Council archive · source document
MCU21-0177.01 -Applicant's Response · MCU21/0117.01
Applicant’s Response
Please refer to Attachment A - Amended SWMP document prepared by Morgan Consulting.
Information Required by Council
2. Provide a revised SMP that analyses a more appropriate rainfall data source for the development
site. It is noted that the previous SMP prepared by RECOR used station 40059 Cooroy Composite.
Applicant’s Response
Please refer to Attachment A - Amended SWMP document prepared by Morgan Consulting.
Information Required by Council
3. Provide an amended design which incorporates indents to wall alignments and increases the
volume and quality of the landscaping at the frontage to assist with screening hardscape walls, bin
storage and side boundary fencing
Applicant’s Response
Please refer to Attachment 2 + 3 - Amended Plans prepared by Blackburne Jackson dated 13.03.24 and
Amended Landscaping Plans prepared by Blackburne Jackson – Operational Works Issue – 13.03.24.
Landscaping has been moved from behind the front entry wall to in front of it, to add further softening of
the built form, fences and bin area. This has increased the volume and quality of landscaping as requested.
PO Box 1818 07 5474 3873
Noosa Heads [email protected]
QLD 4567 rgstrategic.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU21-0177.01 -Applicant's Response .pdfRelated documentApplication case desk ↗
About this file
- File size
- 518 KB (small file)
- File type
No other editions are linked here.