GENERAL NOTES:

|. This drawing is preliminary and only to be used to demonstrate the

adequacy of the Hydraulic design for the Car Wash operation only.

Further documentation (during the construction drawing stage) will specify

all pipe sizes, venting, invert levels et...

Do not scale the drawings.

Al works shall be completed by suitably qualified trades people with

current licence and insurance cover.

‘The Plumbing Contractor/Builder is to consult with the Crvil/ Structural

Engineer regards to all excavations & placement of all below ground tanks

& drains to ensure the integrity of the building and the foundations are not

Compromised due to excavation within the zone of influence to any

structure.

All works are to be constructed in accordance with the standard

‘& Water Supply Laws 1998, National Construction Code (BCA), AS 2149,

‘AS 2441, AS 2444, National Plumbing & Drainage Code, AS 3500 Parts

4-4, al other relevant Australian Standards & local laws.

‘The Builder/Contractor is to check interpretation of Bylaws with Counci.

‘The Builder/Contractor isto verify all surface levels, invert levels & cover

over waste drainage lines are correct & obtainable before construction

commences.

8. The locations of any existing services shown on the drawing/s are
approximate only & have not been verified. The Builder/Contractor shall
verify locations of services before commencement of work. The
Builder/Contractor shall not work near these services without personal
supervision or the written permission of the Relevant Authority.

9. All pipes laid underground in landscaped areas are to be a MIN of 400mm
to the invert level & shall be MIN [email protected]. Water service pipework sizes shown as nominal bore. Any altematives
sed must be equal or exceed those shown.

14. The Builder is to ensure that all services Contractors co-ordinate together
before commencing to determine the correct construction sequence.

12. The Contractor is to provide ‘As Constructed’ documents to the
‘Superintendent on completion of the contract.

413. The Contractor shall allow for the supply of all labour, materials & plant

oN

   
   

   
  

 

EM

&.
Existing Bus stop

*

 
    

  
 
    
 
   
  
  
   
     
      

  
 
  
  
 
 
  

 
 
  

4 No. 3,900 Litre MIN Reclaim Pits
S00 ae Race
peepee eerie
other approved cover) gas tight trafficable access covers.

j Al

 

 

    
 
   
 
     

   
      
  

Auto Bay 1

 

Seating Area

     

  

Vac Bay 1

 
   
       
  

 

2,000 Litre
sit Pit AL,

  
     
   
  
    
  
     
    
       
     

   

     
  

   
 
 
    
  
  

  
 

rated core,

 

2

 

 
 
  

   
 
 

 

|
1
V
2 ‘necessary forthe installation, testing & commissioning of the works as
Take ig Aue Beye Vac Bay 2 described on the drawings & in the speciication. The works shal be
Away Eo ooo ti complete with ful alowance forall minor & incidental tems requied
& 11 22000 Cire: though not specifically mentioned or detailed. The Contractor shall also
Sm GREL, allow for all work required to make

‘good.

14, All materials shall be new, proven in service & suitable for the intended
purpose. a

415. Testing & commissioning shall be carried out prior to practical completion
to clearly demonstrate & record that the works efficiently meet the

Outlet

  
 
 
   
  
    
 

  

gate cover,

    
 
 

 
 
      
   

 
   
       

 

 
 
      
  

 

  

 

  
   
   
   
   
  
  
  
  
  
  
     
   

2

1s i , -cified performaces & have been successfully commissioned as a

‘F re j ¢ te sa

Ios re / VaoiBiayas 7 SITE SPECIFIC SEWERAGE NOTES:

12< viper tage , fi 1. The equipment for the treatment of liquid trade waste is to be kept clean
= Auwiater Separator Treatment capacity = and maintained (by ongoing removal of accumulated material from

   
    
  

      

    

     

     
   
  
  
  
  
  
   
 
    

 

Store Room ‘channels, silt traps and coalescing plate packs, and timely removal of
Store Room § wcll. metwosnans ‘er un Ni: 216 este ee ee oe ea
iene, * sued Interceptor Pit by a licensed liquid waste contractor etc) in an efficient

delivers oily waste water from Holding Pit to
above ground mechanical oll water
separaior to be connected to waste oil
container & disconnector gully.

‘Treatment system to be in accordance with
local Council & Water Authority Guidelines.

‘condition to the satisfaction of the Relevant Authority & must not be
‘modified without approval in writing of the Relevant Authority
Spillsleaks should be cleaned up using dry cleaning mé

Al liquid trade waste from the Auto Wash bays shall pass through a
series of Reclaim Pits (4 No. 4,000 L MIN). Effluent water from the
Reclaim Pits is to pass into the PetroV/Oll Interceptor Pit (4.000 L MIN)

 

  
   

  

 

    
   
  
 
 

   
 
 

 
  

We for Trade Waste Discharges.
ne ah Bay 1 \\ Oil/Water Separator to be located ina bbe tren bbe discharged to the sewer property house connection drain
es ars UMS“ =r, 4, Each Dog Wash tub is to have a hair trap installed, The hair trap/s shall

fa eS

i be cleaned on a regular (weekly MIN) basis.

