Annual Report 2023-24
Very large file (13.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 52, section 1. The text section number identifies this passage in the reader.
Our Performance
Complete Intiatives Complete Intiatives
OP Service / Manager Date OP Service / Manager Date
Initiative Comments Initiative Comments
Ref Responsible Delivered Ref Responsible Delivered
1.3.4 Finalise the Eastern Beaches Environmental 30/06/2024 Plan is complete and endorsed by 1.7.3 Continue providing flora and Environmental 30/06/2024 Continued as part of standard
Foreshore Management Plan. Services Council. fauna records to WildNet and Services functions.
updating internal mapping/
1.4.1 Complete Stage 4 of Local Heritage 30/06/2024 Findings and research from project
databases to include current
Heritage Register Review Coordinator completed and consolidated in
data.
including preparing for preparation for final stage of project
recommended planning scheme to provide recommendations to 1.7.4 Complete Fine Scale Regional Environmental 30/06/2024 Regional Ecosystem information has
amendments. Strategic Planning team to progress Ecosystem Mapping across the Services been submitted to Herbarium, but
as planning scheme amendments. Noosa Shire in collaboration with due to resourcing the Herbarium
the Queensland Herbarium to will not be able to assess the data
1.4.2 Prepare Conservation Heritage 30/06/2024 Conservation Management Plans
improve the accuracy of local for 6-12months. The Noosa Council
Management Plans for at least Coordinator for three sites (Cooroy Cemetery,
and state vegetation mapping aspect of this project is now
two Council-controlled, heritage Tewantin Cemetery and Pomona
datasets. complete.
properties. Cemetery).
1.8.3 Continue to implement Development 30/06/2024 Continue to utilise relevant experts
1.4.3 Document the iconic story of Heritage 30/06/2024 Images and oral histories gathered
best practice Development Assessment where required - ensuring cost
surfing in Noosa to capture Coordinator through the project added to
Assessment services that deliver effective supply of these services.
this unique aspect of Noosa’s Heritage Noosa. Continuing to
the strategic outcomes of the Continuing to review the processes
heritage and lifestyle. document this story and make
Noosa Plan 2020. undertaken within the Development
available via Heritage Noosa will be
Assessment team, making changes
ongoing as part of heritage activities.
where required.
1.4.4 Complete Stage 4 of Heritage Heritage 30/06/2024 Approximately 4,000 additional
1.8.5 Develop employee competencies Civil Operations & 30/06/2024 The environmental operational
Noosa with a focus on making Coordinator images, oral histories, and
through targeted training Assets works matrix has been updated
donated materials publicly documents added to the site.
102
to increase environmental and is being incorporated into the 103
accessible.
awareness in operational Maintenance Plan.
1.5.1 Support the transition Environmental 30/06/2024 Final report submitted. Awaiting works in roads and vegetation
arrangements for the Yurol Services gazettal. management.
Ringtail State Forest land for
conservation to expand the area
protected for conservation in
Noosa Shire. On Track Initiatives
1.5.3 Continue the management, Environmental 30/06/2024 Successfully delivered for FY24 OP Service / Manager
Initiative Status Comments
maintenance, and monitoring of Services and ongoing for FY25. Included Ref Responsible
bushland reserve areas. operational management of the
1.1.2 Monitor, investigate and make Environmental Education material complete for
highest priority Bushland Reserves
progress towards ongoing Services seagrass project. Prioritisation
to improve ecosystem function. All
restoration efforts of aquatic tool for riparian projects identified.
vehicle and access trails remained
habitats such as wetlands, Continued support to NICA for
open for community use.
seagrass, and oyster reefs, and ongoing monitoring of the Oyster
1.7.2 Manage flying fox impacts on the Environmental 30/06/2024 Program successfully delivered improve riparian vegetation and Reef project - next status report due
community in accordance with Services through regular scheduled foreshore management. EOFY. This program will effectively
the Noosa Council Statement of monitoring of permanent roosts. become the implementation
Noosa Council Annual Report 23/24
Management Intent (SoMI) and Increases in population at Waratah of the Noosa River Catchment
through community education. Reserve and Wallace Park were Management Plan. We were
managed in accordance with anticipating that it would move
the SoMI through community through the July Council meeting
engagement, increased monitoring as planned. However, as there is a
and impact assessments for potential delay it has been difficult to
adjacent properties. plan for. There is a budget item for
NRCMP projects that will include the
above initiatives.
Note-ongoing and part of BAU
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.