Environmental Protection Act 1994
Chapter 7 Environmental management
Part 8 Contaminated land
[s 403]
(c) make provision for monitoring and reporting
compliance with the plan.
Subdivision 2 Procedure for approval of site
management plan
403 Voluntary submission of draft site management plan
(1) A person may, after submitting a site investigation report,
submit to the administering authority for approval a draft site
management plan for land for which particulars are recorded
in the environmental management register.
Note—
See section 565 (Only suitably qualified person can perform regulatory
functions).
(2) However, if the person intending to submit the draft plan for
approval is not the land’s owner, the person must obtain the
owner’s consent before submitting it.
404 Application for approval of site management plan
An application for the approval of a site management plan
must—
(a) be made to the administering authority in the approved
form; and
(b) be supported by enough information to enable the
administering authority to decide the application,
including, for example—
(i) a report on the scientific investigation of the
contamination of the land; and
(ii) relevant information about the likely risks to the
environment from the hazardous contaminant
contaminating the land; and
Page 328 Current as at 20 February 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.