Negotiated Report (Representations made) MCU24 0153 (As Published) · MCU24/0153
a. Supervise tree protection within the development site and frontages, prior to, during
and following construction in accordance with AS 4970, Protection of trees on
development sites.
b. Supervise and undertake necessary tree protection for all trees affected by the
development on neighbouring Lots. This includes tree identified in the approved
arborist report as outside project scope within the neighbouring properties east of the
development site. Where trees within neighbouring properties are found to be unsafe
due to works relating to this development approval, the developer is solely responsible
for the removal and replacement of these trees.
c. Oversee approved tree removal in proximity to retained trees.
*(Refer to Advisory Note)
Vegetation Clearing
18. Removal of trees and vegetation must be undertaken by a qualified person* and must
include:
a. No damage to vegetation for retention.
b. Legal disposal of all removed vegetation and debris.
Fauna Management
19. Prior to felling or pruning, all trees are to be checked for wildlife (i.e. koalas, possums, birds
etc.) If wildlife is present, the tree vegetation must not be felled or pruned until the wildlife
has left vegetation or has been relocated by a qualified fauna spotter catcher.
*(Refer to Advisory Note)
Landscaping Works
20. Landscape works must be supervised, undertaken and certified by qualified persons*. All
works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
21. Public amenity trees* must:
a. Meet AS 2302 – Tree Stock for landscape use.
b. Be located in accordance with engineering requirements for safe vehicle and
pedestrian sight lines.
*(Refer to Advisory Note)
22. Turfed areas must be free of pest, diseases and weeds and level with adjoining surfaces.
Roadworks (External Roadworks & Road Widening Works)
23. All pavement widening or construction of new pavement must join neatly to the existing
pavement so that there are no irregularities in line or level resulting at or adjacent to the join
for the length of the construction. Where necessary the existing pavement must be brought
to a satisfactory standard to allow for the above.
24. All street surfacing must consist of a minimum depth of 30mm of an approved hot mixed
asphaltic concrete, unless other pavement types are approved as feature areas in
intersection thresholds, speed control devices, turning areas, indented parking etc.
Pavement Design and Construction
25. The pavement designs shown on the engineering drawings are not approved. To attain
approval for the pavement design, the following details must be submitted and certified by
an RPEQ with the proposed pavement design.
a. The design CBR must be based on the four day soaked CBR value for the subgrade
material.
Page 13 of 20
Document Set ID: 24188054
Version: 10, Version Date: 18/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Report (Representations made) MCU24 0153 (As Published).pdfRelated documentApplication case desk ↗
Negotiated Report (Representations made) MCU24 0153 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 555 KB (small file)
- File type
No other editions are linked here.