8. Volume 5 - Stormwater Management Plan

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                         LAMBERT & REHBEIN
                                             ENGINEERS • MANAGERS • SCIENTISTS



3.0     STORMWATER QUANTITY

3.1     METHODOLOGY
In order to determine the stormwater flows for the site an XPStorm model of the catchments was
developed. The development layout utilised in the modelling is as shown on the preliminary
architectural plans prepared by Thomson Adsett enclosed in Appendix B. A breakdown of the
existing and proposed catchments is presented in Table 1 below.
                            Table 1 Development Catchment Area
                    PRE DEVELOPMENT                       POST DEVELOPMENT
                                               CATCHMENT A                  CATCHMENT B
IMPERVIOUS               990 m2                     2086 m2                       140 m2
PERVIOUS                1438 m2                     102 m2                        100 m2
    TOTAL               2428 m2                     2188 m2                       240 m2


The impervious area of the site will increase due to the increased roof and pavement areas
compared with the existing pre development surfaces. As such there is likely to be an increase in
stormwater runoff from the developed site. Noosa Council requires that existing levels of
stormwater discharge are maintained from the proposed development site. The stormwater
detention, if required will be designed to attenuate peak flows for all design storms up to and
including a Q100 storm.

3.2     STORM EVENTS
Q1, Q2, Q5, Q10, Q20, Q50 and Q100 were modelled for the following durations:

•       STORM 1 - 10 minutes;                       •         STORM 5 – 60 minutes;
•       STORM 2 - 15 minutes;                       •         STORM 6 – 90 minutes; and
•       STORM 3 - 30 minutes                        •         STORM 7 – 120 minutes.
•       STORM 4 – 45 minutes;
The above storms can be related to the output hydrographs presented in Appendices D & E.




 Ref: B16239CR002                           - 3 -                          Stormwater Management Plan
                                                                        Noosa Energy Centre - Noosaville
Log in to download the original file

8. Volume 5 - Stormwater Management Plan.pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.