frequency are
                                                                         M
In short, the performance evaluation of any system                       dependent on the pollutant load characteristics
must show:                                                               of each site. Maintenance must be performed
                                                                         in accordance with the Treatment Trains
 1   Any reduction efficiencies are justified by rigorous
                                                                         Operation and Maintenance Guidelines.
     scientific testing as determined by an independent
     peer reviewer and the results further peer reviewed and
     published in a credible scientific journal. Any potential
     or perceived conflicts of interest should be disclosed
     within the published article.

 2   Published article providing insight into the pollutant
     composition (e.g. soluble vs particulate for nitrogen)
     and the mean concentration of inflow and outflow to
     compare to local and or regional conditions.

 3   Performance evaluation undertaken in dry weather
     conditions or a method to take into account any
     potential leaching of nutrients that may occur in
     the system(s).

 4   Evaluation is conducted using full-scale systems
     with details of treatable flow rates sampled and how
     they correlate to discrete removal efficiencies and
     comparisons to the designed treatable flow rates of
     the device. A comparison should also be made to the
     climatic conditions especially where un-restricted filters
     are used.




                                                                                        Stormwater360 Operations and maintenance   3

Page 52

Introduction

This manual has been designed to assist you with cleaning
and maintaining the EnviroPod Stormwater Gully Pit Insert,
                                                             Why cleaning and maintenance are
using the methods recommended by the manufacturer.           so vitally important
The cleaning process and methods described cover all
aspects of the system, including:                            Adhering to the inspection and maintenance schedule of
                                                             each stormwater treatment device is essential to ensuring
•   Removing the grate
                                                             that it works properly throughout its estimated design life.
•   Cleaning the filter bag
                                                             During each inspection and clean, details of the mass,
•   Inspecting the unit
                                                             volume and type of material that has been collected
•   Rejuvenating the filter bag                              by the device should be recorded. This data will assist
•   Re-installing the filter bags.                           with the revision of future management plans and help
                                                             determine maintenance interval frequency. It’s also
The manual should be used in conjunction with your
                                                             essential that qualified and experienced personnel carry
site’s traffic management and safety plans, as well as
                                                             out all maintenance (including inspections, recording and
other appropriate Stormwater360 (IES) documents such
                                                             reporting) in a systematic manner. To ensure consistency, we
as the IES Employee Health and Safety Manual. We also
                                                             recommend that one person be responsible for overseeing
recommend that maintenance and cleaning contractors, or
                                                             the management of the maintenance and cleaning process.
device owners, develop their own site-specific health and
safety activity plans to ensure a safe work environment.     Maintenance of your stormwater management system is
                                                             essential to ensuring ongoing at-source control of stormwater
                                                             pollution. Maintenance also helps prevent structural failures
         Please note: This manual consists primarily of     (e.g. prevents blocked outlets) and aesthetic failures (e.g.
          the processes and tasks associated with the        debris build up).
          hand maintenance and inductor maintenance
          procedures. It does not include details of the
          site’s traffic management or occupational health
          and safety requirements. Contractors or IES
          staff should utilise their own Employee Health
          and Safety Manual, which details the policies
          and procedures for safe work.




4   Stormwater360 Operations and maintenance

Page 53

Health and safety

The EnviroPod has been designed to trap and
retain pollutants in stormwater runoff, helping              he procedures indicated in the Operations
                                                            T
                                                            section of this manual are recommended as the
to maintain the quality of water entering our
                                                            safest and most efficient manner of conducting
aquatic ecosystems. Depending on the nature                 the maintenance of EnviroPod units (Section 2),
of your site, pollutants can range from organic             however contractors and cleaning staff may
material such as leaves and sticks through to               vary the procedure in response to the site
                                                            conditions; varying work practices; or general
debris such as broken glass, syringes or other
                                                            preferences in the cleaning techniques. Please
potentially harmful materials.                              note that procedures outlined in this manual
                                                            are not exhaustive, and that any changes
Access to gully pits containing EnviroPods may              made should always comply with general safe
require removing heavy protective grates,                   work practices.

while cleaning such pits may entail working in
confined spaces. For these reasons, all aspects
                                                     Cleaning of EnviroPod filters and StormFilters is a specialist
of maintaining and cleaning your EnviroPod
                                                     activity. The material collected by the devices can be
require careful adherence to Occupational            harmful, and needs to be handled correctly. For example,
Health and Safety (OH&S) guidelines. Doing so        sediments may contain heavy metals and carcinogenic
will ensure that all maintenance personnel are       substances as well as harmful objects such as broken
                                                     glass and syringes. It is essential that Occupational Safety
adequately protected and have been properly
                                                     and Health guidelines are followed at all times, and that the
trained before taking part in any specialist         following steps are carried out to ensure safe and successful
activities. The same level of care needs to be       maintenance operations.
taken to protect non-work personnel in and           In addition to the dangers associated with the cleaning and
around the site, while appropriate traffic control   handling of material in the filter bags, precaution needs
measures must be put in place where collection       to be taken with activities such as removing the grate as
pits are situated in, or adjacent to, roadways or    well as with managing the traffic, pedestrians and other non-
                                                     worker personnel at the site. The general workplace hazards
car parks.                                           associated with working outdoors also need to be taken
                                                     into account..




                                                                           Stormwater360 Operations and maintenance   5

Page 54

2.1	Personnel health and safety
All contractors and staff must comply with all current             While cleaning and maintaining filters, all relevant precautions
workplace health and safety legislation and take all practicable   must be taken to prevent contact with sediment and litter.
steps to:                                                          This includes wearing the following personal protective and
                                                                   safety equipment:
•   Comply with all applicable laws, regulations and standards
•   Ensure that all employees, contractors and visitors are        •   Puncture resistant gloves
    informed of and understand their obligations in respect of     •   Steel capped safety boots
    current workplace health and safety legislation                •   Fluorescent safety vest
•   Ensure that employees understand and accept their              •   Overalls or similar skin protection
    responsibility to practice and promote a safe and healthy
                                                                   •   Safety apron (if necessary)*
    work environment.
                                                                   •   Eye protection (if necessary)*.

                                                                   * Higher personal safety conditions may be required when maintaining units
          ake proper care. Pollutants can range from
         T                                                           that may contain more hazardous material, for example pits where syringes
                                                                     have been observed or pits located in areas associated with such activities.
         organic materials such as leaves and sticks
         through to debris such as broken glass,
         syringes or other potentially harmful materials.




6   Stormwater360 Operations and maintenance

Page 55

2.2 Traffic control                                                 2.3 Confined spaces
Stormwater collection pits are typically situated either in or on   Confined space entry procedures are not included as part
roads and car parks, or adjacent to roads in a footpath or swale.   of this manual. For IES employees these procedures are
Traffic control requirements across all such locations differ       included as part of the IES Safety Manual. It is recommended
with most of the state and local road authorities requiring the     that all contractors evaluate their own needs for confined
same controls to be implemented whether the work is to be           space entry and compliance with Occupational Health and
conducted on the road or on the road reserve.                       Safety regulations.

