                                                     level; and
                                             (ii)​   decks or balconies
                                                     less   than    1m
                                                     above       ground
                                                     level.

                                   AO9.5 Buildings and structures on
                                   premises with frontage to the Not applicable
                                   Noosa River system are setback
                                   not less than 10 metres from the
                                   mean high water spring as shown
                                   in Figure AP3-15A


                                   Alternative provision to the
                                   QDC


Setback to a watercourse in the AO10 For premises adjoining a Not applicable
Noosa        Waters        estate, watercourse within the Noosa
Noosaville                         Waters estate no building work,
PO10 Land adjoining the revetment filling or excavation works occurs
wall and for a width of 4.5 metres within 4.5 metres from the centre
serves flood detention and amenity line of the top of the concrete
functions.                         revetment wall.

                                   Editor's note—refer to Figure 6.3.1.5

                                   Alternative provision to the
                                   QDC

PO11 The flood detention and AO11.1 A minimum of 25% of the Not applicable
amenity functions of the area area within 4.5 metres of the
adjoining  the    Noosa   Waters revetment wall is gardens planted
revetment wall are retained and with shrubs and small trees with a
enhanced by ensuring:            mature height of 3 metres or less.
   (a)​ works do not protrude
        through a batter line of AO11.2 The ground surface within Not applicable
        1:4.5 measured from the the first metre of the revetment
        centre line of the revetment wall—
        wall;
                                         (a)​ is grass or ground cover;
   (b)​ there is no additional load           and
        placed on the revetment
                                         (b)​ does not include shrubs.
        wall;
   (c)​ works do not pose a risk to
                                                                         Not applicable
        the membrane adjoining the AO11.3 Side boundary fences
        revetment wall;               within 4.5 metres of the revetment
                                      wall taper down to a maximum
   (d)​ the    watercourse        and height of 1.2 metres at the
        surrounding land uses are revetment wall and no more than
        not adversely affected by 1.5 metres at a distance of 2.25
        development         (building metres from the revetment wall.
        works, filling or excavation)



                                                                                          19

Used in these records

About this file

File size
5.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Town Planning Assessment Report.pdf · 5.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.