Stormwater Management Report
The original of this document is very large (11.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
Temporary Drainage Works Anticipated Operation Design Life and Minimum
Design Storm Event
<12 Months 12-24 Months >24 Months
Where located immediately up-slope of an 1 in 10 year ARI/10% AEP
occupied property that would be adversely
affected by the failure or overtopping of the
structure
Culvert Crossing 1 in 1 year ARI/63% AEP
Table 4 – SPP Appendix 2: Part 3 Construction Phase – Stormwater Management Design Objectives
for Emergency Spillways on Temporary Sediment Basins
Drainage Structure Anticipated Operation Design Life and Minimum
Design Storm Event
<3 Months 3-12 Months >12 Months
Emergency spillways on temporary 1 in 10 year 1 in 20 year 1 in 50 year
sediment basins ARI/10% AEP ARI/5% AEP ARI/2% AEP
Best practice erosion and sediment controls must be installed to minimise the discharge of sediment
laden runoff during construction and to achieve the objectives outlined in Tables 2-4. This is discussed
in the following section.
4.2.2 E ro sio n and Se dim en t Co ntr ol
Management of stormwater runoff during construction is necessary to avoid pollution of downstream
waterways from sediment and gross pollutant loading. Impacts of inadequate erosion and sediment
control downstream from the site include:
• traffic safety problems;
• blocked drains;
• local flooding problems;
• aesthetic pollution of drainage paths; and
• damage to local ecosystems.
Best practice erosion and sediment controls must be installed to minimise the discharge of sediment
laden runoff during construction. Erosion and sediment control plans shall be developed during detailed
design phase and must be continually maintained and amended as required to minimise environmental
harm.
Erosion and sediment control plans are based on three sets of control measures:
• drainage control;
• erosion control; and
• sediment control.
5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.