As traffic requirements differ depending on road usage and          When repairs or maintenance activities cannot be conducted
the specific road configuration, separate traffic control plans     from the surface, and there is a need to enter and work in a
should be prepared for each site. Given that maintenance is         confined space, only staff with current confined space training
typically a quick process, the contractor should liaise with the    are permitted to operate in a confined space. Appropriate
relevant road authority to determine the specific road safety       measures and controls must be put in place to meet confined
requirements for each location to ensure that on site workers       space entry requirements. At all times the necessary
can conduct the cleaning operations safely and efficiently,         safety equipment must be worn, and where gas or oxygen
while complying with all laws and regulations.                      hazards occur, only staff trained in its use will use breathing
                                                                    apparatus gear. Non-trained staff must not go into
State government publications such as the NSW RMS
                                                                    confined spaces.
Traffic Control at Work Sites safety manual outline the
signage requirements, placement of barricades or witches hats
and the positioning of traffic control personnel that’s required
when working on public roads. For increased safety, IES                     onfined spaces pose a serious safety hazard
                                                                           C
recommends that the maintenance vehicle be used to shield                  for all personnel; however during the normal
the work area from oncoming traffic.                                       maintenance procedures there should be no
                                                                           reason to enter a confined space and all
Photo 1 shows the maintenance vehicle with cones placed                    maintenance procedures are able to be
around and positioned to shield the work area. Photo 2 shows               conducted from the surface.
the head-on view, note the vehicle is positioned to allow
access to the drive, whilst still blocking the pit from on-coming
traffic. The vehicle has a flashing light on the roof and the
hazard lights switched on.




 Photo 1 Vehicle positioned near pit, preventing traffic from        Photo 2 Head-on view, indicating the placement of the
 passing close to the pit.                                           vehicle near the pit.




                                                                                          Stormwater360 Operations and maintenance   7

Page 56

Operations

 nviroPod units need to be regularly inspected
E                                                        This section outlines the procedures for cleaning the
                                                         EnviroPod units. It has been written so that someone who
to determine whether they require maintenance
                                                         has never previously encountered a stormwater pit or an
or cleaning. This process involves several steps,        EnviroPod unit can carry out such maintenance by simply
and may require two or more maintenance                  following the outlined steps.
personnel working together, as well the use of
specialised equipment such as a hydraulic lifting
arm or an inductor truck with a vacuum hose.             3.1	Maintenance and monitoring of
                                                              EnviroPod filters
As gully pit grates are usually quite heavy, it is
important that correct lifting procedures are adopted,   To ensure that each EnviroPod unit achieves optimal
                                                         performance, the material collected by the filter bag should
and that the area surrounding the opened pit is
                                                         be emptied when the level of material is no more than
shielded from access to non-work personnel.              approximately half to two thirds of the total bag depth or
                                                         when there is evidence of material overflow. While the bag has
If inspection reveals that the filter bag needs to be    a greater storage capacity, it is recommended that it is not left
emptied and rejuvenated, the entire unit should also     to fill completely prior to emptying, for the following reasons:

be examined to ensure that all connections and joints    •   the bags are capable of retaining a heavy mass of material
are sound. Any material that has accumulated in the          (in excess of 50kg), which will make them more difficult to
                                                             lift and empty
overflow diversion channels or outlet pipes also needs
                                                         •   material near the top of the bag can be re-suspended
to be removed, with those areas then being flushed.
                                                             during high to extreme rainfall events
Where required, filter bags may need to be cleaned
                                                         •   blockage of the overflow sections can occur, when
or repaired, and all waste material must be disposed         material is allowed to build up above the filter bag.
of according to local guidelines at either an approved
                                                         It is also recommended that additional monitoring is
disposal site or transfer station.                       conducted following moderate to extreme rainfall events,
                                                         especially when preceding months have had little or no
                                                         rainfall. This increased frequency of monitoring is necessary
                                                         as there is a greater accumulation of surface contamination
                                                         during low rainfall periods, which will then enter the unit with
                                                         the higher volumes of runoff generated during a major rainfall
                                                         event. It is also important to ensure that the units have not
                                                         been damaged due to high pipe velocities.




8   Stormwater360 Operations and maintenance

Page 57

3.2 Stormwater pit cover removal
3.2.1 Hinged pit grates

These are the steps for opening a hinged pit grate:
                                                                       Please note: Many cast iron hinges are not hinged
 1   Insert the lifting hooks beneath the grate.
                                                                        securely (to enable the removal of the grate). This
     (Position indicated in Photo 3)
                                                                        may result in the pit grate not being able to sit in an
 2   Check hinge point is not damaged and debris is not                 open position. Additionally the hinge pins may also
     caught in the hinge area.                                          be damaged or corroded, which may allow the
                                                                        grate to fall into the pit. Such pit grates can be
3    Fully open pit grate, ensuring that the grate will stay in
                                                                        removed using the method indicated below for
     the open position without any external forces applied.
                                                                        non-hinged grates.
     Grates that do not remain open without being held
     should be removed or secured during cleaning or
     maintenance activities. Photo 4 indicates the grate being
     opened and grate resting freely in the open position,
     respectively.




 Photo 3 Lifting the grate                                        Photo 4 Fully open grate




 Photo 5 Lowering grate



                                                                                       Stormwater360 Operations and maintenance   9

Page 58

3.2.2 Non-hinged pit grates
To remove a non-hinged pit grate:

 1    Place lifting hooks beneath grate, where possible in the
      four corners of the grate (see Photo 6). Concrete lids
      may have Gatic lifting points, a key arrangement or holes
      in the lid, which may require special equipment such as
      Gatic lifters

 2    Position each person either side of the grate
      (see Photo 7)

 3    Lift the grate, ensuring that good heavy lifting posture is
      used at all times

 4    Place the grate on an angle on the gutter, to allow for the
      lifting hooks to be removed (see Photo 8)
                                                                     Photo 6 Insert hook near edge of grate
 5    For extremely heavy one-piece grates and concrete Gatic
      covers, insert the lifters in place and slide the lids back.
      Note some lids may still require two people




 Photo 7 Position each lifter either side of the grate               Photo 8 Lift grate and move grate to one side




 Photo 9 Lift grate above the support frame                          Photo 10 Reinstated non hinged grate




10   Stormwater360 Operations and Maintenance

Page 59

3.3 Cleaning methods
One of the following maintenance methods should be used for servicing EnviroPod Filters:


3.3.1 Cleaning using an inductor truck                                3.3.2 Hand maintenance

Follow these steps to safely and efficiently clean the                To clean the EnviroPod manually by hand, follow
EnviroPod using an inductor truck:                                    these steps:

 1   Open gully pit (See Section 3.2)                                  1   Open gully pit (See Section 1)

 2   Place the inductor hose over the material collected in the       2    Place the lifting hooks in the lifting loops of the filter bag
     filter bag and switch on the inductor                                 (See Photo 12)

