Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Town Planning Assessment Report.pdf

of 55
                                       development site;
                                   (c) provides 2 in every 10
                                       dwellings as affordable
                                       housing;
                                   (d) provides 1 in every 10
                                       dwellings as social housing.

                                   Editor’s Note -
                                   Affordable housing is housing
                                   that is appropriate to the needs
                                   of households with low to
                                   moderate incomes, if the
                                   members of the households will
                                   spend no more than 30% of
                                   gross income on housing costs.

                                   Social housing is housing made
                                   up of public and community
                                   housing, that is owned and run
                                   by the government or a not for
                                   profit agency (as the provider)
                                   for people on low incomes or
                                   with special needs.
PO22 Filling and excavation for AO22 Filling and excavation for Can Comply
operational    works     do not operational works is designed Refer attached Stormwater
directly,      indirectly      or and constructed to ensure Management Plan.
cumulatively    cause     adverse overland flow and/or flooding is
impacts     external     to   the not worsened, impeded, or
development site by:              otherwise diverted to adversely
 (a) causing ponding of water affect      other properties or
     on the site or nearby land;  downstream   environments.
(b) increasing flooding, which
    adversely affects the safety
    or use of any land
    upstream or downstream;
    or
(c) adversely affecting the flow
    of water in any overland
    flow path.




Dual Occupancy and Multiple Dwelling Code

   Performance Outcome                 Acceptable Outcome                      Response

PO1 Development is located No acceptable outcome provided             Complies with PO1
within the urban boundaries on                                        The proposal is located within
land with good access to a                                            urban boundaries and is zoned
variety of essential services and                                     for residential land uses. The
facilities,   including     retail,                                   site is in close proximity to
commercial, social and medical                                        public transport, and a range


                                                                                                  50

Log in to download the original (Town Planning Assessment Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.