Early Referral Agency Response - Planning RAP25 0030 (As Published) · RAP25/0030
Building Height
3. The maximum height of the development must not exceed 8.0 metres above the finished
ground level and the natural ground surface. Except for the northern and eastern edges
of the upper roof which must not exceed 8.6 metres above the finished ground level and
the natural ground surface, as shown on the approved plans.
4. Certification must be submitted to Council from a Registered Cadastral Surveyor (QLD)
which certifies that the building does not exceed the maximum height requirement of this
Decision Notice.
Car Parking
5. A minimum of 2 car parking spaces must be provided on site and made available and
accessible at all times for residents.
Environment
6. Sediment or any other material including building materials or waste products must not
be deposited or released into the road reserve, stormwater drain or adjacent properties.
Landscaping Works
7. A minimum of 20% of the site must be retained as soft landscaping.
8. Existing vegetation in the road reserve must be retained, unless written authorisation
from Council is granted for the clearing.
9. All vegetation shown on reference Demolition Plan A0.106 Revision 7 is to be retained,
except were an arborist report demonstrates removal is essential for site works that
cannot be relocated or modified to accommodate the vegetation. Trees to be retained
must be protected from clearing or construction activities by:
(a) clearly marking vegetation to be retained with flagging tape
(b) installing protective fencing around the drip line of the vegetation
(c) restricting stockpiling, storage and vehicle parking to those areas which are
already cleared
(d) using low impact construction techniques around vegetation.
10. All container planting areas on the terraces must be planted and maintained at all times,
with replacement planting undertaken promptly where plants fail or do not have a healthy
and vigorous growth.
11. All landscape works must be established and maintained for the life of the development,
and in a manner that ensures healthy, sustained and vigorous plant growth. All plant
material must be allowed to grow to full form and be refurbished when its life expectancy
is reached.
ENGINEERING
Site Access and Driveways
12. A sealed access driveway must be provided from Bayview Road to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. a driveway crossover located generally in accordance with the approved plans
b. a driveway crossover generally in accordance with Council’s Standard Drawings
RS-049 and RS-050 and any associated addendum
Page 3 of 6
Document Set ID: 24605219
Version: 3, Version Date: 17/03/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Early Referral Agency Response - Planning RAP25 0030 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 113 KB (small file)
- File type
No other editions are linked here.