Council archive · source document
Application part 2 [As Published] · 142007.1242
oT St meme ge ee meee mom rd “A ESA Services Are Performed For Specific Piirposes And Persons very study and ESA report is prepared in response to a specific Bricf to meet the specific needs of specific individuals. A report prepared for a consulting civil engineer may not be adequate for a constriction contractor, or even some other consulting civil engineer. A report should not be used by other persons for any purpose, or by the client for a different purpose. No individual other than the client should apply a report even apparently for its intended purpose without first conferring with the consultant. No person should apply a report for any purpose other than that originally contemplated without first conferring with the consultant, An ESA Report Is Subject To Misinterpretation Costly problems can occur when design professionals develop their plans based on misinterpretations of an ESA. To help avoid these problems, the environmental consultant should be retained to work with appropriate | design professionals to explain relevant findings and to review the adequacy of their plans and specifications relative to contamination issues. Logs Should Not Be Separated From The Engineering Report Final borehole or test pit logs are developed by environmental scientists, engineers or geologists based upon their interpretation of field logs (assembled by site personnel) and laboratory evaluation of field samples. Only final logs are customarily included in our reports. These logs should no under any circumstances be redrawn for inclusion in site remediation or other design drawings, because drafters may commit errors or omissions in the transfer process. Although photographic reproduction eliminates this problem, it does nothing to minimise the possibility of contractors misinterpreting the logs during bid preparation. When this occurs, delays, disputes and unanticipated costs are the all-too-frequent result. To reduce the likelihood of boring log misinterpretation, the complete report must be available to persons or organisations involved in the project, such as contractors, for their use. Those who do not provide such access may proceed under the mistaken impression that simply disclaiming responsibility for the accuracy of subsurface information always insulates them from attendant liability. Providing all the available information to persons and organisations such as contractors helps prevent costly construction problems and the adversarial attitudes which may aggravate them to disproportionate scale. Read Responsibility Clauses Closely Because an ESA is based extensively on judgement and opinion, it is necessarily Icss exact than other disciplines. This situation has resulted in wholly unwarranted claims being lodged against consultants. To help prevent this problem, model clauses have been developed for use in written transmittals. These are not exculpatory clauses designed to foist fiabilities onto some other party. Rather, they are definitive clauses which identify where your consultant’s responsibilities begin and end. Their use helps all parties involved recognise their individual responsibilities and take appropriate action. Some of these definitive clauses are likely to appear in your ESA report, and you are encouraged to read them closely. Your consultant will be pleased to give full and frank answers to your questions. Page 2 of 2 GAP - Form No 4 Ril ee eee ee
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 2 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.