Council archive · source document
Application part 2 [As Published] · 142007.1242
June 2006 -10- 06683025-1000(AA) e For trenches, provided that excavated material is replaced within two to three days, lime treatment will not be required. 6.7.2. Stockpiles and Handling Wherever practical the earthworks handling should involve transport directly from cut to treatment/fill areas and stockpiling of untreated soils should be avoided. The recommended maximum time period for which soils can be temporarily stockpiled without treatment is 2 to 3 days, based on the nature of the site soils. Where it is necessary to stockpile untreated soils for moderate periods (up to 3 weeks) the following additional management measures must be followed: e Stockpiles are to be contained by bunds with stormwater runoff directed to a collection sump. Bunds are to be constructed from low permeability materials that have been fully lime treated. « A guard layer of neutralising agent should be spread across the soil surface prior to placement of the stockpile. The rate of neutralising agent applied should be based on 0.3 times the average total potential plus existing acidity for every 1 m height of soil in the stockpile (but no less than 5 kg Lime/m?). e Keep the surface of the stockpile moist using a spray of water, with care to avoid over- wetting. 6.7.3. Environmental Monitoring It will be necessary to carry out monitoring of surface water and groundwater both during and after construction in order to confirm the adequacy of the management measures and to limit detrimental off-site impact. Such monitoring, together with corrective measures, must be detailed in an EMP. We would be pleased to answer any questions about this important information from the reader of this report. 7.0 IMPORTANT INFORMATION Your attention is drawn to the document - “Important Information About Your Environmental Site Assessment”, which is included in Appendix D of this report. This document has been prepared by the ASFE (Professional Firms Practicing in the Geosciences), of which Golder Associates is a member. The statements presented in this document are intended to advise you of what your realistic expectations of this report should be, and to present you with recommendations on how to minimise the risks associated with the groundwork’s for this project. The document is not intended to reduce the level of responsibility accepted by Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 2 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.