Original source · versioned page text
8. Volume 5 - Stormwater Management Plan
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn LAMBERT & REHBEIN
ENGINEERS • MANAGERS • SCIENTISTS
TABLE OF CONTENTS
1.0 INTRODUCTION 1
2.0 SITE DESCRIPTION 2
3.0 STORMWATER QUANTITY 3
3.1 METHODOLOGY 3
3.2 STORM EVENTS 3
3.3 PRE DEVELOPMENT SCENARIO 4
3.4 POST DEVELOPMENT SCENARIO 5
3.5 DETENTION REQUIREMENTS 8
4.0 STORMWATER QUALITY 10
4.1 STORMWATER QUALITY OBJECTIVES 10
4.2 POTENTIAL WATER QUALITY IMPACTS 10
4.3 STORMWATER QUALITY ASSESSMENT 11
4.4 SELECTION OF STORMWATER TREATMENT TRAIN 15
4.5 STORMWATER QUALITY MODELLING RESULTS 16
5.0 MAINTENANCE 17
5.1 STORMWATER360 ENVIROPODS AND MECHANICAL FILTRATION SYSTEM 17
6.0 CONCLUSIONS AND RECOMMENDATIONS 18
Ref: B16239CR002 - i - Stormwater Management Plan
Noosa Energy Centre - Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.