 3   Using the inductor hose, suck out all of the sediment,           3    For extremely heavy and overfilled bags either use a
     organic leaf material, litter etc. collected in the filter bag        hydraulic lifting arm to lift the bag, or remove excess
                                                                           material using a shovel or similar piece of equipment.
 4   Allow the filter bag to be sucked up into the inductor
                                                                           IES prefers the use of a post hole shovel, due to the
     hose for a few seconds to allow for the filter mesh
                                                                           reduced strain on the back when digging and the ability
     pores to be cleaned. Care is to be taken that there are
                                                                           of the shovel to grab material vertically
     no sharp edges on the inductor hose that can damage
     the filter bag                                                   4    Lift the bag vertically off the supporting frame, ensuring
                                                                           that no undue pressure is placed on the filter bag.
 5   If material has built up around the overflows, use the
                                                                           (See Photo 13)
     inductor hose to clear the accumulated material
                                                                      5    Lift the bag clear of the stormwater pit (See Photo 14)
 6   Remove filter bag from the pit
                                                                      6    Position the bag over the truck or other collection
 7   Sediment retained in the gully pit grate is to be removed
                                                                           vehicle, taking hold of the loops at the base of the bag
 8   Back-opening channels are to be cleared of any debris                 (See Photo 15 and Photo 16)
     to ensure flow is not hindered. This debris can also be
                                                                       7   Lift and empty the filter bag by holding the bottom
     collected using the inductor truck
                                                                           lifting loops only (See Photo 17)
 9   All gully pit waste is to be removed from the pit
                                                                      8    Completely empty the filter bag (See Photo 18)
10   Check the EnviroPod unit (Section 3.4)
                                                                      9    Brush the filter bag with a stiff brush to remove bound
11   Check filter bag (Section 3.4)                                        sediment from the filter pores
12   Reinstate filter bag and gully pit lids                          10   Check the EnviroPod unit (Section 3.4)

                                                                      11   Check the filter bag (Section 3.5)

                                                                      12   Reinstate filter bag, ensuring bag is installed the correct
                                                                           way (See Photo 19 and Photo 20)

                                                                      13   Reinstate gully pit lids (See Photo 21 and Photo 22)




 Photo 11 Cleaning an EnviroPod using the inductor method




                                                                                            Stormwater360 Operations and Maintenance   11

Page 60

 Photo 12 Place the lifting hooks through the bag loops   Photo 13 Lift the bag from the cage and support frame




 Photo 14 Lift the bag from the stormwater pit            Photo 15 Lift the bag onto the collection vehicle




 Photo 16 Grab the bottom lifting loops                   Photo 17 Lifting the bottom bag loops empty the filter bag




12   Stormwater360 Operations and maintenance

Page 61

Photo 18 Completely empty the contents of the filter bag   Photo 19 Reinstall filter bag




Photo 20 Ensure that the unit is positioned correctly,     Photo 21 Correctly installed filter bag
with the lifting loops on the inside



                                                                 Please note: Under no circumstances are
                                                                 gully pit sediments to be backwashed into
                                                                 the gully pit.




Photo 22 Installed filter bag and sealed pit




                                                                               Stormwater360 Operations and maintenance   13

Page 62

    Photo 23 Check seals are pushed against the pit walls           Photo 24 Check joining rivets (two piece unit shown above)




3.4 Unit inspection                                             3.5	Filter bag inspection
After the EnviroPod filter bag has been removed, emptied
                                                                     and rejuvenation
and cleaned, the following should be checked to ensure that
the unit has not been damaged:                                  After the filter bags have been emptied and cleaned, they
                                                                should be inspected to evaluate their condition. Given the
•    All connections and joints should be checked and broken    nature of stormwater, the filter bag may become considerably
     rivets replaced (See Photo 23)                             clogged with fine sediment or damaged by various objects
•    The plastic pit seals should be inspected for unit         in stormwater as well as fauna. Sharp material such as sticks,
     movement or damage (See Photo 24)                          combined with high velocity water and a large mass in the
•    The cage should be inspected for damage or movement.       filter bag, can cause small tears in the filter material. Animals
                                                                such as rats have also been known to chew through fine mesh
The overflow diversion channels, and the area between the
                                                                filter bags located in gully pits near takeaway food outlets.
EnviroPod cage and pit wall should also be inspected for any
accumulated debris. Any observed debris should be removed
and disposed of off-site. Accumulated material within the       3.5.1 Clogged filters
outlet pipe may also need to be flushed.
                                                                Clogged filter bags can be cleaned using several different
If spare parts are required, Stormwater360 is able to provide   methods. If the techniques described in the general
these at a cost to the owner of the EnviroPod unit, although    maintenance sections above do not adequately clean the filter
these parts may also be obtained from other suppliers.          bags, the following options should be considered:

                                                                •    Using a stiff brush and a bucket of soapy water, scrub the
                                                                     filter bag surface.
          Please note: If the units are not cleaned
                                                                •    Remove filter bags from the pit and wash the bags using a
           regularly, the mobilisation of material collected
                                                                     high pressure water spray, taking care not to transfer the
           in the EnviroPod unit may occur. As such,
                                                                     contamination elsewhere. Wastewater from the process
           cleaning of the units in accordance with this
                                                                     should be collected and disposed of correctly.
           management plan is required. As this plan is
           based on observations and data collected             •    Remove the filter bags from the pits and the support rings
           during the monitoring period, ongoing                     and wash the bags in an industrial washing machine.
           adjustment of the cleaning frequency is              This final option typically results in the bags appearing
           generally required to improve the overall            like new, with no visible stain or pore clogging within the
           efficiency in the removal of collected material      filter mesh.
           and prevent material overflow.




14    Stormwater360 Operations and maintenance

Page 63

 Photo 25 Slightly clogged filter bag, indicated by the brown         Photo 26 A clean used filter bag
 stain on in the centre of the bag


3.5.2 Damaged filters                                                3.6 Disposal of material
Damaged filter bags can often be repaired, provided the              All gully pit wastes are to be taken off site and disposed
damage is small. Small tears in the fabric may occur due to          of at a transfer station or similar approved disposal site.
several reasons, however the overall strength and structure          Stormwater sediments can contain lead, copper, zinc,
of the nylon fabric typically prevents small tears becoming          mercury, hydrocarbons and PCBs, which are harmful to
much larger. Although the bag is unlikely to tear further, care      both humans and the receiving environment. Appropriate
must be used when cleaning torn bags so as not to spill the          sampling and laboratory analysis may be required to
collected material into the pit.                                     classify the material as suitable for reuse, or disposal under
Small tears may be repaired by either sewing the tear back           appropriate local guidelines.
together with additional fabric to increase the strength of the
stitching, or by sewing a patch of the filter material onto the
filter bag. If large tears are present, the filter bag may need to
be replaced as it is no longer able to function as intended.




