Council archive · source document
Application part 2 [As Published] · 142007.1242
June 2006 -9- 06683025-1000(AA) existing acidity at this site would be classified as Category XH (extra high level) treatment in accordance with SPP2/02 Guideline - Table 2. The SPP2/02 Guidelines require that for Category XH treatment an EMP must be provided. Furthermore Section 9.15 of SP2/02 Guidelines stipulates that “this plan should provide for ongoing management and monitoring of the effects of disturbance of ASS through the construction and operation of the project and describe the construction schedules and environmental management procedures. The project should also be staged so that the potential effects on any area disturbed at any one time is limited and easily managed.”. Recommendations on strategies to be included in the EMP are discussed as follows. 6.7.1 Treatment of Excavated Soil It is expected that earthworks on this site will comprise cutting and filling for roads and trenching for the installation of various underground services. Management of soil excavated below RL 5 m AHD is to be carried out as follows: ¢ Lime treatment is to be carried out on prepared pads and it would be prudent to make such pads the permanent placement area. The earthworks strategy is to be formulated to provide pads of appropriate size for practical spreading, mixing and drying, so that adequate time is available to complete the treatment and validation before placing the next layer. e Stormwater should be diverted away from treatment/fill areas by clay bunds and/or grassed swales. e Treatment should be carried out by spreading the soil in maximum 300 mm loose thickness layers and moisture conditioning before spreading lime at the appropriate application rate. The soil may require reworking several times to achieve adequate mixing of the neutralising agent and/or drying of the soil to optimum moisture content to achieve compaction to an adequate engineering standard. ¢ It is proposed that the treatment level is based on the maximum values determined by this investigation to be 5 kg.Lime/m? of soil excavated from 0.0 to 1 m and a rate of 18 kg.Lime/m! of soil excavated from below | m. ¢ Verification sampling and analysis is to be carried out on the treated soil to confirm that appropriate amounts of the neutralising agent have been incorporated into the soil. Due to the lack of pyritic material in the site soils, it is recommended that Total Potential Acidity (TPA) testing would be an appropriate method for verification. Only verification samples with laboratory pH values of less than pH6.5 would require analysis for remaining actual acidity. Verification samples with laboratory pH values of greater than pH6.5 would not require further testing. Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 2 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.