8. Volume 5 - Stormwater Management Plan

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                             LAMBERT & REHBEIN
                                                 ENGINEERS • MANAGERS • SCIENTISTS


4.4     SELECTION OF STORMWATER TREATMENT TRAIN
As detailed in Section 3, site runoff from Catchment A will be directed to the proposed detention
tank for attenuation. Catchment B will bypass the detention structure.

It is proposed to treat site runoff via a series of filter baskets within gully pits and filter cartridges
incorporated in the detention tank, as such, it is proposed to treat runoff from Catchment A and
Catchment B will bypass treatment.

Stormwater360, a manufacturer and supplier of mechanical filtration systems, were engaged to
size and model appropriate systems for the proposed development. The filter cartridges proposed
use the PSorb filter media, an alternative to the ZPG stormfilter. Stormwater 360 confirms that the
PSorb option requires less cartidges however this system is subject to Noosa Council approval.

The proposed treatment train requires runoff from the Catchment A road areas and paved and
landscaped areas to be pre-treated with Enviropods fitted to gully pits prior to discharging to the
detention tank for treatment via the filter cartridges. The roof areas of Catchment A will be
conveyed directly to the detention tank for treatment. Refer to MUSIC Model in Appendix F.

It should be noted, that an approved equivalent mechanical filtration system may be utilised
based on price or availability at the time of construction.

Refer to Table 15 below for the stormwater quality treatment details and the civil engineering
plans attached in Appendix C, for the conceptual treatment device locations.

The use of the filter cartridge’s is subject to Noosa Council approval.



                     Table 15 Stormwater Quality Treatment Device Details
         Treatment Device Adopted                                         Details
Catchment A
Stormwater360 EnviroPod (EP) Filter             • 2 x EnviroPod Series 200 filter fitted to stormwater
                                                  inlet pits;
Stormwater360 StormFilter                       • 4-cartridge (690mm PSorb) StormFilter system - a
                                                  passive, siphon-actuated, radial flow, self-cleaning
                                                  media filtration cartridges.




 Ref: B16239CR002                                           - 15 -                         Stormwater Management Plan
                                                                                        Noosa Energy Centre - Noosaville
Log in to download the original file

8. Volume 5 - Stormwater Management Plan.pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.