Skip to the record
Beware of cheap imitations.

Council archive · source document

AppendixB_CodeandOverlayAssessment · MCU16/0078

Attached to the e-mail MCU16/0078 - Development Application.

of 133

Text shows just the words. Original shows the document exactly as it was published.

Appendix B Code and Overlay Assessment
45 Elizabeth Street, Noosaville



 Water Supply and Sewerage Reticulation Code (Division 21)
 Probable solution                                       Specific outcome                         Response                                               Complies
     infrastructure; and                                 – Water and Sewerage.                    submitted for approval at Operational Works stage.

 c) is designed using materials that are suitable of
 the use, durable, easy to maintain and cost
 effective, taking into account the whole of life
 cycle cost and Council’s maintenance inventory.



 O9 Sewerage reticulation infrastructure is              S9.1 Sewerage reticulation               The development will comply with the relevant          YES
 constructed—                                            infrastructure is constructed in         Sewerage Reticulation design guidelines as required.
                                                         accordance with PSP6 – Engineering       Detailed Services Plans will be prepared and
     a) in accordance with appropriate engineering       Design Standards — Water and             submitted for approval at Operational Works stage.
     standards; and                                      Sewerage and As Constructed data
                                                         submitted in accordance with PSP6 –
     b) to minimise adverse environmental impacts
                                                         Engineering Design Standards — Water
                                                         and Sewerage; AND

                                                         S9.2 Erosion and sediment control
                                                         measures are designed and
                                                         implemented in accordance with the
                                                         Institution of Engineers Australia
                                                         (Queensland Division) Soil Erosion and
                                                         Sediment Control - Guidelines for
                                                         Queensland Construction Sites.

 O10 Sewerage reticulation infrastructure is proven      No solution provided.                    The development will comply with the relevant          YES
 to be suitable for its use prior to Council accepting                                            Sewerage Reticulation design guidelines as required.
 the dedicated asset.                                                                             Detailed Services Plans will be prepared and
                                                                                                  submitted for approval at Operational Works stage.



                                                                                                                                                                    124

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

AppendixB_CodeandOverlayAssessment.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.