Skip to the record
The only place to find full transcripts.

Original source · versioned page text

8. Volume 5 - Stormwater Management Plan

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Traffic Impact Assessment & Stormwater Management Plan (email 3 of 3).

of 83

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
office



 SPECIFIC OUTCOMES                PROBABLE SOLUTIONS                       RESPONSE

                                     the roof; or
                                 (b) localised erosion is avoided by
                                     directing flow from downpipes
                                     over non-erosive areas.
 Stormwater runoff                S2.1                                     Erosion and sediment control
                                                                           measures will be implemented during
 O2                               Diversion drains or bunds are            construction.
                                  designed and constructed to drain
 Stormwater is diverted around    upstream run-off around the              Details will be provided at the
 disturbed areas.                 disturbed site;                          detailed design phase.

                                  AND

                                  S2.2 Discharge from the diversion
                                  drains do not cause run-off impacts
                                  to other properties;

                                  OR

                                  S2.3

                                  Alternative methods, as described in
                                  the Institution of Engineers Australia
                                  (Queensland Division) Soil Erosion
                                  and Sediment Control - Guidelines
                                  for Queensland Construction Sites,
                                  are used.




                                                    ii
Log in to download the original file

8. Volume 5 - Stormwater Management Plan.pdf · 8.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.