3.0 STORMWATER QUANTITY
3.1 METHODOLOGY
In order to determine the stormwater flows for the site an XPStorm model of the catchments was
developed. The development layout utilised in the modelling is as shown on the preliminary
architectural plans prepared by Thomson Adsett enclosed in Appendix B. A breakdown of the
existing and proposed catchments is presented in Table 1 below.
Table 1 Development Catchment Area
PRE DEVELOPMENT POST DEVELOPMENT
CATCHMENT A CATCHMENT B
IMPERVIOUS 990 m2 2086 m2 140 m2
PERVIOUS 1438 m2 102 m2 100 m2
TOTAL 2428 m2 2188 m2 240 m2
The impervious area of the site will increase due to the increased roof and pavement areas
compared with the existing pre development surfaces. As such there is likely to be an increase in
stormwater runoff from the developed site. Noosa Council requires that existing levels of
stormwater discharge are maintained from the proposed development site. The stormwater
detention, if required will be designed to attenuate peak flows for all design storms up to and
including a Q100 storm.
3.2 STORM EVENTS
Q1, Q2, Q5, Q10, Q20, Q50 and Q100 were modelled for the following durations:
• STORM 1 - 10 minutes; • STORM 5 – 60 minutes;
• STORM 2 - 15 minutes; • STORM 6 – 90 minutes; and
• STORM 3 - 30 minutes • STORM 7 – 120 minutes.
• STORM 4 – 45 minutes;
The above storms can be related to the output hydrographs presented in Appendices D & E.
Ref: B16239CR002 - 3 - Stormwater Management Plan
Noosa Energy Centre - Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.