Skip to the record
Beware of cheap imitations.

Council archive · source document

AppendixB_CodeandOverlayAssessment · MCU16/0078

Attached to the e-mail MCU16/0078 - Development Application.

of 133

Text shows just the words. Original shows the document exactly as it was published.

Appendix B Code and Overlay Assessment
45 Elizabeth Street, Noosaville



 Water Supply and Sewerage Reticulation Code (Division 21)
 Probable solution                                      Specific outcome                           Response                                                  Complies
                                                        of influence; AND                          Services Plans will be prepared and submitted for
                                                                                                   approval at Operational Works stage.
                                                        S5.4 The easement is centred over the
                                                        centreline of the infrastructure.

 O6 Alignment of water supply infrastructure            S6.1 Infrastructure is designed and        The development will comply with the relevant             YES
 allows for easy access for the ongoing                 constructed on the preferred               Water Supply design guidelines as required. Detailed
 maintenance by Council.                                alignments in accordance with PSP6         Services Plans will be prepared and submitted for
                                                        Engineering Design Standards – Water       approval at Operational Works stage.
                                                        and Sewerage.




 O7 Any alterations or repairs to infrastructure as a   S7.1 Any alterations or repair to          Any alterations or repair to infrastructure as a result   YES
 result of the development are made at no cost to       infrastructure as a result of the          of the development will be completed at the
 Council.                                               development are completed at the           developer’s expense.
                                                        developer’s expense.

 Table 14-63 Sewerage reticulation

 14.165 Design and construction (sewer)

 O8 Sewerage reticulation infrastructure—               S8.1 Sewerage reticulation                 The development will comply with the relevant             YES
                                                        infrastructure is designed in accordance   Sewerage Reticulation design guidelines as required.
     a) meets the needs of the users;                   with PSP6 Engineering Design Standards     Detailed Services Plans will be prepared and
     b) is designed to be compatible with existing

                                                                                                                                                                        123

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

AppendixB_CodeandOverlayAssessment.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.