Skip to the record
Accept no imitations.

Original source · versioned page text

8. Volume 5 - Stormwater Management Plan

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
office



EROSION AND SEDIMENT CONTROL CODE


 SPECIFIC OUTCOMES                    PROBABLE SOLUTIONS                        RESPONSE

 14.125 Effects of works

 Erosion and sediment control         S1.1

 O1                                   Site disturbance is limited to building   Erosion and sediment control
                                      areas, their surrounds and other use      measures will be implemented during
 Development minimises erosion and    areas;                                    construction.
 transport of sediments off-site.
                                      AND                                       Details will be provided at the
                                                                                detailed design phase.
                                      S1.2

                                      Sediment barriers are provided
                                      throughout and downslope of
                                      disturbed areas to prevent sediment
                                      washing into gutters, drains and
                                      watercourses either on or off the site;

                                      AND

                                      S1.3

                                      All stockpiles including sand, soil or
                                      building materials are within the
                                      premises and contained within
                                      individual sediment barriers;

                                      AND

                                      S1.4

                                      Sediment basins are provided where
                                      the site contains fine or dispersive
                                      soils;

                                      OR

                                      S1.5

                                      A stormwater catchpit incorporating a
                                      stormwater catchpit protection device
                                      is installed so that all runoff from
                                      disturbed areas flows to the catchpit;

                                      AND

                                      S1.6 For buildings,

                                     (a) temporary or permanent
                                         downpipes are connected to the
                                         stormwater system before laying




                                                         i
Log in to download the original file

8. Volume 5 - Stormwater Management Plan.pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.