                                             Officer:          Tracy Jones
                                             Direct Telephone: (07) 5449 5228
                                             Response Address: Locked Bag 72
                                                               Sunshine Coast Mail Centre QLD 4560
                                             Email:            [email protected]
                                             Our Reference:    2009/273
                                             Your Reference:   081212T
20 August 2009

Noosa District Rugby Union Club Inc
CARE KHA Development Managers
PO Box 6380
MAROOCHYDORE BC QLD 4558



Dear Sir

                                         Decision Notice
                                   Integrated Planning Act 1997

I refer to your application and advise that on 20 August 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:

1     APPLICATION DETAILS

 Application No:                     2009/273
 Street address:                     Bicentennial Drive, Sunshine Beach
 Real property description:          Lot 1 CP 842778
 Planning Scheme:                    The Noosa Plan

2     DECISION DETAILS
The following type of approval has been issued:
      Development Permit for Material Change of Use - Entertainment & Dining Business Type 2 -
      Recreation, Amusement & Fitness & Open Space Type 1 - Sport & Recreation

3     RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4     ASSESSMENT MANAGER CONDITIONS

Planning Assessment
1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are listed in the following table, prepared
      by Canty & Sons Construction, and may be amended by these conditions.

           Plan No.                  Rev.   Plan / Document Name                         Date
           Noosa Rugby Club          -      Location Plan                                7/12/2008
           Noosa Rugby Club          -      Site Plan                                    7/12/2008
                                                                                         Page 1 of 9
Full text of the other 8 pages

Page 2

                                                                                        2009/273




        Noosa Rugby Club             -       Existing & Proposed Terrace Area         7/12/2008
        Noosa Rugby Club             -       Roof and Retaining                       7/12/2008
        Noosa Rugby Club             -       Elevations                               7/12/2008
        Noosa Rugby Club             -       Proposed Shed Floor Plan                 undated
        Noosa Rugby Club             -       Proposed Shed Elevations                 undated

2.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
3.    Lighting shall comply with Australian Standard AS1158: Public Lighting Code.
4.    Existing trees on the site and within road reserves are to be retained, except where required to
      be removed due to building operations or the conduct of the approved use.
5.    Any advertising sign or device is to comply with Council's policies on advertising.
6.    Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for building works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
7.    The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
8.    The Development Permit for a material change of use of premises lapses if the use has not
      happened by 20 August 2013, unless an application to extend the relevant period is approved
      by Council.
9.    The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for Building Works.
Operational Works Assessment
Car Parking
Off Street
10.   Carparking shall be provided within the existing approved car park site as shown on the Site
      Plan dated 7 December 2008 by Canty & Sons Construction, except as modified herein.
11.   The carparking area shall comply with the provisions of AS/NZS 2890.1-2004 for user class
      1A with allowance for vehicles to enter and leave the site in a forward gear and with a
      minimum head clearance (headroom) at any point of 2.2m.
12.   All carparking shall be kept, and maintained in a condition fit for use.
Roof Water & Stormwater Drainage
13.   All stormwater drainage (including roof water overflow from the rainwater storage system)
      shall be collected, dispersed and discharged in a manner that does not cause ponding or
      scour on the site and so there is no net increase in stormwater runoff from the site.
      Plans of the drainage design must be prepared by a Registered Professional Civil Engineer
      and submitted with the application for Building Works Approval.
14.   As the site is proposed to be filled, appropriate stormwater drainage pipes shall be installed
      within the site to collect and discharge stormwater runoff from all adjoining properties to
      prevent additional ponding/flooding on these properties.
15.   All site stormwater drainage shall be by means of a gravity system.
                                                                                      Page 2 of 9

Page 3

                                                                                       2009/273



Earthworks
16.   Filling works required on site shall be carried out in accordance with Council’s Planning
      Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
      ponding of water on any adjoining lands or the blockage of, or interference with, any natural
      watercourses.
17.   Materials used as fill are suitable for development of the land and filling or excavation works
      do not result in contamination of the land or present a public health risk.
Erosion and Sediment Control
18.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary
      In this regard, plans detailing the methods of controlling erosion and sediment in accordance
      with the Healthy Waterways document and fact sheet series titled Controlling Stormwater
      Pollution on your Building Site dated 2006 are required to be submitted with the application for
      a Building Works Permit.
General
19.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
Environmental Health
20.   The developer must provide waste storage and disposal facilities in accordance with Planning
      Scheme Policy No 9 “Waste Management Multi-Dwellings and Commercial and Industrial
      Premises”, including an external imperviously paved area correctly sized for all refuse and
      recycling containers and suitably screened from public places and neighbouring properties. A
      roofed waste/bin wash area is required with a cold-water tap, hose and drain outlet connected
      to sewer, via a bucket trap and grease arrestor.
21.   Noise from building works associated with residential development shall comply with the
      following –
      21.1.   Limited to between 7:00am to 6:30pm Monday to Saturday.
      21.2.   All reasonable measures are taken to minimise noise emissions.
      21.3.   Not permitted on Sunday or public holidays.
22.   Where any food premises is included in a development, the following is required:
      22.1.   Plans and application is to be made to Council’s Environmental Health Section for
              approval prior to any building approval, fitting out or use of the premises.
      22.2.   Toilets for customers and staff to be provided in accordance with Building Code of
              Australia. Obtain advice from a building certifier on numbers and standards, including
              disable access.
      22.3.   Plans and approval is required for any mechanical exhaust ventilation system, which
              should comply with AS1668. A certificate from the installer certifying the system
              complies with the Standard must be obtained and lodged with Council prior to
              commencement of trade




