Decision Notice [As Published] · 132009.273
2009/273
Noosa Rugby Club - Existing & Proposed Terrace Area 7/12/2008
Noosa Rugby Club - Roof and Retaining 7/12/2008
Noosa Rugby Club - Elevations 7/12/2008
Noosa Rugby Club - Proposed Shed Floor Plan undated
Noosa Rugby Club - Proposed Shed Elevations undated
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. Lighting shall comply with Australian Standard AS1158: Public Lighting Code.
4. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use.
5. Any advertising sign or device is to comply with Council's policies on advertising.
6. Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
7. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
8. The Development Permit for a material change of use of premises lapses if the use has not
happened by 20 August 2013, unless an application to extend the relevant period is approved
by Council.
9. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Operational Works Assessment
Car Parking
Off Street
10. Carparking shall be provided within the existing approved car park site as shown on the Site
Plan dated 7 December 2008 by Canty & Sons Construction, except as modified herein.
11. The carparking area shall comply with the provisions of AS/NZS 2890.1-2004 for user class
1A with allowance for vehicles to enter and leave the site in a forward gear and with a
minimum head clearance (headroom) at any point of 2.2m.
12. All carparking shall be kept, and maintained in a condition fit for use.
Roof Water & Stormwater Drainage
13. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected, dispersed and discharged in a manner that does not cause ponding or
scour on the site and so there is no net increase in stormwater runoff from the site.
Plans of the drainage design must be prepared by a Registered Professional Civil Engineer
and submitted with the application for Building Works Approval.
14. As the site is proposed to be filled, appropriate stormwater drainage pipes shall be installed
within the site to collect and discharge stormwater runoff from all adjoining properties to
prevent additional ponding/flooding on these properties.
15. All site stormwater drainage shall be by means of a gravity system.
Page 2 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 90 KB (small file)
- File type
No other editions are linked here.