Early Referral Agency Response - Planning RAP25 0030 (As Published) · RAP25/0030
Stormwater Drainage
13. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. Stormwater runoff from the development must be disposed of either
on-site or discharged to Bayview Road. Stormwater runoff must be disposed of and or
discharged without causing scour or damage to the subject site or any adjoining
property.
Geotechnical Stability
14. All works must be carried out in accordance with the recommendations of a site specific
Geotechnical Report prepared by a qualified person* and endorsed through a building
approval.
*(Refer to Advisory Note)
15. At the completion of the development works certification must be submitted to Council
from a qualified person* which certifies that the development has been constructed in
accordance with the recommendations contained in the site specific Geotechnical
Report and that the development has a minimum factor of safety against landslip of 1.5
in the long term.
*(Refer to advisory Note)
Earthworks and Retaining Walls
16. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Damage to Services and Assets
17. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
1. REFERENCE DOCUMENTS
Doc No. Rev. Document Name Date
- S24- Stormwater Management Report prepared by Westera 17 April 2025
198 Partners Pty Ltd
- PG- Preliminary Geotechnical Investigation and Slope Stability December
12709 Assessment prepared by Pacific Geotech Consulting 2024
Geotechnical Engineers
A0.106 7 Demolition Site Plan prepared by Myers Architecture 26.02.2026
Page 4 of 6
Document Set ID: 24605219
Version: 3, Version Date: 17/03/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Early Referral Agency Response - Planning RAP25 0030 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 113 KB (small file)
- File type
No other editions are linked here.