8. Volume 5 - Stormwater Management Plan

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                             LAMBERT & REHBEIN
                                               ENGINEERS • MANAGERS • SCIENTISTS


                           Table 5 Post Development Peak Flow Rates
  ARI (Years)       Rational Method (m3/s)   XPStorm (m3/s)      Difference (m3/s)     Difference (%)

      Q1                    0.061                0.080               + 0.019                + 31%

      Q2                    0.083                0.103               + 0.020                + 24%

      Q5                    0.114                0.129               + 0.015                + 13%

      Q10                   0.132                0.143               + 0.011                + 8%

      Q20                   0.158                0.164               + 0.006                + 4%

      Q50                   0.196                0.178               - 0.018                 - 9%

     Q100                   0.216                0.199               - 0.017                 - 8%


The order of magnitude of the XPStorm Model results correlate reasonably well for all intensity
events when compared with the rational method calculations.

Table 6 below compares the XPStorm model results of the pre development peak flows and the
post development unmitigated peak flows.
                         Table 6 XPStorm Peak Flow Rates Comparison
                    XPStorm Post Development        XPStorm Pre            Increase         Increase
  ARI (Years)
                        Unmitigated (m3/s)       Development (m3/s)          (m3/s)            (%)

      Q1                      0.080                      0.047             + 0.033           + 70%

      Q2                      0.103                      0.079             + 0.024           + 30%

      Q5                      0.129                      0.112             + 0.017           + 15%

      Q10                     0.143                      0.128             + 0.015           + 12%

      Q20                     0.164                      0.150             + 0.014            + 9%

      Q50                     0.178                      0.162             + 0.016           + 10%

     Q100                     0.199                      0.180             + 0.019           + 11%




 Ref: B16239CR002                                        - 7 -                           Stormwater Management Plan
                                                                                      Noosa Energy Centre - Noosaville
Log in to download the original file

8. Volume 5 - Stormwater Management Plan.pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.