5. Animal droppings, litter, etc. shall nat be disposed of into the sewerage
system.

‘All pumps, reclaim suction lines, conduits, venting, filters ete... are to be

installed as per the Hydraulic Engineers, Manufacturers details & Car

Wash Suppliers specifications. These are all to be specified during the

construction documentation stage.

7. Extension risers for Raciaim Pits or the Petrol/Oil Interceptor Pit shall be
made to fit the unit to the exact depth shall be 300mm MIN high.

8. Itis recommended that back flow prevention devices be installed in

applications that are at risk of having sewerage backing up into them.

   
   
  
   
 
      
 
    
  

 

 
  
 

11,000 Litre MIN
Tobe castunde the paving slab complet wih 2
Nia Cis "ham duty fan (rahe
-pproved cove) gas ight access covers.

 

   
   
  

7

@

   
  

 

 

 

   
   
   
 

LEGEND

wecomcomen = Domestic Sewer Drain

  

Drainage

   
     
     
     
      

 

100mm @ Trade Waste Drain- HDPE

 

 

 
   
  
 
  

Super Bay 1 Recycled Water Pipe
Dog Wash unit
‘complete with hai
trap @ places),

  
   

 
  

2,000 Litre Silt Pit
Si Pit RL Top: 109.60,
Precast concete sit pit conplete
eth HD. gated cover.

Pipe up

9801 1S

 

  

Flow direction

 

pests

    
   
    
  
   

Inspection Opening Surface

Tundish

    

Floor Waste Grate
eo

Drainage = a
Pt =}

 
   
  
      
 
 
   
    
 
 

Retlux Valve

Overflow Relief Gully

 

2,000 Litre Silt Pit:
Sit Pit RL Top: 109.60,
Pra cast concrete st pil compete
wih AO. grated cover,

we0i 1S

  
   
    

Disconnector Gully
Existing surtace levels

Finished surface levels

 

= Authority Sewer Connection Point

  
     
  
 
    
  
     
   

 
   

ig Services shown on.
this plan have been derived SD. 200mm wide x 150mm MIN deep SD

SERVICES LEGEND

   

      
  
 
  

  
 
  
 

either from field survey or plotted ‘Overspray strip drain to drain into ‘Pipe
mts—es—es— Existing Sewer Pipe from records of the vewrant vee

authorities and no guarantee is
ono eso Existing Stormwater Drainage given as to their accuracy. It is ‘Stormwater Drainage Grated Pit, |

 

the responsibilty of the i
contractor to verify on site the Junction Pit & Grated Strip Drain as

location of all services prior to EEETETIN per Givi Eng dwos.
the commencement of works. —

Existing Overhead Power Lines

 

 

 

 

 

 

DIAL BEFORE Existing Water Mains Pipe

YOU DIG

www.1100.com.ou

PRELIMINARY SANITARY DRAINAGE LAYOUT PLAN

SCALE 1: 100

 

—— hen —— Existing Telecom Cables.
==

 

 

 

TMC Building Design Group 2023
Design Copyright

drawings may not be copied in whole
in part without the written consent of TMC
Design Group. Any changes

by the Client, Council or the
Planning Approval Authority shall
reported to TMC Building Design Group
29-9202 | authorisation prior to said changes being

DATE

 
 
 
 
    

 

     
   
    

   
  

 

 
   
    

ISSUED FOR PLANNING APPROVAL

NOT TO BE USED FOR CONSTRUCTION PURPOSES

AT: 34 (LOT 4, 5 & 6) ELM STREET,
COOROY, QLD, 4563

   

PROPOSED CAR WASH +
TAKE AWAY FOOD & DRINK
OUTLET

    
    

   

 
  

    

 

- eee
ee pili ‘
Design MC [Building Design Group

P.O. Box 3494, Mornington, VIC, 3931. Phone No. 0416 114573
Matters
National

“The peak body for the
building design profession

Member

 

Additional On-Site Retantion/Detention Tank added 20-12-2023

 

  

   

    
     

 

    

Additional Reclaim Pit added. STW pits updated.

  
   

1005-2028

         
     

     
 

    
    

FOR: CHRIS KING & JOANNE HILL

Issued For DA Planning Approval

       

     

 

    

       
    
   
    

      

     
      

 

SCALE 1: 100 AT ORIGINAL SIZE
TC 20 Dec 2023 9:35 PM - T:\TMC\2020120-032 Chris King- Cooroy, QLD\20-032 DA Rev F.DWG

Date: DEC 2023 Issue:

no: 20-032 DA

Scale’

 

00

    
   

  
    
    

      
    
 

Drawn:

   
    

T. MICHAELS Destnedt

T. MICHAELS Sheet No: H1 of 1.

 

 

 

 
Log in to download the original file

Council Meeting MCU22-0201.pdf · 19.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.