Council archive · source document
Application part 2 [As Published] · 142007.1242
June 2006 -8- 06683025-1000(AA) 6.5 ASS Extent and Severity The results from this investigation indicate that there is a negligible probability of ASS having a potential to generate sulfidic leachate where the proposed development extends below RL 5m AHD. However, there is slight to moderate existing acidity variably distributed throughout the soil profile. The SPP2/02 Guideline requires that the level of treatment for management of excavated ASS is based on treatment of all existing and potential acidity. The results of the laboratory testing have been accumulated in an Acid-Base Account to give a Net Acidity Value (NAV) for each sample in units of mol H’/tonne as presented in Table B1. This value has been calculated from sulfur trail potential acidity (Sc,) plus actual acidity (TAA). Assuming a bulk density of 1.8 tonne/m’ for the sandy and clayey soils likely to be excavated, and using the maximum NAV value recorded in the boreholes, the following rates are calculated: 5 kg.Lime/m’: Soil excavated from 0.0 m to 1 m depth; and 18 kg.Lime/m’: Soil excavated from greater than 1 m depth. In summary, the investigation has identified that there is a negligible probability for the occurrence of PASS material, however existing acidity within the soil requires treatment. 6.6 Groundwater Assessment In accordance with Part B, Section 2 of the Guidelines to SPP 2/02, it is understood that “the presence or absence of acidic groundwaters” is required to be assessed “prior to works that may result in the release of such waters”. As described in Section 4.2, a standpipe was installed in borehole BH3. Groundwater in the standpipe was tested in the field and a sample was recovered for laboratory analysis, following purging, by an environmental scientist on 3 July 2006. The results are presented in Table 1, Section 5.3, together with observations. In general, the groundwater testing indicates that no previous oxidation of ASS has occurred. This is supported by the results of soil analyses as discussed in the preceding sections. Management of groundwater at this site should follow normal best practice, with measures to be outlined in an Environmental Management Plan (EMP). 6.7 Recommendations As there is likely to be excavation as part of the proposed development intersecting soils with existing acidity, there will be a requirement for management of that acidity. The likely volume of disturbance and the level of treatment required indicates that management of Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 2 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.