                                                                                           Stormwater360 Operations and maintenance   15

Page 64

Emergency procedures

Spills and blockages can have an immediate impact on          4.2 Blockages
the performance of a stormwater management system,
and can potentially result in serious damage to built         In the unlikely event of surface flooding around a gully pit
infrastructure as well as the surrounding waterways           fitted with an EnviroPod the following steps should be
                                                              carried out:
and wetlands.
                                                               1   Check EnviroPod overflow bypass. The EnviroPod filter
                                                                   has been designed with an overflow mechanism built
In these types of emergencies, it is important to act
                                                                   into the filter box. If surface flooding still exists, check
quickly to remediate the problem by removing affected              the overflow slots underneath the rubber seal. If debris
sediment or clearing the cause of the blockage, so                 is lodged in the overflow slots it can be easily cleared by
that the system can resume normal and effective                    hand or a steel rod.
functioning as soon as possible.                               2   If overflow is clear and surface flooding still exists remove
                                                                   EnviroPod and check outlet pipe for blockages.

                                                                   Removal of the EnviroPod may be difficult if the filter is
4.1 Spill procedures                                           3
                                                                   clogged and the EnviroPod is holding water. If the filter
                                                                   is clogged, brush the sidewalls of the filter with a yard
In the event of a spill discharging into any gully pit, all        broom or similar. This will dislodge particles trapped
sediment is to be extracted and the filter bags are to             at the interface allowing contained water to flow
be removed and replaced with rejuvenated filter bags.              through the filter.
Normal operation procedures apply to additional cleaning
as a result of spills.                                         4   If the outlet pipe is blocked, it is likely that a gully
                                                                   sucker truck will be required to unblock it. Debris
                                                                   should be removed from the EnviroPod with the gully
                                                                   sucker truck before removal of the EnviroPod filter. If
                                                                   a gully sucker truck is not available and the EnviroPod
                                                                   needs to be removed by hand, follow the steps below:
                                                               a   Remove excess debris by hand or brush the side
                                                                   of the filter.

                                                               b   Lift and place filter ring through the filter box and
                                                                   into cage.

                                                               c   Remove Filter box.

                                                               d   Lift cage containing filter bag and ring out of the pit.

                                                               e   Unblock outlet pipe.




16   Stormwater360 Operations and maintenance

Page 65

The Stormwater
Management StormFilter
                                                         ®




For almost two decades the Stormwater Management
StormFilter ® has helped meet the most stringent stormwater
quality requirements.

The system has been continually tested and refined, to
ensure it achieves maximum reliability and performance.

As a best management practice (BMP) system, it removes the
most challenging target pollutants – including fine solids,
soluble heavy metals, oils and total nutrients (including
soluble) – by using a variety of media to achieve site-specific
pollutant removal objectives.




                                                                  Stormwater360 Operations and maintenance   17

Page 66

StormFilter overview              ®




1.1 Description                                                      1.2.2 Sizing

                                                                     The StormFilter is typically sized to meet design water quality
StormFilter is a passive, flow-through stormwater filtration
                                                                     objectives, which are subject to legislation regulated by local
system consisting of vaults that house rechargeable
                                                                     government authorities and other relevant environmental
cartridges filled with a variety of filter media, and is installed
                                                                     bodies. MUSIC modelling software is used to determine
in-line with storm drains. The StormFilter works by passing
                                                                     pollutant loads from a site, influenced by a number of factors
stormwater through media-filled cartridges, which trap
                                                                     such as site area, imperviousness and land use. Pollutant
particulates and adsorb materials such as dissolved metals
                                                                     load reduction capabilities, based on third party testing,
and hydrocarbons. After being filtered through the media,
                                                                     allows the number of StormFilter cartridges required to
the treated stormwater flows into a collection pipe or
                                                                     achieve the relevant objectives to be established. Cartridges
discharges into an open channel drainage way. StormFilter
                                                                     are designed to treat a peak flow between 0.7 and 1.6 litres/
is offered in three different configurations: cast-in-place,
                                                                     second, depending on the cartridge size used. For example,
precast and linear. The precast and linear models utilise
                                                                     10 standard sized cartridges (460mm) are able to treat 11
pre-manufactured vaults. The cast-in-place units are
                                                                     L/s, as each filter can treat 1.1 L/s.
customised for larger flows and may be either covered or
uncovered underground units.                                         Because of the highly porous nature of the granular filter
                                                                     media, the flow through a newly installed cartridge is restricted
                                                                     to 1 L/s (average 460mm), using a restrictor disc, to ensure
1.2 Operation                                                        adequate pollutant-media contact time.




1.2.1 Purpose

The StormFilter is a passive stormwater filtration system
designed to improve the quality of stormwater runoff from
the urban environment before it enters receiving waterways.

Through independent third party studies, it has been
demonstrated that the StormFilter is highly effective for
treatment of first flush flows, and fast-paced flows, during
the latter part of a storm. In general, StormFilter’s efficiency
is highest when pollutant concentrations are highest.
The primary target pollutants for removal are: sediments
(TSS), soluble metals, soluble phosphorus, nitrates, and
oil and grease.

                                                                      Photo 27 Filter cartridge




18   Stormwater360 Operations and maintenance

Page 67

1.2.3 Basic function                                               1.2.5 Maintenance overview

The StormFilter is designed to siphon stormwater runoff            The primary purpose of the StormFilter is to filter out and
through a filter cartridge containing media. The variety of        prevent pollutants from entering our waterways. Like any
media available can be designed to act as a mechanical             effective filtration system, these pollutants must be removed
filter to remove sediments, as an ion exchanger to remove          periodically to restore the StormFilter to its full efficiency and
dissolved heavy metals, and as an absorber to remove oils          effectiveness. Maintenance requirements and frequency are
and greases.                                                       dependent on the pollutant load characteristics of each site.
                                                                   To assist the owner with maintenance issues, Stormwater360
                                                                   provides detailed Operation and Maintenance Guidelines with
1.2.4 Priming system function
                                                                   each unit.

