8. Volume 5 - Stormwater Management Plan

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                            LAMBERT & REHBEIN
                                              ENGINEERS • MANAGERS • SCIENTISTS


3.3     PRE DEVELOPMENT SCENARIO
Table 2 below outlines the calculations, methodology and inputs used to undertake the pre
development hydrologic modelling in XPStorm.
                           Table 2 Pre Development XPStorm Inputs
                    Item                       Value        Units      Source / Comment

IFD Chart                                      Noosa         N/A     Bureau of Meteorology

IFD Coefficients                               Noosa         N/A     Bureau of Meteorology

Zone                                              3          N/A    AR&R, Volume 1, Book 2

Impervious Initial Loss / Continuing Loss *    2.5 / 0       mm     AR&R, Volume 1, Book 5

Pervious Initial Loss / Continuing Loss *      20 / 2.5      mm     AR&R, Volume 1, Book 5

Impervious Catchment Mannings                   0.015        N/A       Roof and Pavement

Pervious Catchment Mannings                     0.035        N/A             Grass

Impervious Catchment Area                      0.0990         ha    Contour and Detail Survey

Pervious Catchment Area                        0.1438         ha    Contour and Detail Survey

Vectored Slope Impervious                        0.5          %           Survey Plans

Vectored Slope Pervious                           7           %           Survey Plans

* The Initial and Continuing Loss models are within the specified Australian Rainfall and Runoff
(AR&R) ranges and have been calibrated to the results obtained from rational method
calculations.

To check the order of accuracy of the XPStorm model, rational method calculations were
completed for each storm event. The peak event was assumed to be equal to the time of
concentration for the catchment.

Table 3 overleaf shows the results of the hydrological modelling and the rational method
calculations. For further details, the XPStorm outputs are enclosed in Appendix D and the
rational method calculations are enclosed in Appendix E.




 Ref: B16239CR002                                         - 4 -                    Stormwater Management Plan
                                                                                Noosa Energy Centre - Noosaville
Log in to download the original file

8. Volume 5 - Stormwater Management Plan.pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.