important Information About Your

Environmental Site Assessment

 
 
 
 
 

Reasons For Conducting An ESA
ESA’s are typically, though not exclusively carried out
in the following circumstances :

e as pre-acquisition assessments, on behalf of either
purchaser or vendor, when a property is to be sold;

« as pre-development assessments, when a property or
area of land is to be redeveloped or have its use changed,
for example, from a factory to a residential subdivision;
¢ as pre-development assessments of greenfield sites,
to establish “baseline” conditions and assess
environmental, geological and hydrogeological
constraints to the development of, for example, a
Jandfill; and

¢ as audits of the environmental effects of an ongoing
operation.

Each of these circumstances requires a specific approach
to the assessment of soil and groundwater
contamination. In all cases, however, the objective is to
identify and if possible quantify the risks which
unrecognised contamination poses to the proposed
activity. Such risks may be both financial, for example,
clean-up costs or limitations on site use, and physical,
for example, health risks to site users or the public.

The Limitations of An ESA

Although the information provided by an ESA can
reduce exposure to such risks, no ESA, however
diligently carried out, can eliminate them. Even a
rigorous professional assessment may fail to detect all
contamination on a site. Contaminants may be present
in areas that were not surveyed or sampled, or may
migrate to areas which showed no signs of
contamination when sampled.

An ESA Report Is Based On A Unique Set of

Project Specific Factors

Your environmental rcport should not bc used :

© When the nature of the proposed development is
changed, for example, if a residential development
is proposed instead of a commercial one,

‘Geosciences, of which Golder Associat
‘ation of your Environ:

 
 
  
 

1y Ltd usin guidelines prepared by:

tal Site Ass

   

« When the size or configuration of the proposed
development is altered,

e when the location or orientation of the proposed
structure is modified;

e When there is a change of ownership; or

e For the application to an adjacent site.

To help avoid costly problems, refer to your consultant
to determine how any factors which have changed
subsequent to the date of the report may affect its
récommendations.

ESA “Findings” Are Professional Estimates

Site assessment identifies actual subsurface conditions
only at those points where samples are taken, when they
are taken. Data derived through sampling and
subsequent laboratory testing are interpreted by
geologists, engineers or scientists who then render an
opinion about overall subsurface conditions, the nature
and extent of contamination, its likely impact on the
proposed development and appropriate remediation
measures. Actual conditions may differ from thosc
inferred to exist, because no professional, no matter how
qualified, and no subsurface exploration program, no
matter how comprehensive, can reveal what is hidden by
earth, rock and time. The actual interface between
materials may be far more gradual or abrupt than a
report indicates. Actual conditions in areas not sampled
may differ from predictions. Nothing caa be done to
prevent the unanticipated, but steps can be taken to help
minimise its impact. For this reason, owners should
retain the services of their consultants through the
development stage, to identify variations, conduct
additional tests which may be needed, and to
recommend solutions to problems encountered on site.

Subsurface Conditions Can Change

Subsurface conditions are changed by natural processes
and the activity of man. Because an ESA report is based
on conditions which existed at the time of subsurface
exploration, decisions should not be based on an ESA
report whose adequacy may have been affected by time.
Speak with the consultant to learn if additional tests are
advisable.

Page | of 2
GAP Form No 4

 

 

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Application part 2 [As Published].pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.