The treated stormwater collects in the centre tube of the          Stormwater360 can provide maintenance services completely,
cartridge, which is equipped with a self-priming siphon            or in part. Available services include tracking of installed
system. (Figure 1 illustrates this system.) The key component      systems, advising the system’s owner of maintenance needs,
of the system is the plastic float, consisting of a ball located   and notification of the regulatory agency once the system has
at the base leading up to a larger portion, which provides         been maintained.
increased buoyancy. Initially the ball rests in a seat,
                                                                   Maintenance is usually performed in the dryer periods
effectively closing off the port to the drainage manifold.
                                                                   to rejuvenate the filter media and prepare the system for
As a result, the filter fills the centre drainage tube until the   the next rainy period. Maintenance activities can also
water level has risen high enough to purge the air from the        be required in the event of a chemical spill or excessive
filter cartridges and displaces the float. At a water depth of     sediment loading due to site erosion or extreme storms.
22 inches the float pulls loose and allows the filtered water      It is good practice to inspect the system after severe
to drain out through the manifold. This effectively “primes”       storm events.
a siphon within the drainage tube and greatly increases the
potential across the filter. The priming system increases
StormFilter’s ability to be loaded with sediment. A related                      AIR LOCK CAP WITH CHECK VALVE
                                                                                                                               LIFTING TAB

feature is the cartridge “hood”. This hood maintains the                                                                            FLOAT VALVE

siphon effect by preventing air from being drawn into the
cartridge until the external water level drops below the                                                                                 OUTER MESH
                                                                              FILTER MEDIA
bottom of the hood.
                                                                                                                                               HOOD
                                                                           CENTER TUBE
Cartridges are connected to the manifold with a plastic
                                                                        SCRUBBING REGULATOR
connector. These can be either quarter turn connectors or in
the older systems, threaded connectors.                                     UNFILTERED WATER

                                                                                                                                             UNFILTERED WATER
StormFilter is also equipped with flow spreaders that trap            UNDER- DRAIN
                                                                                                                                                   FILTERED WATER
                                                                      MANIFOLD
floating debris and surface films, even during overflow
conditions. Depending on individual site characteristics,                   FILTERED
                                                                             WATER
some systems are equipped with high and/or low flow
bypasses. High flow bypasses are installed when the                                                              UNDER-DRAIN MANIFOLD
                                                                                                                                               VAULT FLOOR
                                                                                                                 CAST INTO VAULT FLOOR
calculated peak storm event generates a flow that
overcomes the overflow capacity of the system. This is              Figure 1 Filter cartridge
especially important for precast systems. Low flow bypasses
are sometimes installed to bypass continuous inflows
caused by ground water seepage, which usually do not
require treatment. All StormFilter units are designed with
an overflow. The overflow operates when the inflow rate is
greater than the infiltration capacity of the filter media.




                                                                                                        Stormwater360 Operations and maintenance                    19

Page 68

StormFilter maintenance          ®



and performance
expectations

To ensure the optimal and ongoing performance of the      While some maintenance activities can be completed
                                                          by hand, others require specialised equipment such as
StormFilter, the system requires systematic inspection,
                                                          an inductor truck with a vacuum hose. In all cases, it is
cleaning and maintenance. This maintenance                important that maintenance staff are properly trained
regime falls into two categories – ongoing minor          in the functioning of the StormFilter system and have a
inspection and maintenance, and major cleaning and        good knowledge of the correct procedures for disposing
                                                          contaminated sediment as well as the methods for removing
maintenance. The maintenance frequency is largely
                                                          and installing StormFilter media cartridges.
determined by the conditions of each site, and the
                                                          At all times, appropriate safety equipment must be used, and
amount of sedimentation in the stormwater runoff
                                                          Occupational Health And Safety (OH&S) guidelines adhered to.
that flows through the system. Unexpected events
such as chemical spills, erosion or extreme storm
activity require immediate inspection of the system,
together with removal of debris or contaminated
sediment, and where appropriate, replacement of the
media cartridges.




20   Stormwater360 Operations and maintenance

Page 69

2.1 Types of maintenance
Presently, procedures have been developed for two levels               Inspection/minor maintenance typically involves opening
of maintenance:                                                        the flow restricting valves (to pre-set levels) and cleaning up
                                                                       vegetation and debris. Major maintenance typically includes
•    Inspection and/or minor maintenance
                                                                       cartridge recharging. Major maintenance may involve disposal
•    Major maintenance.                                                of materials that require consideration of regulatory guidelines.
Inspection/minor maintenance activities are combined since             Depending on the particular unit configuration and equipment
the minor maintenance does not require special equipment               used, major maintenance may require an understanding
and typically little or no materials are in need of disposal.          of OSHA rules. Table 1 summarises the primary activities
                                                                       associated with StormFilter maintenance.


Table 1: StormFilter

    Facility component          Maintenance activity        When maintenance                         Expected facility performance
    requiring maintenance                                   activity is required                     after maintaining

    StormFilter cartridges      Litter and                  Floatable objects or other litter        Permanent removal from
    and containment structure   debris removal              is present in the filter. Remove         storm system.
                                                            to avoid hindrance of filtration
                                                            and eliminate unsightly debris
                                                            and litter.

    StormFilter cartridges      Cartridge replacement       Media has been contaminated              New media is able to effectively
    and containment structure   and sediment removal        by high levels of pollutants,            treat stormwater.
                                                            such as after a spill.

    Drainage system piping      Flushing with water         Drainage system is obstructed            Outflow is not restricted.
                                                            by debris or sediment.




                                                                                                Stormwater360 Operations and maintenance   21

Page 70

2.2 Maintenance activities                                                 2.2.2 Maintenance activity frequency

                                                                           The primary factor controlling timing of maintenance for the
                                                                           StormFilter is sedimentation. A properly functioning system
2.2.1 Maintenance activity timing                                          will remove solids from water by trapping these particulates
                                                                           within the porous structure of the media. The flow through
Two scheduled inspections/maintenance activities should take
                                                                           the system will naturally decrease as more and more solids
place during the year. During the minor maintenance activities
                                                                           are trapped. Eventually the flow through a system will be
(routine inspection, debris removal), the type of major
                                                                           low enough to require replacement of the cartridges. Sediment
maintenance required is determined and, if required for
                                                                           should be removed from upstream trapping devices on an
disposal, samples of the sediments and media are obtained.
                                                                           as-needed basis to prevent material from being re-suspended
The next scheduled date is to perform major maintenance                    and discharged to the system.
activities (replacement of the filter cartridges and associated
                                                                           Site conditions greatly influence maintenance requirements.
sediment removal). In addition to the scheduled activities, it
                                                                           StormFilter units located in areas with erosion or active
is important to check the condition of the filter after major
                                                                           construction should be inspected and maintained more
storms to check for damage caused by high flows and to
                                                                           often than those in fully established areas. The maintenance
check for high sediment accumulation, which may be caused
                                                                           frequency may be adjusted as additional monitoring
by localised erosion in the drainage area. It may be necessary
                                                                           information becomes available during the inspection program.
to adjust maintenance activity scheduling depending on the
                                                                           Areas that develop known problems should be inspected
actual operating conditions encountered by the system.
                                                                           more frequently than areas that demonstrate no problems,
                                                                           particularly after large storms. Ultimately, inspection and
                                                                           maintenance activities should be scheduled based on the
                                                                           historic records and characteristics of an individual filter.



