Early Referral Agency Response - Planning RAP25 0030 (As Published) · RAP25/0030
ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the referral agency conditions:
PLANNING
Infrastructure Charges
1. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges
Resolution” made pursuant to the planning legislation and regulations current at the time
of issue. For further information, please refer to: https://www.noosa.qld.gov.au/Planning-
and-Development/Development-tools-and-guidelines/Infrastructure-Charges
Equitable Access and Facilities
2. The plans for the proposed building work have NOT been assessed for compliance with
the requirements of the National Construction Code - Building Code of Australia (Volume
1) as they relate to people with disabilities. Your attention is also directed to the fact
that in addition to the requirements of the National Construction Code as they relate to
people with disabilities, one or more of the following may impact on the proposed
building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
c. the Disability (Access to Premises – Buildings) Standards.
Fires in Urban Areas
3. In urban areas fires are prohibited except where in an appliance is used for domestic
heating or cooking purposes, which must comply with particular standards. Any area
identified as a fire pit area on approved plans is to be in accordance with Local Law &
Subordinate Local Law No. 3, Schedule 3. Refer to the following link for details:
https://www.noosa.qld.gov.au/community/local-laws/local-laws-overview
ENGINEERING
Qualified Person
4. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
stability for the development, a qualified person is considered to be a person who:
(a) is a Registered Professional Engineer of Queensland (RPEQ); and
(b) has a degree in civil engineering or engineering geology; and
(c) has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
Preparation of a Preliminary Construction Management Plan
5. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
(a) expected vehicle movements and the types of vehicle;
(b) appropriate traffic signage in accordance with the Manual of Uniform Traffic
Control Devices (MUTCD); and
(c) provision for safe pedestrian and vehicle access across the frontage of the site
both during daily construction and after daily construction has ceased.
Page 5 of 6
Document Set ID: 24605219
Version: 3, Version Date: 17/03/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Early Referral Agency Response - Planning RAP25 0030 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 113 KB (small file)
- File type
No other editions are linked here.