                                                                                     Page 3 of 9

Page 4

                                                                                           2009/273




5     REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:

 Referral Trigger              Referral Status      Referral Agency      Referral Address

 Wetlands                      Advice               Department of        SEQ Natural Services
                                                    Environment and      GPO Box 2771
                                                    Resource             BRISBANE QLD 4001
                                                    Management

A copy of any referral agency conditions is attached.

6     APPROVED PLANS/DOCUMENTS

The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.     Plan / Document Name                       Date

 Noosa Rugby Club          -        Location Plan                              7/12/2008
 Noosa Rugby Club          -        Site Plan                                  7/12/2008
 Noosa Rugby Club          -        Existing & Proposed Terrace Area           7/12/2008
 Noosa Rugby Club          -        Roof and Retaining                         7/12/2008
 Noosa Rugby Club          -        Elevations                                 7/12/2008
 Noosa Rugby Club          -        Proposed Shed Floor Plan                   undated
 Noosa Rugby Club          -        Proposed Shed Elevations                   undated

7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.




                                                                                        Page 4 of 9

Page 5

                                                                                      2009/273



8      PROPERTY NOTES
Not applicable

9      PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable
10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required         Subject of the required Development Permit
 Development Permit for Building Works       All Building Works

11     SELF ASSESSABLE CODES

The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
    Advertising Devices Code

12     SUBMISSIONS
There were no properly made submissions about the application.

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable

14     RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15     OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

Yours faithfully,



Kerri Coyle
COORDINATOR PLANNING APPLICATIONS (NORTH)




                                                                                    Page 5 of 9

Page 6

                                         2009/273



Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                       Page 6 of 9

Page 7

  2009/273




Page 7 of 9


[OCR of page images]
2009/273

 

ecoaccess

soedror name? momncar pret pawns
Notice
Advice Agency Response

Respanse to Development Application

Tha Department of Ervironment and Resource Management (DERM) actng as an advice agency undey the
integrated Planning Act 1997, provides the following advice to the application as detailed abova Please trcat
this response as a propery made sLbmission with respect ta this application.

Advice

‘The department has 10 advice or recommendations in relatien to this alerlal chance of use.

The exiension works and shed and suificiently separated from adjacent biodiversity values. Drawings suggest
onsite disposal of stonmvwater, which is supported

Additional infarmation for applicants:

It is @ requiremant of Section 371 of the Environmental Pratectian Act 1994 that if the owner er aceupier of this
site becomes aware that a Notifiable Activity {as defined under Schecule 3 of the Environmental Protection Act
129¢) is being carried out on this land or that the land has been affected by a hazardous cantaminant they
must, within 22 business days after becoming aware the activity is being carried aut, or the land has been
affecced, give notice to the Department of Environment and Resource Management. A list of Notifiable Activities
is provided In Schedule 3 9% the Environmental Protection Act 7994. Failure to give the required notice, except
where notice bas aready been given, may give ssc to an offence.

Yours singerely

. 29 April 2503
~ ; f Signature Dale

 

 

John Harden : Enquiries:

AJMManager, SEQ Natural Services Dr Simon Stirrat, SEQ Natural Sarvicas
Dereguts for GPO Box 27/1. BRISBANE QLD 4901
Deperlnent of Kavegriment and Resourcer Telephone: (07) 2225 8454