2.3 Maintenance crew requirements
Table 2 lists the anticipated crew requirements for                        applicable occupational health and safety (OH&S) and disposal
maintenance operations. Removal of water and sediments                     regulations should be followed. A general description of the
during major maintenance activities can be accomplished                    maintenance activities follows.
using either a pump and water truck or a vacuum truck. All


Table 2 Anticipated Crew Requirements

                                               Inspection/Minor       Major Maintenance:          Major Maintenance:
                                               Maintenance            Sediment Removal            Cartridge Replacement

  Labourer                                     1                                                  1

  Skilled Worker                               1                      1                           1

  Vacuum/Water Truck Operator                                         1                           0/1

  Total                                        2*                     2*                          2/3*

  Special Requirements                         Knowledge of Proper    Knowledge of                Knowledge of Cartridge Removal
                                               StormFilter Function   Disposal Requirements       and Installation Procedures

* May require OH&S trained person if/when vault entry occurs.




22   Stormwater360 Operations and maintenance

Page 71

2.4 Maintenance methods

2.4.1	Minor maintenance/inspection (twice a year)

Minor maintenance typically will involve the steps below, however if it appears that a spill of some type has occurred, the local hazard
control agency and Stormwater360 should be notified immediately.


Steps for Minor Maintenance/Inspection

 1   Maintenance to be performed by a skilled worker familiar            6    Take notes about the external and internal condition. This
     with StormFilter units.                                                  includes inspecting pit penetrations, walls, lids, ladders
                                                                              and grates etc.
 2   If applicable, set up safety equipment to protect
     pedestrians from fall hazards presented by open access              7    Give particular attention to recording the level of
     covers. Also set up appropriate safety equipment for                     sediment build-up on the floor of the vault and on top
     work near roadways.                                                      of the internal components. If flow is occurring, note the
                                                                              level of water and estimate the flow rate per drainage
 3   Inspect the external condition of the unit and take notes
                                                                              pipe. Record all observations.
     concerning defects/problems.
                                                                         8    Remove large loose debris and litter using a pole with a
 4   Open the access covers to the vault and allow the system
                                                                              grapple or net on the end.
     to air out for 5-10 minutes.
                                                                         9    Close and fasten the access cover, and remove
 5   Without entering the vault, inspect the inside of the
                                                                              safety equipment.
     unit, including components.
                                                                         10   Finally, make notes about the local drainage area relative
                                                                              to ongoing construction, erosion problems, or high
                                                                              loadings of other materials to the system.



                                                                                In the case of a spill, workers should abort
                                                                                 maintenance activities until the proper guidance
                                                                                 has been obtained.




                                                                                              Stormwater360 Operations and maintenance   23

Page 72

2.4.2	Major maintenance inspection                                2.4.3	Major maintenance: sediment
      (once a year)                                                      removal and cartridge replacement
                                                                         (and emergency)
The primary goal of the major maintenance inspection is
to assess the condition of the cartridges relative to the          Major maintenance/filter cartridge replacement typically
level of sediment loading. It may be desirable to conduct          involves the steps below. However, if it appears that a spill
this inspection during a storm to observe the relative flow        of some type has occurred, the local hazard control agency
through the filter cartridges. If the submerged cartridges         and Stormwater360 should be notified immediately. In the
are severely plugged, large amounts of sediments should            case of a spill, the worker should abort maintenance
be present and very little flow will be discharging from           activities until the proper guidance has been obtained.
the drainage pipes. It is likely that the cartridges need to
                                                                   Depending on the configuration of the particular system, a
be replaced. Major maintenance inspection will typically
                                                                   worker may be required to enter the vault to perform some
involve the steps below. However, if it appears that a spill of
                                                                   tasks. If vault entry is required, OH&S rules for general
some type has occurred, the local hazard control agency
                                                                   confined space entry must be strictly adhered to. Filter
and Stormwater360 should be notified immediately. In the
                                                                   cartridge replacement should occur during dry weather
case of a spill, the worker should abort maintenance
                                                                   and it may be necessary to plug the filter inlet pipe if base
activities until the proper guidance has been obtained.
                                                                   flows exist. Standing water present in the vault should be
Steps for Pre-Major Maintenance Inspection                         regarded as polluted and contained during this operation by
                                                                   temporarily capping the manifold connectors.
 1    Maintenance to be performed by a skilled worker
      familiar with StormFilter units.

 2    If applicable, set up safety equipment to protect
                                                                          Please note: Confined space entry may be
      pedestrians from fall hazards presented by open
                                                                           required on StormFilter systems. In this case,
      doors. Also, set up appropriate safety equipment for
                                                                           please ensure that appropriate Confined Space
      work near roadways.
                                                                           entry training and subsequent certification has
 3    Inspect the external condition of the unit and take                  been undertaken and is valid, and work
      notes concerning defects/problems.                                   procedures are strictly adhered to. If you are
                                                                           unsure, do not enter the vault and contact
 4    Open the access covers to the vault and allow the vault to
                                                                           Stormwater360 immediately.
      air out for 5-10 minutes.

 5    Without entering the vault, give the inside of the unit,
      including components, a general condition inspection.

 6    Take notes about the external and internal condition.

 7    Give particular attention to recording the level of
      sediment build-up on the floor of the vault, and on top
      of the internal components.

 8    Remove large loose debris and litter using a pole with a
      grapple or net on the end.

 9    If the visit is during a storm, make the flow observations
      discussed above.

10    Close and fasten the access cover, and remove
      safety equipment.

11    Make notes about the local drainage area relative to
      ongoing construction, erosion problems, or high loading
      of other materials to the system.

12    Review the condition reports from the previous
      minor and major maintenance visits and schedule for
      cartridge replacement if needed.




