June 2006 -10- 06683025-1000(AA)

 

e For trenches, provided that excavated material is replaced within two to three days, lime
treatment will not be required.

6.7.2. Stockpiles and Handling

Wherever practical the earthworks handling should involve transport directly from cut to
treatment/fill areas and stockpiling of untreated soils should be avoided. The recommended
maximum time period for which soils can be temporarily stockpiled without treatment is 2 to
3 days, based on the nature of the site soils.

Where it is necessary to stockpile untreated soils for moderate periods (up to 3 weeks) the
following additional management measures must be followed:

e Stockpiles are to be contained by bunds with stormwater runoff directed to a collection
sump. Bunds are to be constructed from low permeability materials that have been fully
lime treated.

« A guard layer of neutralising agent should be spread across the soil surface prior to
placement of the stockpile. The rate of neutralising agent applied should be based on 0.3
times the average total potential plus existing acidity for every 1 m height of soil in the
stockpile (but no less than 5 kg Lime/m?).

e Keep the surface of the stockpile moist using a spray of water, with care to avoid over-
wetting.

6.7.3. Environmental Monitoring

It will be necessary to carry out monitoring of surface water and groundwater both during and
after construction in order to confirm the adequacy of the management measures and to limit
detrimental off-site impact. Such monitoring, together with corrective measures, must be
detailed in an EMP.

We would be pleased to answer any questions about this important information from the
reader of this report.

7.0 IMPORTANT INFORMATION

Your attention is drawn to the document - “Important Information About Your Environmental
Site Assessment”, which is included in Appendix D of this report. This document has been
prepared by the ASFE (Professional Firms Practicing in the Geosciences), of which Golder
Associates is a member. The statements presented in this document are intended to advise
you of what your realistic expectations of this report should be, and to present you with
recommendations on how to minimise the risks associated with the groundwork’s for this
project. The document is not intended to reduce the level of responsibility accepted by

Golder Associates

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 2 [As Published].pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.