Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                           LAMBERT & REHBEIN
                                             ENGINEERS • MANAGERS • SCIENTISTS


                           Table 4 Post Development XPStorm Inputs
                    Item                    Value      Units          Source / Comment

 IFD Chart                                  Noosa       N/A         Bureau of Meteorology

 IFD Coefficients                           Noosa       N/A         Bureau of Meteorology

 Zone                                         3         N/A        AR&R, Volume 1, Book 2

 Impervious Initial Loss / Continuing        1/0        mm         AR&R, Volume 1, Book 5
 Loss *

 Pervious Initial Loss / Continuing Loss    10 / 1      mm         AR&R, Volume 1, Book 5
 *

 Impervious Catchment Mannings              0.013       N/A          Roof and Pavement

 Pervious Catchment Mannings                 0.03       N/A           Landscaping/Grass

 Total Impervious Catchment Area           0.2227       ha             Site Layout Plan

 Total Pervious Catchment Area             0.0201       ha             Site Layout Plan

 Impervious Vectored Slope                   1.0        %              Site Layout Plan

 Pervious Vectored Slope                     1.0        %              Site Layout Plan

* The Initial and Continuing Loss models are within the specified AR&R ranges and have been
calibrated to the results obtained from rational method calculations.

The post development XPStorm model was calibrated using the rational method. Table 5 overleaf
shows the results of the hydrological modelling and the rational method calculations. For further
details, the XPStorm outputs are enclosed in Appendix D and the rational method calculations
are enclosed in Appendix E.




 Ref: B16239CR002                                       - 6 -                      Stormwater Management Plan
                                                                                Noosa Energy Centre - Noosaville
Log in to download the original file

8. Volume 5 - Stormwater Management Plan.pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.