24   Stormwater360 Operations and maintenance

Page 73

Steps For Cartridge Replacement Maintenance

1    Depending on the particular unit, one or two utility         14   Using the appropriate lifting cap, attach the cable and
     workers and a hauling truck operator will deliver                 remove the cartridge (up to 10kgs. each) from the
     the replacement cartridges to the site. Information               vault. It is strictly prohibited to have personnel standing
     concerning how to obtain the replacement cartridges is            under suspended cartridges. Care must also be used
     available from Stormwater360.                                     to avoid damaging the cartridges during removal
                                                                       and installation. The cost of repairing components
2    If applicable, set up safety equipment to protect
                                                                       damaged during maintenance will be the responsibility
     pedestrians from fall hazards presented by open
                                                                       of the owner unless Stormwater360 is performing
     doors. Also, set up appropriate safety equipment for
                                                                       maintenance activities and damage is not related to
     work near roadways.
                                                                       discharges to the system.
3    Inspect the external condition of the unit and take
                                                                  15   Set the used cartridge aside or load onto the
     notes concerning defects/problems.
                                                                       hauling truck.
4    Open the doors to the vault and allow the system to air
                                                                  16   Repeat steps 14 to 15 until all cartridges have
     out for 5-10 minutes.
                                                                       been removed.
5    Without entering the vault, give the inside of the unit,
                                                                  17   Remove deposited sediment from the floor of the vault.
     including components, a general condition inspection.
                                                                       This can be accomplished by using the vacuum truck
6    Make notes about the external and internal condition.
                                                                  18   Once the sediments are removed, it is necessary
7    Give particular attention to recording the level of               to assess the condition of the vault, particularly
     sediment build-up on the floor of the vault and on top            the manifold and the connectors. These are short
     of the internal components.                                       sections of 2-inch schedule 50 PVC, or threaded
     Ensuring safe working procedures are met, off load the            schedule 80 PVC that should protrude above the floor
8
     replacement cartridges (16-39kgs each) and set aside.             of the vault. If required, apply a light coating of FDA
                                                                       approved silicon grease to the outside of the exposed
9    Remove the top cap (threaded), upper seal and                     portion of the connectors. This ensures a watertight
     float from the cartridge. Repeat procedure for every              connection between the cartridge and the drainage
     cartridge within StormFilter vault. Place items in a large        pipe. Replace any damaged connectors.
     plastic container to be lifted form the vault.
                                                                  19   Using the boom, crane, or tripod, lower and install
10   Using a cordless drill and 8mm hex head, remove                   the new cartridges (typically 30kg for standard
     the three screws located around the top perimeter of              460 cartridges). Once again, take care not to
     the cartridge hood. Place screws in the large plastic             damage connectors.
     container and, once full or completed, remove plastic
     container from vault.                                        20   Close and fasten the access cover, and remove
                                                                       safety equipment.
11   Move the vacuum truck near the StormFilter vault
     on the down-wind side. Be sure that the truck is not         21   Make notes about the local drainage area relative
     too close to the vault so that fumes will not enter the           to ongoing construction, erosion problems, or high
     vault. Make sure that the last 500mm of the nozzle is             loadings of other materials to the system.
     approximately 100-125mm in outside diameter.                 22   Finally, dispose of the residual materials in accordance
     Feed vacuum nozzle into cartridge bay and start                   with applicable regulations. Make arrangements to
12
     vacuum truck. Remove cartridge hood and place                     return the used cartridges to Stormwater360.
     nozzle directly onto filter media. Completely remove
     media from each cartridge and repeat process for
     every cartridge in vault.

13   Once completed disconnect cartridges from vault floor
     and place hood back on cartridges




                                                                                        Stormwater360 Operations and maintenance   25

Page 74

2.4.4	Related maintenance activities (performed on an as-needed basis)

StormFilter units are often just one of many components in                            components be properly maintained. The maintenance/
a more comprehensive stormwater drainage and treatment                                repair of upstream facilities should be carried out prior to
system. The entire system may include catch basins, detention                         StormFilter maintenance activities. In addition to considering
vaults, sedimentation vaults and manholes, detention/                                 upstream facilities, it is also important to correct any problems
retention ponds, swales, artificial wetlands, and other                               identified in the drainage area. Drainage area concerns may
miscellaneous components. In order for maintenance of the                             include: erosion problems, heavy oil and grease loading, and
StormFilter to be successful, it is imperative that all other                         discharges of inappropriate materials.



2.5 Typical equipment required for maintenance activities
Typical equipment required for conducting maintenance is                              with available labour and equipment resources may desire
shown in Table 3. Some of the materials listed are suggestions                        to use alternative methods. However, it is advisable that
rather than requirements. It should be noted that there                               guidance from Stormwater360 be obtained prior to using
is more than one way to accomplish some tasks. Owners                                 alternative techniques.


Table 3 Maintenance Equipment Requirements

  Maintenance equipment required

  Minor maintenance                          Pre-major maintenance inspection                   Major maintenance cartridge replacement

  •   Safety equipment*: First aid,          •   Safety equipment*: First aid,                  •   Safety equipment*: First aid, cones, barricades,
      cones, barricades, flagging,               cones, barricades, flagging, flares,               flagging, flares, tape, vests, hard hats
      flares, tape, vests, hard hats             tape, vests, hard hats                         •   Work clothes: Rubber boots, overalls, and gloves
  •   Work clothes: Rubber                   •   Work clothes: Rubber boots,                    •   Door bolt, wrench, Pentasocket and
      boots, overalls, and gloves                overalls, and gloves                               miscellaneous Tools
  •   Door bolt, wrench,                     •   Door bolt, wrench, proprietary                 •   Tape measure
      proprietary lifters (e.g. Gatic)           lifters (e.g. Gatic) and
                                                                                                •   Flashlight
      and miscellaneous Tools                    miscellaneous Tools
                                                                                                •   Grapple or net pole
  •   Tape measure                           •   Tape measure
                                                                                                •   Record keeping forms
  •   Flashlight                             •   Flashlight
                                                                                                •   Vacuum truck
  •   Grapple or net pole                    •   Grapple or net pole
                                                                                                •   Replacement cartridges
  •   Record keeping forms                   •   Record keeping forms
                                                                                                •   Cartridge hauling truck
  •   Litter/debris container                •   Litter/debris container
                                                                                                •   Crane, tripod and hoist, or other lifting device
                                                                                                    (150kg minimum capacity)
                                                                                                •   Shovels
                                                                                                •   Extra 50mm PVC cartridge connectors
                                                                                                •   Spare flow restrictor discs
                                                                                                •   Litter/debris container
                                                                                                •   Vault inlet pipe plug
                                                                                                •   Dolly
                                                                                                •   PVC Pipe cutter
                                                                                                •   Ladder
                                                                                                •   Cartridge installation and removal sling

*Confined space equipment may be required for vault entry. This equipment must be used by personnel with the appropriate OH&S training. This equipment typically
  includes: Atmospheric testing devices, atmospheric purging and ventilating devices, and entry, exit, and rescue assisting devices.




26    Stormwater360 Operations and maintenance

Page 75

2.6 Material Disposal
The accumulated sediment found in stormwater treatment
and conveyance systems must be handled and disposed of
in a manner that will not allow the material to affect surface
or ground water. It is possible for sediments to contain
measurable concentrations of heavy metals and organic
chemicals (such as pesticides and petroleum products). Areas
with the greatest potential for high pollutant loading include
industrial areas and heavily travelled roads. Sediments and
water must be disposed of in accordance with all applicable
waste disposal regulations.

It is not appropriate to discharge these materials back to
the stormwater drainage system. Part of arranging for
maintenance to occur should include coordination of disposal
of solids (landfill coordination) and liquids (municipal vacuum
truck decant facility, local wastewater treatment plant,
on-site treatment and discharge). Owners should contact
the local public works department and inquire about how
the department disposes of their street waste residuals.
Stormwater360 will determine disposal methods or reuse of
the media contained in the cartridges. If the material has been
contaminated with any unusual substance, the cost of special
handling and disposal will be the responsibility of the owner.




