Table 5 Post Development Peak Flow Rates
ARI (Years) Rational Method (m3/s) XPStorm (m3/s) Difference (m3/s) Difference (%)
Q1 0.061 0.080 + 0.019 + 31%
Q2 0.083 0.103 + 0.020 + 24%
Q5 0.114 0.129 + 0.015 + 13%
Q10 0.132 0.143 + 0.011 + 8%
Q20 0.158 0.164 + 0.006 + 4%
Q50 0.196 0.178 - 0.018 - 9%
Q100 0.216 0.199 - 0.017 - 8%
The order of magnitude of the XPStorm Model results correlate reasonably well for all intensity
events when compared with the rational method calculations.
Table 6 below compares the XPStorm model results of the pre development peak flows and the
post development unmitigated peak flows.
Table 6 XPStorm Peak Flow Rates Comparison
XPStorm Post Development XPStorm Pre Increase Increase
ARI (Years)
Unmitigated (m3/s) Development (m3/s) (m3/s) (%)
Q1 0.080 0.047 + 0.033 + 70%
Q2 0.103 0.079 + 0.024 + 30%
Q5 0.129 0.112 + 0.017 + 15%
Q10 0.143 0.128 + 0.015 + 12%
Q20 0.164 0.150 + 0.014 + 9%
Q50 0.178 0.162 + 0.016 + 10%
Q100 0.199 0.180 + 0.019 + 11%
Ref: B16239CR002 - 7 - Stormwater Management Plan
Noosa Energy Centre - Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.