Issue Desired Outcomes
Erosion Control 1. Stage clearing and construction works to minimise the area of exposed
soil at any one time.
2. Effectively cover or stabilise exposed soils prior to predicted rainfall.
3. Prior to completion of works for the development, and prior to removal
of sediment controls, all site surfaces must be effectively stabilised
using methods which will achieve effective short-term stabilisation.
Sediment Control 1. Direct runoff from exposed site soils to sediment controls that are
appropriate to the extent of disturbance and level of erosion risk.
2. All exposed areas greater than 2500 metres must be provided with
sediment controls which are designed, implemented and maintained
to a standard which would achieve at least 80% of the average annual
runoff volume of the contributing catchment treated (i.e. 80%
hydrological effectiveness) to 50mg/L Total Suspended Solids (TSS) or
less, and pH in the range (6.5–8.5).
Litter, Hydrocarbons and 1. Remove gross pollutants and litter.
other contaminants
2. Avoid the release of oil or visible sheen to released waters.
3. Dispose of waste containing contaminants at authorised facilities.
Waterway Stability and 1. Where measures are required to meet post-construction waterway
flood flow management stability objectives, these are either installed prior to land disturbance
and are integrated with erosion and sediment controls, or equivalent
alternative measures are implemented during construction.
2. Earthworks and the implementation of erosion and sediment controls
are undertaken in ways which ensure flooding characteristics
(including stormwater quantity characteristics) external to the
development site are not worsened during construction for all events up
to and including the 1 in 100 year ARI (1% AEP).
Table 3 – SPP Appendix 2: Part 2 Construction Phase – Stormwater Management Design Objectives
for Temporary Drainage Works
Temporary Drainage Works Anticipated Operation Design Life and Minimum
Design Storm Event
<12 Months 12-24 Months >24 Months
Drainage Structure 1 in 2 year 1 in 5 year 1 in 10 year
ARI/39% AEP ARI/18% AEP ARI/10% AEP
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.