                                                                  Stormwater360 Operations and maintenance   27

Page 76

                                                                                                    A U S T R A L I A




SFEP StormFilter & Enviropod
Maintenance Data Sheet

Date:                                        Location:                                   GPS COORD:

System size:                                 Type:       Cast-in-place       Precast     Linear

Number of Cartridges:                        Type of Cartridge:      460mm           690mm        310mm

Filter Media:     ZPG         Perlite

Type of EnviroPods:                                                                      Number of EnviroPods:

Personnel:


STORMFILTER SYSTEM OBSERVATIONS
Last service:

Sediment Depth on Vault Floor:

Structural Damage:

Cartridges submerged:       Yes         No           How deep:
Comments:

ENVIROPOD SYSTEM OBSERVATIONS
Last service:

Amount of Sediment in Basket:

Structural Damage:

Comments:

DRAINAGE AREA REPORT
Excessive Oil and Grease Loading              Yes        No       Source:

Sediment Accumulation on Pavement             Yes        No       Source:

Erosion of Landscaped Areas                   Yes        No       Source:
Comments:




STORMFILTER CARTRIDGE MAINTENANCE ACTIVITIES
Remove Litter and Debris                      Yes        No       Details:

Sediment Removed from Vault Floor             Yes        No       Details:
Quantity of Sediment Removed (estimate?):

Replace Cartridges                            Yes        No       Details:

Minor Structural Repairs                      Yes        No       Details:
Residuals (debris, sediment) Disposal Methods:

Notes/Problems:

ENVIROPOD MAINTENANCE ACTIVITIES
Number of Bags Replaced:                     Clogged EnviroPods/Bags:          Yes      No

Comments:

Page 77

                                                                                                      A U S T R A L I A




SFEP Treatment Train
Inspection Data Sheet
It may be desirable to conduct this inspection during a storm to observe the relative flow through the filter cartridges. If the sub-
merged cartridges are severely plugged, large amounts of sediments should be present, very little flow will be discharging from the
drainage pipes, and it is likely that the cartridges need to be replaced during major maintenance.


 Date:                                        Location:                                    GPS COORD:

 System size:                                 Type:       Cast-in-place      Precast       Linear

 Number of Cartridges:                        Type of Cartridge:      460mm         690mm           310mm

 Filter Media:      ZPG        Perlite

 Type of EnviroPods:                                                                       Number of EnviroPods:

 Personnel Attending Inspection:


 STORMFILTER SYSTEM OBSERVATIONS
 Last service:

 Sediment Depth on Vault Floor:

 Structural Damage:

 Cartridges submerged:        Yes        No           How deep:
 Comments:

 ENVIROPOD SYSTEM OBSERVATIONS
 Last service:

 Amount of Sediment in Basket:

 Structural Damage:

 Comments:

 DRAINAGE AREA REPORT
 Excessive Oil and Grease Loading              Yes        No       Source:

 Sediment Accumulation on Pavement             Yes        No       Source:

 Erosion of Landscaped Areas                   Yes        No       Source:
 Comments:

Page 78

Next steps
Learn more
For more detailed technical information about
Stormwater360 products and solutions, visit
www.stormwater360.com.au


Connect with us
With more than 12 years experience in developing,
installing and maintaining innovative and efficient
site-specific stormwater management solutions,
Stormwater360’s highly qualified engineers and
consultants can assist you with every aspect of your
stormwater project.

Whether it’s an initial in-house technical presentation,
a request to inspect and clean your existing facility,
or assistance with designing a specific stormwater
management solution for your site, simply complete
the enquiry form at stormwater360.com.au or call
1300 354 722 to speak to a Stormwater360 consultant.


Start a project
If you are ready to begin a project, our engineering
team will provide you with everything you need,
from a free preliminary design to MUSIC modelling,
CAD drawings to maintenance frequency and
associated costs schedules. To find out more, simply
visit www.stormwater360.com.au/custom-solutions
and complete the Design Information Request form.

Page 79

©2013 Stormwater360 Australia

Nothing in this catalogue should be construed as an expressed warranty or an implied warranty of merchantability or fitness for any particular purpose.
See the Stormwater360 Australia standard quotation or acknowledgement for applicable warranties and other terms and conditions of sale.

The product(s) described may be protected by one or more of the following US, Australian and New Zealand patents: 5,322,629; 5,624,576; 5,707,527; 5,759,415;
5,788,848; 5,985,157; 6,027,639; 6,350,374; 6,406,218; 6,641,720; 6,511,595; 6,649,048; 6,991,114; 6,998,038; 7,186,058; 705,778; 711,957; 326,257; 332,517;
780521; 336761; 299114 or other patents pending.

Stormwater Management StormFilter is a licensed trademark of Stormwater360 Australia.

Page 80

Stormwater360 supplies and maintains
a complete range of filtration,
hydrodynamic separation, screening and
oil/water separation technologies.



Call 1300 354 722




www.stormwater360.com.au

Page 81

            LAMBERT & REHBEIN
              ENGINEERS • MANAGERS • SCIENTISTS




            APPENDIX H
EROSION AND SEDIMENT CONTROL CODE

Page 82

office



EROSION AND SEDIMENT CONTROL CODE


 SPECIFIC OUTCOMES                    PROBABLE SOLUTIONS                        RESPONSE

 14.125 Effects of works

 Erosion and sediment control         S1.1

 O1                                   Site disturbance is limited to building   Erosion and sediment control
                                      areas, their surrounds and other use      measures will be implemented during
 Development minimises erosion and    areas;                                    construction.
 transport of sediments off-site.
                                      AND                                       Details will be provided at the
                                                                                detailed design phase.
                                      S1.2

                                      Sediment barriers are provided
                                      throughout and downslope of
                                      disturbed areas to prevent sediment
                                      washing into gutters, drains and
                                      watercourses either on or off the site;

                                      AND

                                      S1.3

                                      All stockpiles including sand, soil or
                                      building materials are within the
                                      premises and contained within
                                      individual sediment barriers;

                                      AND

                                      S1.4

                                      Sediment basins are provided where
                                      the site contains fine or dispersive
                                      soils;

                                      OR

                                      S1.5

                                      A stormwater catchpit incorporating a
                                      stormwater catchpit protection device
                                      is installed so that all runoff from
                                      disturbed areas flows to the catchpit;

                                      AND

                                      S1.6 For buildings,

                                     (a) temporary or permanent
                                         downpipes are connected to the
                                         stormwater system before laying




                                                         i

Page 83

office



 SPECIFIC OUTCOMES                PROBABLE SOLUTIONS                       RESPONSE

                                     the roof; or
                                 (b) localised erosion is avoided by
                                     directing flow from downpipes
                                     over non-erosive areas.
 Stormwater runoff                S2.1                                     Erosion and sediment control
                                                                           measures will be implemented during
 O2                               Diversion drains or bunds are            construction.
                                  designed and constructed to drain
 Stormwater is diverted around    upstream run-off around the              Details will be provided at the
 disturbed areas.                 disturbed site;                          detailed design phase.

                                  AND

                                  S2.2 Discharge from the diversion
                                  drains do not cause run-off impacts
                                  to other properties;

                                  OR

                                  S2.3

                                  Alternative methods, as described in
                                  the Institution of Engineers Australia
                                  (Queensland Division) Soil Erosion
                                  and Sediment Control - Guidelines
                                  for Queensland Construction Sites,
                                  are used.




                                                    ii

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.