8. Volume 5 - Stormwater Management Plan

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                               LAMBERT & REHBEIN
                                                    ENGINEERS • MANAGERS • SCIENTISTS


4.5      STORMWATER QUALITY MODELLING RESULTS
The predicted MUSIC pollutant concentrations are provided in Table 16.
                                    Table 16 MUSIC Model Results
                                   Initial Pollutant    Residual Pollutant Water Quality     Reduction
                                    Concentration        Concentration      Objectives       Achieved
Total Suspended Solids (TSS)           965 kg/yr            165 kg/yr          80%             82.9%
  Total Phosphorous (TP)               1.84 kg/yr          0.645 kg/yr         60%             64.9%
      Total Nitrogen (TN)               11 kg/yr            6.05 kg/yr         45%              45%
   Gross Pollutants (GP)               75.6 kg/yr           5.08 kg/yr         90%             93.3%
(Refer to Appendix C for MUSIC Model Output Details).

As shown in Table 16, MUSIC predicts that the proposed treatment train will meet the SEQ
Regional Plan Implementation Guideline No.7 for Water Sensitive Urban Design water quality
objectives for key pollutants including TSS, TP, TN and GP. Copies of the model outputs are also
attached in Appendix F.




  Ref: B16239CR002                                            - 16 -                     Stormwater Management Plan
                                                                                      Noosa Energy Centre - Noosaville
Log in to download the original file

8. Volume 5 - Stormwater Management Plan.pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.