8. Volume 5 - Stormwater Management Plan
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnoffice
EROSION AND SEDIMENT CONTROL CODE
SPECIFIC OUTCOMES PROBABLE SOLUTIONS RESPONSE
14.125 Effects of works
Erosion and sediment control S1.1
O1 Site disturbance is limited to building Erosion and sediment control
areas, their surrounds and other use measures will be implemented during
Development minimises erosion and areas; construction.
transport of sediments off-site.
AND Details will be provided at the
detailed design phase.
S1.2
Sediment barriers are provided
throughout and downslope of
disturbed areas to prevent sediment
washing into gutters, drains and
watercourses either on or off the site;
AND
S1.3
All stockpiles including sand, soil or
building materials are within the
premises and contained within
individual sediment barriers;
AND
S1.4
Sediment basins are provided where
the site contains fine or dispersive
soils;
OR
S1.5
A stormwater catchpit incorporating a
stormwater catchpit protection device
is installed so that all runoff from
disturbed areas flows to the catchpit;
AND
S1.6 For buildings,
(a) temporary or permanent
downpipes are connected to the
stormwater system before laying
i
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.