Management Facsimile (07) 3225 8723

Page 2of2«c601ig © ° Department of Environment and Resource Management

Page 7 of 9

Page 8

                                                                                                       2009/273




                                                        Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997 & 1998 REGULATION



The following is an extract from the Integrated
                                                                    (6) If an application involves assessment against a
Planning Act (Chapter 4).                                      concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to                      for the application are not available against the part of
development applications                                       the approval that represents the concurrence agency’s
                                                               response for the code.
Appeals by applicants
4.1.27.(1) An applicant for a development application
                                                               Appeals by advice agency submitters
may appeal to the court against any of the following-          4.1.29.(1) An advice agency may, within the limits of
                                                               its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development
                                                               development approval for a development application
      application;
                                                               if-
(b) a matter stated in a development approval,
      including any condition applying to the
                                                               (a) the development application involves impact
                                                                   assessment; and
      development, and the identification of a code
      under section 3.1.6;1                                    (b) the advice agency told the applicant and the
                                                                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a
                                                                   application as a submission for an appeal.
      development permit was applied for;
                                                                  (2) The appeal must be started within 20 business
(d) the length of a relevant period;
                                                               days after the day the decision notice or negotiated
(e) a deemed refusal.                                          decision notice is given to the advice agency as a
   (2) An appeal under subsection (1)(a) to (d) must           submitter.
be started within 20 business days (the “applicant’s           Appeals for matters arising after approval given
appeal period”) after the day the decision notice or           (co-respondents)
negotiated decision notice is given to the applicant.
                                                               4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be               development application, a person to whom any of the
started at any time after the last day a decision on the       following notices have been given may appeal to the
matter should have been made.                                  court against the decision in the notice-
Appeals by submitters                                          (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application               extension of the relevant period for an approval;
may appeal to the court about-                                 (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including                minor change to an approval.
      any conditions (or lack of conditions) or other              (2) The appeal must be started within 20 business
      provisions of the approval; or                           days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval.          the person.
    (2) The appeal must be started within 20 business                (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day            approval resulted from a development application
the decision notice or negotiated decision notice is           (superseded planning scheme) that was assessed as
given to the submitter.                                        if it were an application under a superseded planning
   (3) If a person withdraws a submission before the           scheme.
application is decided, the person may not appeal the             (4) Also, a person who has made a request
decision.                                                      mentioned in subsection (1) may appeal to the court
   (4) If an application involves both impact                  against a deemed refusal of the request.
assessment and code assessment, appeal rights for                 (5) An appeal under subsection (4) may be started
submitters are available only for the part of the              at any time after the last day the decision on the
application involving impact assessment.                       matter should have been made.
    (5) If an application is processed under section           Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the                Appeals for matters arising after approval given
application are available only for the aspects of the
                                                               (no co-respondents)
development that would have required public
notification under the repealed Act.                           4.1.31.(1) A person to whom any of the following
                                                               notices have been given may appeal to the court
                                                               against the decision in the notice-
                                                               (a) a notice giving a decision on a request to change
a.                                                                 or cancel a condition of a development approval.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                     Page 8 of 9

Page 9

                                                                                                    2009/273

(b) a notice under section 6.1.442 giving a decision to     (d) the length of a period mentioned in section 3.5.21
     change or cancel a condition of a development                relevant period;
     approval.                                              (e) a deemed refusal.
    (2) The appeal must be started within 20                    (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision      be started within 20 business days (the “applicant’s
is given to the person.                                     appeal period”) after the day the decision notice or
   (3) Also, a person who has made a request                negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the                (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request.              started at any time after the last day a decision on the
    (4) An appeal under subsection (3) may be               matter should have been made.
started at any time after the last day the decision on      The Registrar for the Building and Development
the matter should have been made.                           Tribunal may be contacted at the website
Appeals against decisions to change approval                http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
                                                            For Infrastructure Charges Only
decision made on an application to change the               4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under              charges
section 2.19(3)or section 4.4 of the repealed Act may       (1) This section applies to a person who has been
appeal to the court against-                                given, and is dissatisfied with, an infrastructure
(a) the decision; or                                        charges notice or a regulated State infrastructure
(b) a deemed refusal of the application.                    charges notice.
    (2) An appeal under subsection (1)(a) must be           (2) The person may appeal to the court against the
started within 20 business days after the day notice of     notice.
the decision is to be given to the person.                  (3) The appeal must be started within 20 business
    (3) An appeal under subsection (1)(b) may be            days after-
started at any time after the last day a decision on the    (a) if the notice is given because of a development
matter should have been made.                                    approval or master plan approval-the day the
Appeals against local laws                                       applicant is given notice of the decision about the
                                                                 approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions            (b)    otherwise-the day the notice is given to the
applied under a local law about the use of premises or             person.
the erection of a building or other structure permitted     (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court              (a) whether a charge in the notice is so
against the decision or the conditions applied.                  unreasonable that no reasonable relevant local
    (2) The appeal must be started within 20 business            government, State infrastructure provider or
days after the day notice of the decision is given to the        coordinating agency could have imposed it; or
applicant.                                                  (b) an error in the calculation of the charge.
For Building Works Only                                     (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the          appeal under this section can not be about the
Integrated Planning Act 1997 as follows:                    methodology used to establish the charge in the
                                                            relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
                                                            State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
     application;
(b) a matter stated in a development approval,
     including any condition applying to the
     development, and the identification of a code
     under section 3.1.6;3
(c) the decision to give a preliminary approval when a
     development permit was applied for;

a.
2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
   Section 3.1.6 (Preliminary approval may override
  local planning instrument)
                                                                                                 Page 9 of 9

Used in these records

About this file

File size
90 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice [As Published].pdf · 90 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.