Negotiated Report (Representations made) MCU24 0153 (As Published) · MCU24/0153

of 20

Text shows just the words. Original shows the document exactly as it was published.

                      Maintenance and protection of water quality and existing drainage lines through the
                      construction site through the implementation of appropriate erosion and sediment control
                      measures.
                      Works programme identifying key components of the works and their respective durations.
                      Establishment of a communication protocol with the general public, adjoining owners,
                      emergency services and local businesses to advise of agreed construction times, impacts
                      on traffic and services and other relevant issues.
                      Include a post out to the local residents and businesses advising of the proposed
                      development, the expected time frames and the site contact details.
                      Include signage in prominent locations on the boundaries of the site advising of the proposed
                      development, the expected time frames and the site contact details.
                      identification of complaint management procedures including:
                              i.        contact details for the on-site manager; and
                      i.      dispute resolution procedures.
               11.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               12.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Engineering
               13.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               14.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               15.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice.
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines.
                      c.      The relevant conditions of the higher order Material Change of Use approval viz
                              MCU24/0153 to which this approval relates.
                      d.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                      Retention of Existing Trees and Vegetation
               16.    All trees and vegetation identified for retention must be protected in accordance with AS
                      4970, Protection of trees on development sites.
               17.    A qualified person * must be engaged for the duration of the works to:




                                                                                                    Page 12 of 20

Document Set ID: 24188054
Version: 10, Version Date: 18/12/2025

Used in these records

About this file

File size
555 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Report (Representations made) MCU24 0153 (As Published).pdf · 555 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.